ML20154Q314
ML20154Q314 | |
Person / Time | |
---|---|
Site: | Perry, Grand Gulf, River Bend, South Texas, 05000000 |
Issue date: | 03/10/1986 |
From: | Godfrey D WOOLLEY MANUFACTURING DIV. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
References | |
REF-PT21-86, REF-PT21-86-110-000 PT21-86-110, PT21-86-110-000, NUDOCS 8603210127 | |
Download: ML20154Q314 (2) | |
Category:DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21)
MONTHYEARML18016A9011999-04-12012 April 1999
[Table view]Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted ML20217D5701998-03-20020 March 1998 Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010 ML20203H9891997-12-12012 December 1997 Part 21 Rept Re Potential Manufacturing Defect of Enterprise DSR-4 & DSRV-4 Edgs.Cooper Energy Svcs Supplied 1A-7840 Adjusting Screw to Affected Utils & Sites.River Bend Station Replaced W/Acceptable Assemblies ML20140A9661997-05-29029 May 1997 Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum ML20140G4481997-05-0101 May 1997 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages ML20210E3591997-03-27027 March 1997 Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A ML20137F3221997-03-26026 March 1997 Part 21 Rept Re Perry Nuclear Power Plant Experiencing False Trip of K600S K-Line Low Voltage Circuit Breaker w/SS-5 Solid State Trip Device.Breaker Removed from Svc & Returned to Abb for Analysis ML20137G6261997-03-25025 March 1997 Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber ML20133E8001997-01-0808 January 1997 Deficiency Rept Re Nonconformance Related to Masterflow 713 Grout,Which Master Builders,Inc Has Supplied as Nuclear SR Product to 18 Npps.Cause Unknown.Requests That Listed Info Be Provided to Gain Insight as to Scope & Possible Cause ML20134H3361996-11-0505 November 1996 Part 21 Rept Re Defective Inner Thrust Bearing 1801461-01 Used in PSA 35 Mechanical Shock Arrestor Used as Restraint on Piping Sys for Nuclear Generating Plant.Lot of Defective Parts Located & Isolated to Three Customers ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20115D2001996-07-0909 July 1996 Part 21 Rept Re Mfg Defect of Enterprise DSR-4 & DSRV-4 Edgs,Originally Mfg by Calcon Corp.Amot Control Corp Purchased Calcon Product Line & Maintains Design & Production.Valves Returned to Cooper Energy Svcs on 960131 ML20117G4641996-05-14014 May 1996 Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs ML20085J6591995-06-15015 June 1995 Potential Part 21 Rept Re Failure of Air Cylinder Mfg by Bellofram Corp at Ggns.Failure Discussed W/Mfg & Judged to Be Isolated Incident W/No Further C/A Required at Affected Utils or Cooper-Bessemer ML20083R9101995-04-26026 April 1995 Final Part 21 Rept Re Kepco,Inc Model RMX24-D-20804 Power Supplies in Which Transistors Q15 &/Or Q16 Failed to Open & R1 Was Open.Replacement of Transmitters w/XSIS-095 Along W/ Replacement of Electrolytic Capacitors Provides Solution ML20078C2591994-10-19019 October 1994 Part 21 Rept Re Valtek Valves Addressed in NRC Part 21 Log Number 93-325,installed at South Texas Project.Valtek re-designed Trim to Meet All Requirements & Built Parts to Retrofit in Valves ML18038A8971994-09-0707 September 1994 Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures ML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head ML20059A7181993-10-19019 October 1993 Part 21 Rept Re Defective Rocker Arms Supplied to TU & Clei. Rocker Arms Machined & Inspected to Incorrect Print & Discovered at Tu.Defective Rocker Arms Recalled from Nuclear Customers.No Corrective Action Required at Respective Utils ML20056D7071993-07-15015 July 1993 Part 21 Rept Re Reportable defect-75 PSIG Relief Check Valve 1 Npt,Emd 9521844,Kepner 416C-1-75 ML20127H2301993-01-15015 January 1993 Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites ML20126J5961992-12-31031 December 1992 Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils Encl ML20126B0421992-12-17017 December 