.i to GNRO 98/OOOO6 DOCKET NO 50-416 DATE 01/07/98 COMPLETED BY S. D. Lin TELEPHONE (601) 437-6793 OPERATING STATUS 1.
Unit Name: GGNS UNIT 1 2.
Reporting Period: December 1997 3.
Licensed Thermal Power (MWt): 3833 MWT 4.
Nameplate Rating (Gross MWe). 1372.5 MWE 5.
Design Electrical Rating (Net MWe): 1250 MWE 6.
Maximum Dependable Capacity (Gross MWe): 1250 MWE 7.
Maximum Dependable Capacity (Net MWe):
1200 MWE 8.
If changes occur in Capacity Ratings (Items 3 through 7) Since Last Report. Give Reason:
N/A 9.
Power Level To Which Restricted, if Any (Net MWe):
N/A
- 10. Reasons For Restrictions, if Any:
N/A Th_ is Month Yr to Date Cumulative *
- 11. Hours in Repo* ting Period 744 8,760 115,720
- 12. Number of Hours Reactor was Crit cal 744.0 8,760.0 96,739.0
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 744.0 8,760.0 93,636.9
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2,766,051 33,291,259 336,4F 295
- 17. Gross Electrical Energy Generated (MWH) 941,640 11,246,869 108,Ei c,800
- 18. Net Electrical Energy Generated (MWH) 905,172 10,817,564 104,041,909
- 19. Unit Service Factor 100.0 100.0 82.6
- 20. Unit Availability Factor 100.0 100.0 82.6
- 21. Unit Capacity Factor (Using MDC Net) 101.4 102.9 81.4
- 22. Unit Capacity Factor (Using DER Net) 97.3 98.8 74.6
- 23. Unit Forced Outage Rate 0.0 0.0 5.7
- 24. ' Shutdowns Seneduled Over Next 6 Months (Type, Date, and Duration of Each):
Refuelina Outage #9 beginning on 04/11/98 @0000 hour for 32 Days
- 25. If Shut Down At End of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operatio7):
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 07/01/85 10/20/84 COMMERCIAL OPERATIO*
- ltems 11 through 18 are cumulative results since initial electricity 9801220009 900114 PDR ADOCK 05000416 PDR R
+
fl* to GNRO 98/OOOO6:
DOCKET NO 50 416-DATE 01/07/98-COMPI FTED BY S. D. Lir TELEPHONE
-(601) 437-6793 MONTH ' December 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Nat)-
(MWe-Net) 1 1256 17 1209 2
1240 18 1259 7
- - 3 1248 19 1252 4
1262 20 1245 5'
1266 21 1091 6
1269 22 1252
-7 1269 23 1254 8
1255 24 1253 9
1244 25 1264
.10 1261 26 1266 11
-1270 27 1241-12 1270 28 1266 13-1210 29 1265 14 941-30 1262 15.
602
- 31
'1266
_16 1148 4
1 4
-______.-_____m_-
5 4
1 s....
- to GNRO-98/00006 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
'50-416 UNIT NAME '
GGNS Unit 1 DATE-01/07/98 COMPLETED BY S. D. Lin TELEPHONE (60D437-6793 REPORT MONTH Decer.er 1097 No.
Date Type (1).
Duration Reason Method Of Licensee Event System Code ' lCouyum.ui Cause & Corrective Action To Prevent Hours -
(2)
Shutting Down Report #
(4)
Code (5)
Recurrence (C&CA)
Reactor (3)
Srf.002 12/14/97-F 0.
A 6
N/A N/A N/A
- j. Reactor power et to appromanately
' 55% to repair inam condenser tube leak.
Turtnine Stop and Control Valve operability surveillance test and control rod sequence exchange sure perfortned ahead of the original schedule, taking advantage of the
_ low-power operation.
1 2
3
'4 5
F: Forced Reason:
Method:
Exhibit G - Instructions for Preparation of EGibit 1 Same Source
-- S: Scheduled A-Equipment Failure (Explain) 1-Manual
- Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-Ol61)
C-Refueling 3-Automatic Scram D-Regulatory Restrictiou 4-Contmued l
E-Operator Training &
5-Reduced load
' Licensing Examination 6-Other F-Administrative
' G-Operational Error (Explain)
H-Other (Explain) t 9 '-
1 4
,,6m
--