Category:NUREG REPORTS
MONTHYEARML20195C2791998-11-0505 November 1998 BWR Feedwater Nozzle Inservice Insp Summary Rept for GGNS, NUREG-0619-00006 ML20087K3691995-07-31031 July 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Summary of Results ML20082D5261995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Supporting Melcor Calculations ML20082B7411995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Main Report and Appendices ML20073C3671994-08-31031 August 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf, Unit 1.Analysis of Core Damage Frequency from Seismic Events During Mid-Loop Operations.Main Report ML20072N9991994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internally Induced Flooding Events for Plant Operational State 5 During a Refueling. ML20072D0581994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage ML20071L5661994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Sections 1-9 ML20071L7411994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L7191994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L6111994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During Refueling Outage.Internal ML20071L5971994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Main Report ML20071L5831994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Section 10 ML20066D3421990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1. Appendices ML20066D2981990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1.Main Report ML19332G5641989-11-30030 November 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices.Continuation of Appendix D ML20248F3451989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events ML20248F3411989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices ML20214V2491987-04-30030 April 1987 Containment Event Analysis for Postulated Severe Accidents: Grand Gulf Nuclear Station,Unit 1.Draft for Comment ML20235A0481987-04-30030 April 1987 Abslysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Appendices ML20235A0161987-04-30030 April 1987 Analysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Main Report ML20234B6831987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Grand Gulf,Unit 1.Draft for Comment ML20069J4991983-03-31031 March 1983 Review of the Grand Gulf Hydrogen Igniter System ML20054L0881982-06-30030 June 1982 Safety Evaluation Report Related to the Operation of Grand Gulf Nuclear Station,Units 1 & 2.Docket Nos. 50-416 & 50-417.(Mississippi Power and Light Company) ML20039D6951981-11-30030 November 1981 Reactor Safety Study Methodology Applications Program: Grand Gulf NO.1 BWR Power Plant ML20126M2401981-05-31031 May 1981 Draft Environmental Statement Related to the Operation of the Grand Gulf Nuclear Station,Units 1 and 2.Docket Nos. 50-416 and 50-417.(Mississippi Power & Light Company,Middle South Energy,Inc.) 1998-11-05
[Table view] Category:PRESERVICE & INSERVICE INSPECTION & TEST REPTS
MONTHYEARML20195C2791998-11-0505 November 1998 BWR Feedwater Nozzle Inservice Insp Summary Rept for GGNS, NUREG-0619-00006 ML20196J1231997-07-17017 July 1997 ISI Summary Rept for GGNS Unit 1 ML20141G4231997-06-25025 June 1997 Rev 10 to GGNS-M-489.1, Program Plan for ASME Section XI ISI Plan ML20117H1331996-05-21021 May 1996 Rev 3 to Grand Gulf Nuclear Station ISI for 10-Yr Program ML20092J5321995-09-0808 September 1995 ISI Summary Rept for Grand Gulf Nuclear Station Unit 1 ML20064E6461994-02-25025 February 1994 ISI Summary Rept for Grand Gulf Nuclear Station Unit 1 for ISIs Performed Between 920610-931204 ML20104B9031992-09-0202 September 1992 Inservice Insp Summary Rept for Grand Gulf Nuclear Station Unit 1 ML19324B7901989-10-24024 October 1989 BWR Feedwater Nozzle Inservice Insp Rept for Grand Gulf Nuclear Station Unit 1. ML20247G5761989-08-15015 August 1989 Inservice Insp Summary Rept for Grand Gulf Nuclear Station Unit 1 ML20151E1791988-03-22022 March 1988 Inservice Insp Summary Rept for Grand Gulf Nuclear Station Unit 1 ML20235U8891987-06-24024 June 1987 BWR Feedwater Nozzle Inservice Insp Rept for Grand Gulf Nuclear Station Unit 1 ML20206E9961987-04-0101 April 1987 Inservice Insp Summary Rept 1998-11-05
