Monthly Operating Rept for Sept 1998 for Grand Gulf Nuclear Station Unit 1.With
ML20154K239
Person / Time
Site: Grand Gulf 
Issue date: 09/30/1998
From: Lin S, Venable J
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-98-00082, GNRO-98-82, NUDOCS 9810160205
Download: ML20154K239 (6)


Text

-

........ -.~...+.. - _.. -, ~.~ ~. -

-. - ~,.. -..

.,m' L

%A Entergy operstions, Inc.

h P. O. Box 756 l

Port Gibson, MS 39150 Tol 601437 2129 l

Joseph E. Venable General Manager, Plant Operations

~

.0ctober 8,'1998 U.S. Nuclear Regulatory Commission L

Mail Station P1-137

Washington, D.C. 20555 L

Attention:

Document Control Desk

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416.

License No. NPF-29 Monthly Operating Report GNRO-98/00082 Gentlemen:

In accordance with the requirement of Technical Specification 5.6.4, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit i for September 1998.

If you have any questions or require additional information, please contact this office.

Yours truly,.

l 1

~

- Josep E. Venable

)

' General Manager, Plant Operations JEV/SDUcg attachments: 1.

. Operating Status 2.

Average Daily Power Level 3.

Unit Shutdown and Power Reductions ff

cc-(See Next Page) 7'7 t;.

i l

[

1bJU'*2

., s - m i

L f '-

9810160205 990930 P.

PDR ADOCK 05000416 "

R PDR g

- ~

... -. -. ~... -.

i L

~ October 8, 1998

' GNRO-g8/00082 Page 2 of 3 '

t ec:

Mr. D. 'C. Hintz (w/a)L Mr. N. S. Reynolds (w/a).

Mr. Jager Smith (w/a)

' Mr. H. L. Thomas (w/o) -

- Ms.- K. D. Weaver (w/a) -

L, Mr. Ellis W. Mershoff (w/a):

Regional Administrator U.S. Nuclear Regulatory Commission Region IV -

. 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011 Mr. Jack Donohew, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 l.'

I s

l

'~

l

. October 8 1998 GNRO-98/00082 L

Page 3 of 3 i1 boc:

. Ms. C. W. Gunn (w/a)

Mr. R. J. King (RB)(w/a)

Mr. S. D. Lin (w/a)

File (LCTS)/(RPTS) (w/a)

File (NS&RA) (w/a)

File (Central)(w/a) G)

' lNPO Records Center (w/a)

Mr. D. P. Galle -

700 Galleria Parkway 19025 Ruth Drive

. Atlanta, Georgia 30339-5957 Mokona, IL 60448 Mr. Marcus Ware (w/a)

Manager of Production -

South Mississippi Electric PowerAssociation

. P.O. Box 15849 Hattiesburg, MS 39401 Mr. Fred Yost (w/a)

Director Research Services Utility Data institute

- 1200 G Street, N.W.

Suite 1100 Washington, D.C. 20005 ccmail:

Mr. P. W. Alberstadt (w/a)

Mr. R. A. Wilson (w/a)

Mr. S. J. Bethay (w/o)

- Mr. M. J. Wright (w/a)

Mr. D. G. Bost (w/a)

Mr. J. W. Yelverton (ECH) (w/a)

Mr. C. A. Bottomilier (w/a)

Mr. R. N. Buckley (w/a)

Mr. S. A. Bunis (w/a)

Mr. L F. Dale (w/a)

Mr. J. G. Dewease (w/a)

Mr. C. M. Dugger (W3) (w/a)

Mr. W. A. Eaton (w/a) -

- Mr. J. L. Ensley (ESl) (w/a).

Mr. E. Ewing (W3) (w/a)

Mr. W. K. Hughey (w/a)

Mr. C. R. Hutchinson (ANO) (w/a)

Mr. D. L Janacek (w/a)

Mr. T. A. Kriesel (w/a)

Mr. R. V. Moomaw (w/a)

Mr. R. L Patterson (w/a)

Mr. J. C. Roberts (w/a)

Mr. C. F. Smith (w/a)

Ms. M. T. Sonist (LP) (w/a)

Mr. G. D. Swords (w/a) l Mr. D. W. Vinci (W3) (w/a) l L

ya9 y

(

y r,,.

++-ge

-m

_ _ _ _ _ _ _ - - -. _ _ ~. _ _. _. _ _...... _

l-j p

l L to GNRO-98/00082 l

L DOCKET NO 50-416 DATE 10/06/98 COMPLETED BY S. D. Lin TELEPHONE (601) 437-6793 L

OPERATING STATUS

' 1.