1992 Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be Removed ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20106E1951992-11-0202 November 1992 Part 21 Rept Re Cracked Fuel Nozzle Tips Purchased from Bendic.Initially Reported on 910405.Addl Testing of Tips Performed Completed,Reviewed & Recommendation to Prevent Failures Made ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML20101R0641992-07-0808 July 1992 Part 21 Rept Re Defect in Forged Elbow SA234 Wpc.Initially Reported by Util on 920625.Connex Will Audit Quality Sys Prior to Awarding Purchase Orders to Ram Forge to Verify Measurements Taken on Elbow PY-CEI-NRR-1518, Corrected Part 21 Rept Re Defects in MSIV Poppets Supplied by Atwood & Morrill Co,Inc,Originally Submitted Via .Corrects Info in Corrective Action Section to Indicate That Poppet S/N 4 Not S/N 3 Installed at Facility1992-07-0101 July 1992 Corrected Part 21 Rept Re Defects in MSIV Poppets Supplied by Atwood & Morrill Co,Inc,Originally Submitted Via .Corrects Info in Corrective Action Section to Indicate That Poppet S/N 4 Not S/N 3 Installed at Facility ML17289A6971992-06-26026 June 1992 Amend 1 to Part 21 Rept 158 Re gear-wear Induced Failures in engine-driven Jacket Water Pump in DSRV-16-4 Standby DG Sys. Initially Reported on 911029.Grand Gulf Station Observed Wear Characteristics in as Little as 500 Operating Hours ML20101H5291992-06-25025 June 1992 Part 21 Re Forged Elbow Purchased by Connex Pipe Sys.Elbow Return to Connex to Be Repaired.Elbow Returned to Gulf States Util River Bend Station Unit 1 Along W/Associated Documentation ML20102B2071992-06-24024 June 1992 Part 21 Rept Re Cracking of Stellite 21 Hardfacing on Guide Nose of Poppets Supplied as Part of MSIV Leakage Improvement Mod.Initially Reported by Clei on 920522. Recommends That Liquid Penetrant Exam Be Performed PY-CEI-NRR-1516, Part 21 Rept Re Defects in MSIV Poppets Supplied by Atwood & Morrill Co,Inc.Intially Reported on 920522.Measures Will Be Established to Ensure That Adequate Repair Methods Are Employed During Future Repairs of Modified MSIV Poppets1992-06-19019 June 1992 Part 21 Rept Re Defects in MSIV Poppets Supplied by Atwood & Morrill Co,Inc.Intially Reported on 920522.Measures Will Be Established to Ensure That Adequate Repair Methods Are Employed During Future Repairs of Modified MSIV Poppets ML20101G9211992-06-19019 June 1992 Part 21 Rept Re Rotated Fuel Assemblies Sometimes Inappropriate for Modern Type Fuel Designs.Reevaluation Concluded That Inadvertently Rotated Fuel Assembly for BWR 4/5 C-lattice Plant Could Not Exceed TS Safety Limit MCPR RBG-37042, Deficiency Rept:Employee Informed NRC of Defect in Forged Replacement Elbow Involving Numerous Areas Where Required Code & Design Min Wall Thickness Was Not Maintained.Licensee Returned Forged Elbow to Supplier1992-06-18018 June 1992 Deficiency Rept:Employee Informed NRC of Defect in Forged Replacement Elbow Involving Numerous Areas Where Required Code & Design Min Wall Thickness Was Not Maintained.Licensee Returned Forged Elbow to Supplier ML20097H1531992-05-22022 May 1992 Part 21 Rept Re Defect in MSIV Poppets Supplied to Plant by Atwood & Morrill Co,Inc.Post Weld Heat Treatment Prescribed & Performed for Poppet to Alleviate Concerns Re Residual Stresses Present.Next Rept Will Be Submitted within 30 Days ML20090L8801992-03-18018 March 1992 Part 21 Re Cracked Piston Castings Received from Acme Foundry,Fairbanks Morse & General Casting.Magnetic Particle Insp of All Pistons Will Be Performed.List of Affected Plants Encl ML20094L1271992-03-13013 March 1992 Amend 1 to Part 21 Rept 159 Re Potential Defect in Power Cylinder Liner.Initially Reported on 920115.Caused by Liner/ Block Fit & Localized Matl Microstructure.All Drawings & Specs Revised to Address Matl Design Requirements ST-HL-AE-3903, Suppl to Special Rept:On 901126,fuel Oil Leak Noted at Injection Pump 1L of Standby Diesel 23.Caused by Crack on