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217F9921999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20212F5641999-09-23023 September 1999 SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity Limits ML20211Q3171999-09-0909 September 1999 Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 ML20216E4881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With ML20211A6921999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20209J1961999-07-12012 July 1999 Special Rept 99-001:on 990528,smoke Detectors Failed to Alarm During Performance of Routine Channel Functional Testing.Applicable TRM Interim Compensatory Measure of Establishing Roving Hourly Fire Patrol Was Implemented ML20196K4981999-07-0101 July 1999 Safety Evaluation Authorizing PRR-E12-01,PRR-E21-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01.Concludes That Alternatives Proposed by EOI Acceptable ML20209G0691999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20196A1161999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Grand Gulf Nuclear Station.With ML20206Q4831999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Grand Gulf Nuclear Station Unit 1.With ML20206J1201999-04-30030 April 1999 Redacted ME-98-001-00, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205P8771999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20207K5141999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20206T7991999-01-31031 January 1999 Iodine Revolatizitation in Grand Gulf Loca ML20207A8301998-12-31031 December 1998 1998 Annual Operating Rept for Ggns,Unit 1 ML20206R9501998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20206D7721998-12-31031 December 1998 South Mississippi Electric Power Association 1998 Annual Rept ML20198E2481998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20195F4121998-11-13013 November 1998 Rev 16 to GGNS-TOP-1A, Operational QA Manual (Oqam) ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program ML20195C2791998-11-0505 November 1998 BWR Feedwater Nozzle Inservice Insp Summary Rept for GGNS, NUREG-0619-00006 ML20195F4801998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual ML20154K2391998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Grand Gulf Nuclear Station Unit 1.With ML20155F1961998-09-0101 September 1998 Engineering Rept for Evaluation of BWR CR Drive Mounting Flange Cap Screw ML20153B2161998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20237B6661998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Grand Gulf Nuclear Station,Unit 1 ML20236R0231998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Grand Gulf Nuclear Station,Unit 1 ML20155J0811998-05-31031 May 1998 10CFR50.59 SE for Period Jan 1997 - May 1998 ML20249B1251998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Grand Gulf Nuclear Station,Unit 1 ML20248B6261998-05-11011 May 1998 Rev 6 to Grand Gulf Nuclear Station COLR Safety-Related ML20217Q6701998-05-0606 May 1998 SER Approving Proposed Postponement of Beginning Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) at Grand Gulf for Circumferential Shell Welds for Two Operating Cycles ML20206J1271998-04-30030 April 1998 Pressure Locking Thrust Evaluation Methodology for Flexible Wedge Gate Valves ML20247F3591998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Grand Gulf Nuclear Plant,Unit 1 ML20217M8951998-04-30030 April 1998 QA Program Manual ML20217P8281998-04-0707 April 1998 Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) ML20217P0381998-04-0606 April 1998 Safety Evaluation Supporting Amend 135 to License NPF-29 ML20217A0291998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Grand Gulf Nuclear Sation,Unit 1 ML20216J4211998-03-18018 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Grand Gulf Nuclear Station ML20216J2021998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Grand Gulf Nuclear Station,Unit 1 ML20203A2891998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Grand Gulf Nuclear Station ML20247B4111997-12-31031 December 1997 1997 Annual Financial Rept for South Mississippi Electric Power Association ML20203H9741997-12-31031 December 1997 1997 Annual Operating Rept, for Ggns,Unit 1 ML20198P1121997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Grand Gulf Nuclear Station,Unit 1 ML20203B5581997-12-0404 December 1997 Special Rept 97-003:on 971111,valid Failure of Div 2 EDG Occurred,Due to Jacket Water Leak.Failure Reported,Per Plant Technical Requirements Manual Section 7.7.2.2 ML20203K4031997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Grand Gulf Nuclear Station,Unit 1 ML20199H3711997-11-19019 November 1997 SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50 ML20199F3431997-11-18018 November 1997 SER Accepting Rev 15 of Operational Quality Assurance Manual for Grand Gulf Nuclear Station,Unit 1 1999-09-09
[Table view] |
Text
- _ . _ . _ __
l
' l
- l. ,
BWR FEEDWATER NOZZLE INSERVICE INSPECTION
SUMMARY
REPORT FOR GRAND GULF NUCLEAR STATION COMMERCIAL OPERATING DATE: JULY 1,1985 1
REPORT NUMBER: NUREG-0619-00006
REFERENCE:
NUREG-0619 L I OWNER / OPERATOR ,
1 I
ENTERGY OPERATIONS, INC.
