From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, AECM-80-247, NUDOCS 8010210355
Download: ML19344B506 (3)


Text

o 1

MISSISSIPPI POWER & LIGHT COMPANY

= Helping Build A1ississippi talanlasses P. O. B O X 16 4 0, J A C K S O N, MI S SIS S I P PI 39205 s49 esp.uccAucay.a. October 10, 1980 ass STA*s? VtCg pagliOENT Office of Inspection & Enforcement U. S. Nuclear Regulatory Cecmission Regicn II 101 Marietta Street, N.'4.

Suite 3100 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Director

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/15526 PRD-80/22, Final Report, Incorrect Pipe Supplied by Texas Pipe Bending AECM-80/247

Reference:

1) AECM-80/108, S/23/80
2) AECM-80/199, 8/29/80 On April 24, 1980, Mississippi Power & Light Company noti-fied Mr. M. Hunt of your office of a Potentially Reportable De-ficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) construc-tion site. The deficiency concerns the apparent failure of Texas Pipe Bending to supply pipe in accordance with design require-ments. Pipe supplied for Spool Q1G41G015-06 was Schedule 40.

The design drawings for the system in questior., Fuel Pool Cooling and Cleanup, require the use of Schedule 10 Pipe.

It has been determined that the heavier wall of this spool would not cause an overstressed condition on the pipe support system in any application at the GGNS. This deficiency, were it to have re ained uncorrected throughout the lifetime of the plant, would not have affected the safety of plant operations.

We have, therefore, concluded tha t this item is not reportable under either 10CFR50.55(e) or 10CFR21. Our final report of this matter is attached.

Yours truly, d

pf %EW pJ.P.McGaughy,Jr.

WDH:mt Attachment 5/j h Member Middle South Utilities System

+

/ MlOCISSIPPI POWER O LI2HT COMPANY Mr.'J. P. O'Reilly AECM-80/247 NRC Page 2 l

l cc: Mr. N. L. Stampley.

l Mr. R. 3. McGehee Mr. T.'B. Conner l Mr. Victor Stallo, Director l Division of-Inspection & Enforcement U. 'S. Nuclear Regulatory Comission Washington, D.C. 20555 l

l l

l' I

6" l

t

a

6 l

l l

FINAL REPORT FOR PRD-80/22 l I. Description of the Deficiency i

l A Potentially Reportable Deficiency (PRD) regarding pipe supplied by Texas Pipe Bending, which did not meet design requirements, l was identified by the Constructor at the Grand Gulf Nuclear Station

[ (GGNS). Contrary to the design drawing for the Fuel Pool & Cleanup Gystem (System G41). Schedule 40 pipe was substituted for Schedule 10 pipe. The concern was that this deviation could affect the design adequacy of the piping supports.

II. Safety Implications l

l An analysis was performed on all piping applications using spools j supplied by Texas Pipe Bending where heavier walled pipe was used I without approval. The result of the evaluation was that the j heavier pipe would not adversely affect the safety of plant oper-ations at GGNS.

The increased wall thickness, from use of Schedule 40 pipe in

( lieu of Schedule 10 pipe, was found on only 150' PSIA stainless

! steel, nuclear class 3 bends. The change in wall thickness was l incorporated into a stress analysis for the piping system. The l results of this analysis showed the stresses to be within allowable l limits. No additional supports are required, and no changes to the j existing supports need to be made.

III. Correc:ive Actions Taken l The pipe supplier (Texas Pipe Bending) has been notified that all

~

l deviations from our specifications require our approval prior to implementation. The analysis revealed that no remedial corrective