Threaded Portion of Delivery Valve Holder.Injection Pump Delivery Valve & Valve Holder Replaced on 9011271991-11-0404 November 1991 Suppl to Special Rept:On 901126,fuel Oil Leak Noted at Injection Pump 1L of Standby Diesel 23.Caused by Crack on Threaded Portion of Delivery Valve Holder.Injection Pump Delivery Valve & Valve Holder Replaced on 901127 ML20086P1591991-10-31031 October 1991 Part 21 Rept Re Microscopic Cracks in Fuel Nozzle Tip from Mfg Lot D87001.Cracks Perpendicular to Axis of Nozzle & Extend Through Case Hardening & Stop at Core.Interim/Final Report Will Be Forwarded as Further Development Occurs ML20083D7711991-09-20020 September 1991 Interim Part 21 Rept Re Failure of Fuel Injector Nozzle Tips.Initially Reported on 910723.Each Util Will Continue to Monitor Exhaust Gas Temps During Monthly Runs & Will Sample Lube Oil on Quarterly Basis for Contamination ML20081F6091991-04-23023 April 1991 Part 21 Rept Re Edward Controlled Closure Check Valves & Testable Piston Check Valves Dashplate Bolt Failures Due to Rapid Valve Opening or Impulsive Differential Pressure Surge Across Dashplate.Design Changes Recommended ML20072S9501991-04-0505 April 1991 Interim Part 21 Rept Re Failure of Standby Diesel Generator Fuel Nozzle Tips Mfg by Bendix.Initially Reported on 910327. on 910327 Memo Issued Requesting Recall of Affected Parts. Technical Evaluation Underway by Util ML20072T3081991-04-0404 April 1991 Advises That Ongoing Investigation Into Emergency Diesel Generator Failure Raised Questions Re Fuel Nozzle Tips Furnished by Cooper Energy Svc.Records Indicate Tips Supplied to Company PY-CEI-NRR-1303, Part 21 Rept Re Finding That Nitrile Rather than Ethylene Propylene Diene Monomer (Epdm) Used as Seal Matl in Several E-sys Hydraulic Snubbers.Proper Seal Matl (Epdm) Used to Rebuild Snubbers & Leaking Valves Repaired1991-02-0404 February 1991 Part 21 Rept Re Finding That Nitrile Rather than Ethylene Propylene Diene Monomer (Epdm) Used as Seal Matl in Several E-sys Hydraulic Snubbers.Proper Seal Matl (Epdm) Used to Rebuild Snubbers & Leaking Valves Repaired ST-HL-AE-3655, Deficiency Rept & Part 21 Rept Re Change in Commitment to Procure Class 1E Battery Cables from Gould Nuclear Batteries Inc.Gould Discontinued Implementation of QA Program & Removed from Util Approved Vendor List1991-01-0303 January 1991 Deficiency Rept & Part 21 Rept Re Change in Commitment to Procure Class 1E Battery Cables from Gould Nuclear Batteries Inc.Gould Discontinued Implementation of QA Program & Removed from Util Approved Vendor List 1999-04-12 Category:TEXT-SAFETY REPORT MONTHYEARML20217K9441999-10-15015 October 1999
[Table view]SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K1231999-10-14014 October 1999 Revised Positions for DBNPS & Pnpp QA Program ML20217F9921999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With PY-CEI-NRR-2437, Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With ML20212J2011999-09-30030 September 1999 Safety Evaluation Supporting Transfer of Dl Ownership Interest in Pnpp to Ceico NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr RBG-45144, Monthly Operating Rept for Sept 1999 for River Bend Station. with1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for River Bend Station. with ML20212F5641999-09-23023 September 1999 SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity Limits ML20211Q3171999-09-0909 September 1999 Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 ML20216G1201999-09-0909 September 1999 Rev 3 to Rbs,Cycle 9 Colr ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With RBG-45110, Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With ML20216E4881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With PY-CEI-NRR-2429, Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection1999-08-0606 August 1999 Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection ML20210K4721999-08-0303 August 1999 SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20211A6921999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Grand Gulf Nuclear Station,Unit 1.With PY-CEI-NRR-2424, Monthly Operating Rept for July 1999 for Perry Npp.