Suppls Response to NRC Bulletin 88-010,Suppl 1, Nonconforming Molded Case Circuit Breakers. Data Previously Submitted on Stored Spare safety-related Circuit Breakers Being Revised
ML19327B935
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/02/1989
From: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-88-010, IEB-88-10, PY-CEI-NRR-1073, NUDOCS 8911140234
Download: ML19327B935 (3)


Text

~

t I

. i THE CLEVELAND ELECTRIC ILLUMINATING COMPANY l P.O. DOE s7 5 PERRY. OHC 44001 0 TELEPHONE (Pte)Ip3737 5 ADDRESS 10 CENTER MOAD FROM CLrVELAND: 47$1Ps0 3 TELEX: 9416se ANsWERsACK: OrtPRYO Al Kap \kn Serving The Best location in the Nation i PERRY NUCLEAR POWER PLANT

  • " " " November 2, 1989 PY-CE1/NRR-1073 L  ;

2  ;

k; I l

U.S. Nuclear Regulatory Commission ,

Document Control Desk  ;

Washington, D. C. 20555 l Perry Nuclear power Plant Docket No. 50-440  ;

NRC Bulletin 88-10, Supplement 1 i Nonconforming Molded Case  !

Circuit Breakers  !

Centlement Bulletin 88-10 requested licensees to verify that safety-related molded-case i circuit breakers (CBs) which may have been installed as replacements,  ;

installed as part of modifications, or are being maintained as stored spares, ,

are suitable for their intended service. The subject supplement requested  :

licensees to review their Bulletin responses to verify that they met the Bulletin provisions as clarified by this supplement.  !

As a result of the supplementary Bulletin information and follow-up reviews, l the Cleveland Electric 111uminating Company (CEI) is revising data previously docketed by letters PY-CE1/NRR-0992 L, dated March 31, 1989 and PY-CE1/NRR-1014 L, dated June 15, 1989, on stored spare safety-related CBs at Parry. This revision results from reevaluation of safety-related CB  ;

procurement documents and the determination that 49 additional CBs procured ,

from Original Equipment Suppliers, and through CBM-authorized distributors, i did not have adequate traceability to the CB manufacturer (CBM). Therefore, these 49 CB's should be reclassified; the changes to our revised letter of ^

June 15, 1989 are as follows:

Data Provided  ;

6/15/89 Current Data Tots 1 safety-related spare CB's 430 430 Total with verifiable CBM traceability 405 356 ,

% safety-related spare CB's traceable to CBM 94% 83%

8911140234 891102 PDR ADOCK 0"'000440 p

Q PDC ,

I

'USWRC November 2, 1989 PY-CE1/NRR-1073 L 7

Specific information on the 49 additional CBs follows:

Stock Purchase Material Probable Coded Order Receipt # Supplier CBM Model Quantity 9140401 _S10$262 55563 Tri Electric Eaton/C-H CHB-130 20 i: 9140468 S105262 55563 Tri Electric Eaton/C-H CHB-150 20 9436445 P7530Z 30656 Brown Boveri ITE/Gould EE2-B040 4 (Level 1 OES) 9493479 P7530Z 30656 Brown Boveri ITE/Gould eel-8015 4 i (Level 1 OES) j L 9913823 Q9674-47 SP07765 Consip Delphi ITE/could P1514 1 t (Level I OES) j f

In an analogous manner to CB's earlier found to have inadequate traceability,  !

1 these 49 additionel CBs have been documented on a nonconformance report. l v removed from inventory and placed on hold.

f Other statements, conclusions and commitmenta in our previous letters remain unchanged with a minor clarification to action item 7 to better reflect PNPP's '

procurement policy. It should read as follows (changes underlined from original response in PY-CE1/NRR-0992 L dated March 31, 1989):  ;

7. Molded-case CBs installed at PNPP in safety-related applications

~

[

after 8/1/88 shall ber  !

, a. Manufactured by and procured from a CBM under a 10CFR50, Appendix B  ?

program or procured with traceability 3 the CBM from an Original [

Equtpment Supplier on PNPP's Approved Suppliers List (audited i 10CFR50, Appendix B program); or {

b. Procured commercial grade irom a CBM or others with veriftable ,

traceability to the CBM, in compliance with industry standards, and dedicated for safety-related application per PNPP's commercial grade ,

dedication program.  ;

j- l If you have any questions, please feel free to call.  ;

i Very truly yours,  ;

3 M

Al Kaplan  !

Vice President Nuclear Group AKinjc cc: T. Colburn P. Hiland USNRC Region III i

t t

l l

I Alvia Esplan who, being duly sworn, deposed and said that (1) he is l

'/ tee President. Neelear Group of the Cleveland Electrie Illuminating Company, '

(2) he to duly authorised to emeente and file this report en behalf of the Cleveland Electrie Illuminating Company and as duly authorised agent for Duquesne Light Company Ohie Edisen Company, Pennsylvasta Power Company and the ,

Toledo Edison Compiny, sad (3) the statements set forth therein are ,true and correct to the best of his knowledge, information and belief.

/ i (g]w/v..m A M #w

  • Alvik' Kaplas  ;

a ,

B/gf day of e

dTh.

, this ,

y g o s.d subscrihed before

, l 1

'N y

/ s e tt.nori unicy notoc. w e et oma Ipy CommbtL,n t een f e.,u:.r;, 00, iti)0 l (htw:fxt se tae cua.an [

l -

l I

h i

l l

l 1

~,,,.., ,,,,, , . . ,, . . ,

._. _ -.- _ . _ _ . , . _ . . . . . - . _ __ - _ _ _ m.7