Text
..
[
r i
- '5g Entzr Op$ rations, Inc.
Port Gibson. MS 39150 Tel (;01437 2129 Joseph E. Venabis 1
Spetember 1E, 1998 ff?"si"ig;jfff'**"'
U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C. 20555 Attention:
Document Control Desk
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-98/00076 Gentlemen-In accordance with the requirement of Technical Specification 5.6.4, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for August 1998.
If you have any questions or require additional information, please contact this office.
Yours truly, JEV/SDUcg attachments: 1.
Operating Status
}
2.
Average Daily Power Level l
3.
Unit Shutdown and Power Reductions cc:
(See Next Page)
/y> k 9809230016 900831 PDR ADOCK 05000416 R
- PDR, L;
,, to GNRO-98/00076 DOCKET NO 50-416 DATE 09/14/98 COMPLETED 8Y S. D. Lin TELEPHONE (601) 437-6793 j
OPERATING STATUS 1.
Unit Name: GGNS UNIT 1 2.
Reporting Period: Auoust 1998 3.-
Licensed Thermal Power (MWt): 3833 MWT 4.
Nameplate Rating (Gross MWe): 1372.5 MWE S.
Design Electrical Rating (Not MWe): 1250 MWE 6.
Maximum Dependable Capacity (Gross MWe): 1254 MWE 7.
Maximum Dependable Capacity (Net MWe):
1204 MWE (Effective 06/01/98) 8.
If changes occur in Capacity Ratings (items 3 through 7) Since Last Report. Give Reason: LP-B Turbine uporade durina RFO #9 9.
Power Level To Which Restricted, If Any (Not Mwe):
N/A
- 10. Reasons For Restrictions, if Any:
N/A This Month Yr to Date Cumulative *
- 11. Hours in Reporting Period 744 5.831 121,551
- 12. Number of Hours Reactor v.es Critical 744.0 4,855.5 101,594.5
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 744.0 4,751.6 98,388.5
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2,846,351 17,579,602 353,989,897
- 17. Gross Electrical Energy Generated (MWH) 949,555 5,874,822 114,393,622
- 18. Not Electrical Energy Generated (MWH) 912,785 5,643,619 109,685,528 1
- 19. Unit Service Factor 100.0 81.5 82.6
- 20. Unit Availability Factor 100.0 81.5 82.6
- 21. Unit Capacity Factor (Using MDC Net) 101.9 80.6 81.3
- 22. Unit Capacity Factor (Using DER Net) 97.7 77.4 74.7
- 23. Unit Forced Outage Rate O.
4.3 5.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): None
- 25. If Shut Down At End of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 98/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85
- Items 11 through 18 are cumulative results since initial electricity
... to GNRO-98/00076 DOCKET NO 50-416 DATE 09/14/98 COMPLETED BY S. D. Lin TELEPHONE (601) 437-6793 MONTH Auaust 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1209 17 1228 2
1224 18 1226 3
1232 19 1226 4
1233 20 1228 5
1232 21 1229 6
1232 22 1234 7
1235 23 1229 8
1231 24 1227 9
1228 25 1225
~10 1227 26 1223
'11 1227 27 1224 12 1231 28 1227 13 1235 29 1202 14 1233 30 1329 i
15 1208 31 1228 16 1232
! to GNRO-98/00076 UNrr SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-416 UNIT NAME GGNS Unit 1 DATE 09/14/98 COMPLETED BY S. D. Un TELEPHONE (601)437-6793 REPORT MONTH August 1993 No.
Date Type (1)
Duration Reason Method Of Licensee Event System Code Component Cause & Corrective Action To Prmet Hours (2)
Shuttmg Down Report #
(4)
Code (5)
Recurrence (C&CA)
Reactor (3)
None 1
2 3
4 5
F: Forced Reason-Method:
Exhibit G -Instructions for Preparation of Exhibit 1 - Same Source S: Scheduled A-Ewyw Failure (Explain) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Tramme &
5-Reduced load T_iewmeine hammation 6-Other F-Administrative G-Operational Error (Explain)
H-Other (Explain) i b
b u
..