Unit Name: GGNS UNIT 1 2.

_ Reporting Period: _ September 1998

)

-3.

Licensed Thermal Power (MWt): 3833 MWT 4

Nameplate Rating (Gross MWe): 1372.5 MWE i

. 5.'

' Design Electrical Rating (Not MWe): 1250 MWE l"

- 6.

Maximum Dependable Capacity (Gross MWe): 1254 MWE L

.7.

Maximum Dependable Capacity (Net MWe):

1204 MWE 8.

If changes occur in Capacity Ratings (Items 3 through 7) Since Last Report. Give Reason:

9.

Power Level To Which Restricted, if Any (Not Mwe):

N/A

10. Reasons For Restrictions, if Any:

N/A l

l~

This Month Yr to Date Cumulative

  • ii
11. Hours in Reporting Period 720 6,551 122,271
12. ' Number of Hours Reactor was Critical

-720.0 5,575.5 102,314.5 l-

13. ' Reactor Reserve Shutdown Hours -

0 0

0 L

-14. Hours Generator On-Une 681.7 5,433.3 99,070.2

- 15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 2,490,763 20,070,365 356,480,660

- 17. Gross Electrical Energy Generated (MWH) 824,499 6,699,321 115,218,121

18. Net Electrical Energy Generated (MWH).

791,757 6,435,376 110,477,285

' 19. Unit Service Factor 94.7 82.9 82.7

20. Unit Availability Factor 94.7 82.9 82.7
21. Unit Capacity Factor (Using MDC Net) 91.3 81.7 81.4 l

22.~ Unit Capacity Factor (Using DER Net) 88.0 78.6 74.8 i

23. Unit Forced Outage Rate 5.3 4.4 5.6 l
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): None L

- 25. If Shut Down At End of Report Period. Estimated Date of Startup: N/A i

26.- Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/18/82 t

INITIAL ELECTRICITY 10/20/84_

COMMERCIAL OPERATION 07/01/85

/

J 8

i

  • Items 11 through 18 are cumulative results since initial electricity l

~...

.i 9 to GNRO-98/00082 DOCKET NO 50-416 DATE 10/06/98-COMPLETED BY.

S. D. Lin i

TELEPHONE (601) 437-6793 MONTH September 1998 DAY' AVERAGE DAILY POWER LEV' L.

DAY - AVERAGE DAILY POWER LEVEL E

(MWe-Net)

(MWe-Net) 1 l

1 1234 17 654-2 1233 18 1205 3

1236 19 1129 i

4 1235 20 1173 5

1232' 21 1230 6

1231 22 1231

-7 1231 23 1236 8

1231

-24 1240 9

1240 25 1238 10 1240 26 1238 11 1239 27 1234 l

12 849 28 1236 i

13 1148

-29 1230

.14 834 30 1229 15 25 31 1228 i

E16 -

48 l

I'

' Attachment 3 to GNRO-98/00082 ~

UNIT SHUTDOWNS AND POWER REDUCTIONS l

l REPORT MONDI September 1998 No.

Date Type (1)"

Duration Reason Method Of Licensee Event System Code -

Component Cause & Corrective Action To Prevent Hours (2)

Shutting Down Report #.

(4)

Code (5)

Recurrence (C&CA)

Reactor (3)98-008 09/12/98 S

0.

B 6-N/A N/A N/A Power reduced for control rod sequence exchange. Circulanng Water Pump B*

seat repacked at low power.98-009 09/14/98 F

0.

B 6

N/A N/A N/A Power reduced in preparanon for repaanng ruptured instrument air tubing in dryweH at low power.98-010 09/15/98 F

38.3 A

6 N/A N/A N/A Turbine inpped by Operator uten te+..im difference between two sides of LP turbme inlet exceeded 25 'F because of parnally open MSR -B' 2 -Stage d

ternperature control valves while taking MSR out of service at reduced power m preparation for drywell entry.

l 1

-2 3

4 5

l F: Forced Reason:

Method:

Exhibit G -Instructions for Preparation of Exhibit 1 - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Ucensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-0161)

{

C-Refueling 3-Automatic Scram i

D-Regulatory Restriction 4-Continued i

E-Operator Training &

5-Reduced load Ucensing Exammation 6-Other F-Administrative G-Operational Error (Explain) l H-Other (Explain) 1

-