Deficiency Rept,Superseding 800421 Submittal,Re Installation of drilled-in Expansion Anchors,Initially Reported on 791107.Installation Procedure Was Revised to Reflect Min Spacing Requirements Between Various Anchor Types
ML19340C924
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/10/1980
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, TXX-3243, NUDOCS 8012180245
Download: ML19340C924 (2)


Text

a

) .

9 TEXAS UTILITIES GENERATING COMPANY '

2001 BRYAN *IVWER

n.s.cany December 10, 1980 a,==,g,7 =;;,- TXX-3243 '

I

$o .

51 N Mr. W. C. Seidle, Chief [. 7d Reactor Construction & Engineering NDO Y $$

Support Branch ~$ co ij U. S. Nuclear Regulatory Commission E ,

Office of Inspection & Enforcement G o 611 Ryan Plaza.Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMANCHE ~ PEAK STEAM ELECTRIC STATION INSTALLATION OF DRILLED-IN EXPANSION ANCHORS FILE N0: 10110

Dear Mr. Seidle:

~

This letter transmits our formal report in accordance with 10 CFR 50.55(e) concerning a procedural deficiency discovered in the installation of drilled-in expansion anchors. This matter was reported verbally to Mr. R. G. Taylor on November 7, 1979. This letter supersedes and voids our previous transmittal letter TXX-3125 dated April 21, 1980.

Supporting documentation is available at the CPSES site for your Inspector's review.

If we can provide any additional information, please advise.

Very truly yours, R. J. Gary RJG:dk Attachment cc: NRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 5012180 l I h - . _ _ _ ._

P e

t e .

jr TXX-3243 Attachment December 10, 1980 INSTALLATION OF DRILLED-IN EXPANSION ANCHORS Description of Deficiency Richmond screw anchors, Hilti-kwik bolts and embedded plates are used as the principal anchoring medium between concrete surfaces and piping component supports, cable raceway supports, etc. at Comanche Peak.

Installation requirements for the Hilti-kwik bolts were established in mid-1978 based on the results of a field test program and other empirical and theoretical information available. However, the initial installation requirements for spacing between the Hilti-kwik bolts and the embedded anchors did not properly account for the potential failure modes between the various anchor types, assuming full load development on the concrete anchors. A contributing factor to this problem was the lack of a formal detailed engineering specification for installation of the Hilti-kwik bolts.

Safety Implications - -

The integrity of the completed installations is presently indeterminate

_ and thus the capability of the various supports to perform their design function cannot be assured under , maximum loading conditions.

Corrective Actions Corrective actions for the stated deficiency have or will include the following:

1. The governing installation procedure (35-1195-CEI-20) was revised in October 1979 and now properly reflects minimum spacing requirements between the various anchor types.

This installation procedure has been reviewed by the Architect / Engineer. Quality control activities include verification of the minimum spacing requirements.

2. A survey of all building areas has been performed under the auspices of the Comanche Peak civil engineering group for the purpose of identifying supports not conforming to the spacing criteria. The results of this survey are currently being evaluated for any required re-work with an estimated completion date of July 1,1981.

' - ~ e- ~ "*" f