ML19309B846

From kanterella
Jump to navigation Jump to search
Forwards Revised Safeguards Security Contingency Plan.Plan Withheld (Ref 10CFR2.790)
ML19309B846
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/28/1980
From: Clayton F
ALABAMA POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
TAC-10471, NUDOCS 8004070267
Download: ML19309B846 (1)


Text

Alabama Power Company 600 North 18th Street Post Office Box 2641 l Birmingham, Alabama 35291 i Telephone 205 32S$341 1 L4IL hbj'#eith'fini Alabama Power the southem electnc system March 28, 1980 Docket Nos. 50-348 50-364 Mr. A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D.C. 20555 RE: Safeguards Security Contingency Plan

Dear Sir:

This submittal is in response to your letter dated February 12, 1980 which we received on February 23, 1980. Enclosed with this letter are five (5) copies of revised plan pages for your continuing review. Each copy is a complete revised text which incorporates changes made on October 8,1979 as a result of your August 31, 1979 letter and changes made on March 20, 1980 as a result of your February 12 letter.

Yours very truly, n g /g'4 wO f cs W'Cors- Vm F. L. Clayton, dr. '

N FLCJr/JGS:bhj Enclosures cc: Mr. R. A. Thomas Mr. G. F. Trowbridge 8 0 04 0706t 6 ']