ECHELON ONE !
P. O. BOX 31995 i JACKSON,MS. 39286-1995 i i
I l
9811170068 981103 PDR 0 ADOCK 05000416 PDR l.
REPORT NUMBER: NUREO-0619-00006 l
4 PEFERENCE: NUREG-0619 l i 1 l
BWR FEEDWATER NOZZLE INSERVICE INSPECTION
SUMMARY
REPORT i
FOR i l
- GRAND GULF NUCLEAR STATION l
COMMERCIAL OPERATING DATE: JULY 1,1985 l l OWNER / OPERATOR j- ENTERGY OPERATIONS, INC.
1 ECHELON ONE l P. O. BOX 31995 JACKSON,MS. 39286-1995
- Prepared By Reviewed By Approved By 9A.,s3 G&m -
- [80lw, DOCUMENT COMPLETION DATE I ll S '
9%
(
(.
o REPORT NUMBER NUREG-0619-00006 According to NU' REG-0619, a detailed report must be submitted to the Nuclear Reg statory Commission discussing the inspections performed on the Feedwater Nozzle Blend Radii and Bore Regicns (Inner Radius) and Nozzle-to-Safe-End Welds. Program Plan M-489.1, Inservice Inspection Program, is in compliance with the requirements of Table 2 of NUREG-0619, which require augmented volumetric examinations of these areas. This report summarizes the inspections performed since the previous report through RFO9.
The volumetric exams were performed by Framatome Technologies under contract to Entergy Operations, Inc. The data reports for all examinations are available for review upon request.
To provide the Nuclear Regulatory Commission with the requested information, this report is being presented in the following format. Each item listed in Paragraph 4.4.3.l(2) of NUREG-
. 0619 is addressed sepsrately.
- a. Startup/ Shutdown Cycles l
- 1. Total number ofcycles at Grand Gulf: 111; total includes 46 scrams,65 heatups and their respective cooldowns.
- 2. Total number of cycles since the previous volumetric examinations on the bler.d radii: 8; total includes 5 scrams,3 heatups and their respective cooldowns.
- 3. Total number of cycles since the previous surface examinations on the blend radii: 111; tocal includes 46 scrams,65 heatups and their respective cooldowns.
- 4. Total number of cycles since the previous volumetric examinations on the nozzle-to-safe-end welds: 8; total includes 5 scrams,3 Leatups and their respective cooldowns.
- 5. Total number of cycles since the previous surface examinations on the nozzle-to-safe-end welds:
N4A and N4B: 55; total includes 25 scrams,30 heatups and their respective cooldowns.
N4C and N4D: 47; total includes 20 scrams,27 heatups and their respective cooldowns.
N4E and N4F: 24; total includes 10 scrams.14 heatups and their respective cooldowns.
- b. Summary of Methods Used and Results of Previous Inspections The volumetric exams performed during RFO9 were the sixth examinations performed in accordance with NUREG-0619 since the prese vice examinations. During RFO9, volumetric exams were performed on all six (6) of the nozzle blend radii and bore regions (inner radius) and two of the six nozzle-to-safe end welds, N4A and N4B.
Refer to Tables 1 and 2 (attached) for examination method, results, and date examinations were performed.
NUREG 0619-00006 page 1 of 8 l.
