Deficiency Rept Re Welded Control Board Connections,Updating 800321 Rept.Work Will Be Completed by 800701
ML19318A458
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/02/1980
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
References
TXX-3131, NUDOCS 8006230156
Download: ML19318A458 (1)


Text

,

PDR LPDR TIC  :

NSIC  !

TEXAS UTILITIES GENERATING CO.TIPANY CENTRAL FILES 2001 BRYAN TOWEH DALLAS. TEXAS 75201 a.;.cany May 2, 1980

"=7'JTl:'".' l:' TXX-3131 Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 100 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAfi ELECTRIC STATION 1981-83 2300 MW INSTALLATION CONTROL BOARD WELDED CONNECTIONS FILE NO: 10110

Dear Mr. Seidle:

This letter supplements our report (TXX-3110) dated March 21, 1980, concerning welded connections of the control boards.

We stated in the report that rework would be completed by May 1,1980.

It is anticipated, however, that this work will be completed July 1, 1980.

1 Very truly yours, l l

R. J. Gary l RJG:df cc: NRC Region IV (0 + 1 copy) 1 l

Director, Inspection & Enforcement (15 copies) c/o Distribution Services Branch, DDC, ADM.  ;

U. S. Nuclear Regulatory Commission i Washington, D. C. 20555 '