ML20198P112

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1997 for Grand Gulf Nuclear Station,Unit 1
ML20198P112
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/31/1997
From: Lin S
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20198P117 List:
References
NUDOCS 9801220009
Download: ML20198P112 (3)


Text

_ _ - _ _ _ _ _

t

.i to GNRO 98/OOOO6 DOCKET NO 50-416 DATE 01/07/98 COMPLETED BY S. D. Lin TELEPHONE (601) 437-6793 OPERATING STATUS 1.

Unit Name: GGNS UNIT 1 2.

Reporting Period: December 1997 3.

Licensed Thermal Power (MWt): 3833 MWT 4.

Nameplate Rating (Gross MWe). 1372.5 MWE 5.

Design Electrical Rating (Net MWe): 1250 MWE 6.

Maximum Dependable Capacity (Gross MWe): 1250 MWE 7.

Maximum Dependable Capacity (Net MWe):

1200 MWE 8.

If changes occur in Capacity Ratings (Items 3 through 7) Since Last Report. Give Reason:

N/A 9.

Power Level To Which Restricted, if Any (Net MWe):

N/A

10. Reasons For Restrictions, if Any:

N/A Th_ is Month Yr to Date Cumulative *

11. Hours in Repo* ting Period 744 8,760 115,720
12. Number of Hours Reactor was Crit cal 744.0 8,760.0 96,739.0
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 744.0 8,760.0 93,636.9
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 2,766,051 33,291,259 336,4F 295
17. Gross Electrical Energy Generated (MWH) 941,640 11,246,869 108,Ei c,800
18. Net Electrical Energy Generated (MWH) 905,172 10,817,564 104,041,909
19. Unit Service Factor 100.0 100.0 82.6
20. Unit Availability Factor 100.0 100.0 82.6
21. Unit Capacity Factor (Using MDC Net) 101.4 102.9 81.4
22. Unit Capacity Factor (Using DER Net) 97.3 98.8 74.6
23. Unit Forced Outage Rate 0.0 0.0 5.7
24. ' Shutdowns Seneduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuelina Outage #9 beginning on 04/11/98 @0000 hour for 32 Days

25. If Shut Down At End of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operatio7):

Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 07/01/85 10/20/84 COMMERCIAL OPERATIO*

  • ltems 11 through 18 are cumulative results since initial electricity 9801220009 900114 PDR ADOCK 05000416 PDR R

+

fl* to GNRO 98/OOOO6:

DOCKET NO 50 416-DATE 01/07/98-COMPI FTED BY S. D. Lir TELEPHONE

-(601) 437-6793 MONTH ' December 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Nat)-

(MWe-Net) 1 1256 17 1209 2

1240 18 1259 7

- 3 1248 19 1252 4

1262 20 1245 5'

1266 21 1091 6

1269 22 1252

-7 1269 23 1254 8

1255 24 1253 9

1244 25 1264

.10 1261 26 1266 11

-1270 27 1241-12 1270 28 1266 13-1210 29 1265 14 941-30 1262 15.

602

31

'1266

_16 1148 4

1 4

-______.-_____m_-

5 4

1 s....

  • to GNRO-98/00006 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

'50-416 UNIT NAME '

GGNS Unit 1 DATE-01/07/98 COMPLETED BY S. D. Lin TELEPHONE (60D437-6793 REPORT MONTH Decer.er 1097 No.

Date Type (1).

Duration Reason Method Of Licensee Event System Code ' lCouyum.ui Cause & Corrective Action To Prevent Hours -

(2)

Shutting Down Report #

(4)

Code (5)

Recurrence (C&CA)

Reactor (3)

Srf.002 12/14/97-F 0.

A 6

N/A N/A N/A

j. Reactor power et to appromanately

' 55% to repair inam condenser tube leak.

Turtnine Stop and Control Valve operability surveillance test and control rod sequence exchange sure perfortned ahead of the original schedule, taking advantage of the

_ low-power operation.

1 2

3

'4 5

F: Forced Reason:

Method:

Exhibit G - Instructions for Preparation of EGibit 1 Same Source

-- S: Scheduled A-Equipment Failure (Explain) 1-Manual

- Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-Ol61)

C-Refueling 3-Automatic Scram D-Regulatory Restrictiou 4-Contmued l

E-Operator Training &

5-Reduced load

' Licensing Examination 6-Other F-Administrative

' G-Operational Error (Explain)

H-Other (Explain) t 9 '-

1 4

,,6m

--