- c. System Changes and Changes in Operating Procedures
, ,.There ,have not been any system changes or changes to operating procedures that would affect system temprature or flow during this period,
- d. Inspection Results During RFO9 volumetric exams were performed on all six feedwater nozzle blend radii, bore regions (inner radii) as well as on two nozzle-to-safe end welds, N4A and N48.
No indications were recorded on the blend radii, bore region, or nozzle-to-safe end welds which required evaluation in accordance with ASME Section XI. l Final analysis of the ultrasonic examination data was performed and found to be acceptable in accordance with GGNS-M-489.2, Program Plan For The Performance of ASME Section XI Examinations.
- e. Leakage Monitoring
)
Grand Gulf has not installed any type of on-line leakage monitoring system capable of I detecting leakage through degraded seals on the feedwater spargers.
- f. Information Regarding UT Crack-like Indications and Any Subsequent PT indications ;
No UT crack-like indications were detected, therefore no penetrant testing was required. l i
l l
l l
0 NUREG 0619 00006 page 2 of 8
._7
~ ~
TAlilE I
' Inner Radius Page1of3 -
ID/ EXAM PROCEDURE RESULTS -DATE-AZIMUTH TYPE N4A UT GG21A3802AB No Recordable Indications 09/19n8 i PT GG21 A3809AA (RADIUS & BORE) 2 Areas Of Recordable Indications 04/07/80
@ 30*
UT UT-23-380 ATT. "N ZONE I No Recordable Indications 12/19/80 -
UT UT-23-380 ATT. "B" ZONE 2 No Recordable Indications 12/19/80 UT UT-23-380 ATT. "C" ZONE 3 No Recordable Indications 12/19/80 i UT UT-28 No Recordable Indications 10/20/86-UT UT 23 No Recordable Indications 04/14/89 UT UT-23 No Recordable Indications 05/22/92 UT 83A6042 1 Area Of Recordable Indication 05/06/95 --
.UT QAl 9.60 No Recordable Indications 3 05/05/98 N4B UT GG21A3802AB No Recordable Indications 09/19n8
@90' PT GG21 A3809AA (RADIUS & BORE) No Recordable Indications 04/07/80 UT UT-23-380 ATT. "A" ZONE I No Recordable Indications 12/19/80 UT UT-23-380 ATT. "B" ZONE 2 No Recordable Indications 12/19/80 UT UT-23-380 ATr. "C" ZONE 3 No Recordable Indications 12/19/80 ,
UT UT-28 No Recordable Indications 10/20/86 UT UT-23 No Recordable Indications 04/14/89 UT UT-23 No Recordable Indications 05/22/92 UT 83A604 2 Areas Of Recordable Indications 05/06/95 UT QAI 9.60 No Recordable Indications 3 05/06/98 8 The previous exams exhibited non-relevant reflectors generated from geometry and mode conversion (GIN 95/01768). Current techniques (QAI 9 60) uses computer optimized beam paths that produce no reflectors in the absence of flaws, NUREG 0619-00006 page 3 of b
___________-______-_______-_I
~
' TABLE 1 -
Inner Radius Page 2 of 3 .