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Perry Npp.With ML20210J3851999-07-28028 July 1999 Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20209J1961999-07-12012 July 1999 Special Rept 99-001:on 990528,smoke Detectors Failed to Alarm During Performance of Routine Channel Functional Testing.Applicable TRM Interim Compensatory Measure of Establishing Roving Hourly Fire Patrol Was Implemented ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 ML20210C6391999-07-0202 July 1999 Rev 2 to River Bend Station,Cycle 9 Colr ML20196K4981999-07-0101 July 1999 Safety Evaluation Authorizing PRR-E12-01,PRR-E21-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01.Concludes That Alternatives Proposed by EOI Acceptable ML20209G0691999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Grand Gulf Nuclear Station,Unit 1.With PY-CEI-NRR-2416, Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With RBG-45055, Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196J8031999-06-24024 June 1999 Rev 1 to Rbs,Cycle 9 Colr ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A1951999-06-17017 June 1999 Instrument Drift Analysis ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months 1999-09-09 |
Text
. ._. __ _ _ __ _
March 10, 1986 DIRECTOR, OFFICE OF INSPECTION AND ENFORCEMENT U.S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555
Subject:
10CFR Part 21 Report W. J. WOOLLEY CO. PERSONNEL AIR LOCK INFLATABLE SEALS l
Reference:
W. J. Woolley Co. letter dated September 19, 1983 Gentlemen: i The referenced correspondence advised the NRC of a possible 10CFR Part 21 defect on inflatable door seals for personnel air locks used in reactor containment systems of nuclear power plants.
W. J. Woolley Co. identified that these seals were to be used in the following plants, and therefore, were potentially inadequate for their intended function.
Grand Gulf (Drywell Locks)
Perry (Drywell Locks) l q
River Bend (Drywell Locks)
South Texas (Containment Locks) l The purpose of this letter is to officially advise the NRC of the status regarding the subject 10CFR Part 21.
The W. J. Woolley Co. has completed the environmental qualification testing of a new inflatable seal design which possesses improved flexibility and strength characteristics. We have generated qualification reports for each of the plants listed above which address the results of our testing program as compared to the equipment qualification parameters specific to each plant.
s d /
/
S I k 7 66o310 0500o416 PDR fk}\ \
6@p\gA iAR 141986 [
W.j . WOOisey co...ss S,,,,, G,e . mo. . Ciecio .,i. Osie .3232 cgg is.n
,.osoo .1.,.
1.,,,,om. 3,3 ,, , o '
(~~ i W,J.hiley Co. l
\
l 1
Page 2 U. S. NUCLEAR REGULATORY COMMISSION March 10, 1986 As of this date, the potential problem has been reconciled with each of the respective plants.
We are presently engaged in a program for the supply of the new inflatable seals on each of the plants and should be completed with this effort by mid 1986.
We, therefore, consider the 10CFR Part 21 filed by the W. J. Woolley Co. on September 19, 1983 to be satisfactorily reconciled and, therefore, anticipate no further action relative to this subject.
If there are any further questions regarding this matter, please contact us.
Very truly yours,
. J. WOOLLEY COMPANY
(-
Dwaine A. Godfrey <r___
President cc: U. S. NRC, Region II U. S. NRC, Region III U. S. NRC, Region IV Mr. F. W. Titus, Manager Nuclear Plant Engineering MISSISSIPPI PORER & LIGHT CO.
Grand Gulf Nuclear Station Mr. R. Chapman NEWPORT NEWS INDUSTRIAL CORPORATION Perry Nuclear Power Plant M.r K. S. Jadeja STONE & WEBSTER ENGINEERING CORPORATION River Bend Station Mr. D. G. Witte PITTSBURGH-DES MOINES CORPORATION South Texas Project l
1 f
I l
J