ID/ EXAM PROCEDURE RESULTS- DATE AZIMUTH
~
TYPE N4C UT GG21 A3802AB - No Recordable Indications 09/19D8 -
@150* PC GG21 A3809AA(RADIUS & BORE) No Recordable Indications 04/07/80 UT UT-23-380 ATT. "A" ZONE I No Recordable Indications 12/19/80 UT UT-23-380 ATT. "B" ZONE 2 No Recordable Indications 12/19/80 UT UT-23-380 ATT. "C" ZONE 3 No Recordable Indications 12/19/80' UT UT-28 No Recordable Indications 10/20/86 UT UT-23 No Recordable Indications 04/14/89 UT UT-23 No Recordable Indications 05/22/92 UT 83A6042 4 Areas Of Recordable Indications 05/06/95-UT QAI 9.60 No Recordable Indications 3 05/06/98 N4D UT GG21A3802AB No Recordable Indications 09/19n8
@210' PT GG21 A3809AA (RADIUS & BORE) No Recordable Indications 04/07/80 UT UT-23-380 ATT. "A" ZONE I No Recordable Indicati9ns 12/19/80 UT UT-23-380 ATT. "B" ZONE 2 No Recordable Indications 12/19/80 UT UT-23-380 ATT. "C" ZONE 3 No Recordable Indications 12/19/80 UT UT-28 No Recordable Indications 10/20/86 UT UT-23 No Recordable Indications 04/14/89 UT UT-23 No Recordeble Indications 05/22/92 UT 83A6042 2 Areas Of Recordable Indications 05/06/95 UT QAl 9.60 No Recordable Indications 3 05-06 3 The previous exams exhibited -relevant reflectors generated hm geometry and mode conversion (GIN 95/01768). Current technigees (QAl 9.60) uses computer optimized beam paths that produce no reflectors in the absence of flaws.
NUREG 0619-00006 page 4 of 8
~ ~
TABLE 1 Inner Radius '
Page 3 of 3 - .
ID/ . EXAM lPROCEDURE RESULTS DATE ,
AZIMUTH TYPE N4E UT GG21A3802AB No Recordable Indications 09/19/78 PT GG21 A3809AA (RADIUS & BORE) No Recordable Indications 04/07/80
@270*
UT UT-23-380 ATT. "A" ZONE 1 No Recordable Indications 12/19/80 UT UT-23-380 ATT. "B" ZONE 2 No Recordable Indications 12/19/80 UT UT-23-380 ATT. "C" ZONE 3 No Recordable Indications 12/19/80 UT UT-28 No Recordable Indications 10/20/86 UT UT-23 No Recordable Indications 04/14/89 UT UT-23 No Recordable Indications 05/20/92 UT 83A6042 No Recordable Indications 05/06/95 UT QAI 9.60 No Recordable Indications 05-06-98 N4F UT GG21A3802AB No Recordable Indications 09/19/78
@330* PT GG2i A3809AA (RADIUS & BORE) No Recordable Indications 04/07/80 UT UT-23-380 ATT. "A" ZONE I No Recordable Indications 12/19/80 UT UT-23-380 ATT. "B" ZONE 2 No Recordable Indications 12/19/80 UT UT-23-380 ATT. "C" ZONE 3 No Recordable Indications 12/19/80 UT UT-28 No Recordable Indications 10/20/86 UT UT-23 No Recordable Indications 04/14/89 UT UT-23 No Recordable Indications 05/20/92 UT 83A6042 No Recordable Indications 05/06/95 UT QAI 9.60 No Recordable Indications 05-05-98 i
NUREG 0619-00006 page 5 of 8
. ~ . . . . - - . - . - - - - . - - - - - - - - - - - - - - - - - - . - = - - -
.n
' ~
TABLE 2 Nozzle-To-Safe End Page1of3 -
.ID/ EXAM PROCEDURE RESULTS DATE-AZIMUTH TYPE N4A PT PT-01-390 No Recordable Indications 01/09/81
@ 30* PT PT-04-390 No Recordable Indications 04/12/83 PT QAP 9.50 ' No Recordable Indications 09/21/86 UT UT-22-380 No Recordable Indications 02/19 & 25/81-UT UT-22-380 1 Recordable Indication 04/12/83 UT UT-51 Non-Relevant /Inside Surface Geometry ' 10/06/86 UT UT-51 Non-Relevant /Inside Surface Geometry 04/12/89 UT GE-UT-209 Non-Relevant /Inside Surface Geometry 05P.1/92 UT QAl 9.22/4 No Recordable Indications 05/08/95 UT 54-151-131-03 No Recordable Indications 05/05/98 PT QAI930 No Recordable Indications 05/05/98
, N4B PT PT-01-390 No Recordable Indications 01/09/81 I
@90* PT PT-04-390 No Recordable Indications 04/12/83 PT QAP 9.50 No Recordable Indications 09/21/86 UT UT-22-380 No Recordable Indications 02/19 & 25/81 UT UT-22-380 3 Recordable Indications 04/12/83 UT UT-51 Non-Relevant /Inside Surface Geometry 10/06/86 UT UT-51 Non-Relevant /Inside Surface Geometry 04/10/89 UT GE-UT-209 Inside Surface Geometry 05P.1/92 UT QAI 9.22/4 No Recordable Indications 05/06/95 UT 54-151-131-00 No Recordable Indications 05/05/98 PT QAI 930 No Recordable Indications 05/06/98 4
NUREG 0619-00006 page 6 of 8
TABLE 2 Nozzle-To-Safe End Page 2 003 ID/ EXAM 'PROCEDUIb ~ RESULTS DATE AZIMUTH TYPE N4C PT PT-01-390 ' No Recordable Indications 01/09/81
@150 PT PT-04-390 No Recordable Indications 04/12/83 UT UT-22-380 3 Recordable Indications 02/19 & 25/81 UT UT-22-380 12 RecordableIndications 04/12/83 UT UT-51 Non-Relevant /Inside Surface Geometry 10/06/86 PT PT-SR No Recordable Indications 03/21/89 UT UT-51 Non-Relevant /Inside Surface Geometry 04/12/89 UT GE-UT-209 Inside Surface Geometry 05/22/92 UT QAI 9.22/4 2 Recordable Indications 05/06/95 N4D PT PT-01-390 No Recordable Indications 01/09/81
@210* PT PT-04-390 No Recordable Indications 04/12/83 UT UT-22-380 No Recordable Indications 2/19 & 25/81 UT UT-22-380 3 Recordable Indications 04/12/83 UT UT-51 Non-Relevant /Inside Surface Geomety 10/09/86 PT PT-SR No Recordable Indications 03/21/89 UT UT-51 Non-Relevant /Inside Surface Geometry 04/07/89 UT GE-UT-290 Non-Relevant /Inside Surface Geometry 05/22/92 UT QAI 9.22/4 No Recordable Indications 05/08/95 t
i NUREG 0619-00006 page 7 of 8
' ~
TABLE 2 ,
Nozzle-To-Safe End Page 3 of 3 IDI EXAM PROCEDURE RESULTS DATE AZIMUTH TYPE N4E PT PT-01-390 i Recordable Indications 01/09/81
@270* PT PT-04-390 No Recordable Indications 04/12/83 UT UT-22-380 No Recordable Indications 02/19 & 25/81
- UT UT-22-380 6 Recordable Indications 04/12/83 UT UT-51 Non-Relevant /Inside Surface Geometry 10/07/86 UT UT-51 Non-Relevant /Inside Surface Geometry 04/11/89 PT QAI 9.13 No Recordable Indications 05/09/92 UT GE-UT-209 Non-Relevant /Inside Surface Geometry 05/21/92 UT QAl 9.22/4 4 Recordable Indications 05/06/95 N4F PT PT-01-390 No Recordable Indications 01/09/8I
@ 330 PT PT-04-390 No Recordable Indications 04/12/83 i UT UT-22-380 No Recordable Indications 2/19 & 25/81 UT UT-22-380 3 Recordable Indications 04/12/83 i UT UT-5i Non-Relevant /Inside Surface Geometry 10/07/86 UT UT-51 Non-Relevant /Inside Surface Geometry 04/11/89 PT QAl 9.13 No Recordable Indications 05/09/92 i UT GE-UT-209 Non-Relevant /I.D. Surface & Root Geometry 05/22/92 UT QAI 9.22/4 3 Recordable Indications 05/06/95 ,
f i
NUREG 0619-00006 page 8 of 8
- _ . _ _ _ - m _ _ _. u____. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.___ . . . _ _ __ _ . _ _ __s _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ . _ _