Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216E6661999-09-10010 September 1999 Forwards Analysis of Capsule W Virginia Power North Anna Unit 1 Nuclear Power Plant Reactor Vessel Matl Surveillance Program, for Capsule Withdrawn on 980922 ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216E6661999-09-10010 September 1999 Forwards Analysis of Capsule W Virginia Power North Anna Unit 1 Nuclear Power Plant Reactor Vessel Matl Surveillance Program, for Capsule Withdrawn on 980922 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML18153C3661990-09-20020 September 1990 Forwards Topical Rept VEP-NE-3-A, Qualification of WRB-1 CHF Correlation in VEPCO Cobra Code. ML20065D5671990-09-20020 September 1990 Forwards Rev 15 to Security Personnel Training & Qualification Plan.Rev Withheld ML18153C3701990-09-18018 September 1990 Forwards Addl Info Re Facility Containment Isolation Valve Type C Test,Per 900914 10CFR50,App J Exemption Request ML18152A2341990-09-14014 September 1990 Requests Exemption from 10CFR50,App J Section III.D.3 Re Local Leak Rate Testing During Every Reactor Shutdown. Basis & Justification for Exemption Encl ML20059J3341990-09-13013 September 1990 Forwards Rev 15 to Nuclear Security Personnel Training & Qualification Plan.Rev Withheld ML20059H7391990-09-10010 September 1990 Forwards Rev 15 to ISFSI Nuclear Security Personnel Training & Qualification Plan.Rev Withheld ML20064A5201990-09-0707 September 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/90-15 & 50-339/90-15.Corrective Actions:Procedures Revised to Include Tolerance Bands for Temp Control Switch Setpoints & Involved Personnel Counseled ML20059H2931990-09-0707 September 1990 Advises of Review & Approval of ASME Section XI Inservice Insp Program Interval 1 Repair & Replacement Program Change to Applicable Code Edition & Addenda ML18151A2901990-08-31031 August 1990 Forwards Rev 10 to Updated FSAR for Surry Power Station Units 1 & 2,representing Second Updated FSAR Submitted This Yr ML20059E5481990-08-31031 August 1990 Forwards Supplemental Info Re Deletion of Pressurizer Safety Valve Requirement During Mode 5.Current Tech Spec Requiring One Operable Safety Valve in Mode 5 Unnecessary & May Be Deleted ML18153C3451990-08-29029 August 1990 Forwards Proprietary Semiannual Fitness for Duty Program Performance Data Rept for 900103-0630.Rept Includes Summaries of Mgt Sanctions Imposed,Actions Taken to Correct Program Weaknesses & Events Reported to Nrc.Encl Withheld ML18153C3381990-08-22022 August 1990 Responds to NRC 900723 Ltr Re Violations Noted in Insp Rept 50-280/90-21 & 50-281/90-21.Corrective actions:as-found-as- Left Conditions of Auxiliary Feedwater Evaluated & Found Operable ML18153C3391990-08-22022 August 1990 Requests Approval for Use of Plugs Fabricated of nickel- chromium-iron Uns N-06690 Matl (Alloy 690) to Plug Tubes in Steam Generators for Mechanical & Welded Applications ML20063Q1241990-08-15015 August 1990 Provides Supplemental Info for 900115 Tech Spec Change Request Re Max Allowable Control Rod Drop Time.Retained DNBR Margin Tracked & Documented by Calculational Note ML20058N5941990-08-0808 August 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/90-11 & 50-339/90-11.Corrective Actions:Procedure Revised to Limit Applicablity to Small Refueling Cavity Leaks & Listed Evaluations & Revs Will Be Made to EOP ML18153C3171990-08-0101 August 1990 Resubmits Synopsis of Changes to Updated Operational QA Program Topical Rept Vep 1-5A ML18153C3161990-08-0101 August 1990 Provides Supplemental Response to NRC 900629 Ltr Re Electrical Crossties,Load Shedding on Nonblackout Unit & Emergency Diesel Generator Reliability.Emergency Diesel Generator Reliability Program in Place,Per Reg Guide 1.155 ML18153C3091990-07-30030 July 1990 Provides Outline of Plan to Meet 10CFR50 App G Requirements, for Low Upper Shelf Energy Matls,Per NRC 900521 Request ML18153C3061990-07-30030 July 1990 Forwards Revised Tech Spec Pages,Addressing Constitution of Quorum & Timeliness of Mgt Safety Review Committe Meeting Minutes,Per NRC Request ML18153C3101990-07-26026 July 1990 Forwards Decommissioning Financial Assurance Certification Rept..., Nuclear Decommissioning Trust Agreement & Nonqualified Nuclear Decommissioning Trust Amended & Restated Trust Agreement, Per 10CFR50.75 ML18153C3051990-07-26026 July 1990 Advises That Util Submitted Decommissioning Funding Plan & Financial Assurance Info W/Isfsi License Application ML18153C3041990-07-26026 July 1990 Responds to NRC 900626 Ltr Re Violations Noted in Insp Rept 50-281/90-20.Corrective Actions:Leaking Drain Plug & Upper Drain Plug on Motor Replaced W/Oil Drain Assemblies Composed of Piping & Valves ML18153C3031990-07-26026 July 1990 Advises of Withdrawal of Request for NRC Review & Approval of Engineering Evaluation 8.Revised Evaluation Will Be Maintained Onsite for NRC Audit During Future Insps,Per Generic Ltr 86-10 ML20055H5651990-07-20020 July 1990 Requests for Temporary Waiver of Compliance from Requirement of Tech Spec 3.3.1.1,Table 2.3-2 Re Response Time Testing. Request Does Not Pose Significant Hazards Consideration ML18153C2901990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Listed Transmitters Compiled.Transmitters Found Installed within Reactor Protection or ESFAS Have Been Replaced ML20055F9361990-07-16016 July 1990 Advises That No 30-day Rept Will Be Made Re Degradation of Seismic Support Bolts of post-accident Hydrogen Recombiners 1-HC-HC-1 & 2-HC-HC-1 ML20044B3501990-07-13013 July 1990 Forwards Monthly Operating Repts for June 1990 & Corrected May 1990 Rept Pages for North Anna Power Station ML18153C2861990-07-12012 July 1990 Requests Cancellation of Operator Licenses for Listed Individuals.Licenses No Longer Required ML18153C2871990-07-11011 July 1990 Responds to Violations Noted in Insp Repts 50-280/90-18 & 50-281/90-18.Corrective Actions:Permanent Drain Line Installed & Matrix Which Describes Proper Ventilation Alignment for Plant Conditions Provided for Personnel Use ML20055E8121990-07-0909 July 1990 Requests Cancellation of Licenses Listed ML18153C2851990-07-0606 July 1990 Forwards Response to Generic Ltr 90-04 Re Status of Generic Safety Issues ML20055D4841990-07-0303 July 1990 Requests That Operator Licenses for Listed Individuals Be Cancelled.Licenses No Longer Required ML20055D4831990-07-0303 July 1990 Requests That Operator License for Bl Shriver Be Cancelled. License No Longer Required ML18153C2831990-07-0303 July 1990 Advises That MW Hotchkiss No Longer Needs Operator License SOP-20548-1.Cancellation of License Requested ML18153C2821990-07-0303 July 1990 Requests Exemption from 10CFR50,App J,Paragraph III.A.6(b), Which Requires That When Two Consecutive Periodic Type a Tests Fail to Meet Applicable Acceptance Criteria Type a Test Shall Be Performed at Plant ML20055D7701990-06-29029 June 1990 Submits Supplemental Response to Violations Noted in Insp Repts 50-338/90-04 & 50-339/90-04 Re Failure to Take Timely Corrective Action for Repair of B Low Head Safety Injection Pump (1-SI-P-1B).No Addl Purchasing Procedure Required ML18153C3591990-06-28028 June 1990 Responds to SALP Repts 50-280/90-16 & 50-281/90-16 for Period 890701-900331.Corrective Actions Focus on Issues of Maint Backlog,Maint planning,post-maint Testing,Staffing & Procurement ML20043H9421990-06-21021 June 1990 Forwards Proprietary WCAP-12351, North Anna Unit 1 Evaluation for Tube Vibration Induced Fatigue, Per Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Rept Withheld (Ref 10CFR2.790) ML18153C2611990-06-21021 June 1990 Responds to NRC 900522 Ltr Re Violations Noted in Insp Repts 50-280/90-07 & 50-281/90-07.Corrective actions:as-built Configurations of 120-volt Ac & Dc Vital & Semivital Panel Breaker Installations Verified to Be Acceptable ML18153C2581990-06-18018 June 1990 Forwards Reissued Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989. Rept Contains Info Re SR-89,Sr-90 & Fe-55 Analytical Results for Liquid Composite Samples ML18153C2591990-06-18018 June 1990 Forwards Response to NRC 900524 Request for Addl Info Re NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Engineering Will Initiate Study to Evaluate Enhancements of Cooldown & Possible Heatup Operation ML20055C8661990-06-15015 June 1990 Forwards Application for Reissuance of NPDES Permit ML20043G5711990-06-15015 June 1990 Forwards Response to Request for Addl Info Re Insp Rept 50-339/89-20 Concerning Plant Safety Sys Outage Mod Insp. Response Withheld (Ref 10CFR73.21) ML20043H1131990-06-15015 June 1990 Concludes That Removal of Temporary Loose Parts Monitoring Sys Does Not Increase Probability of Acccident,Create Possibility of New Kind of Accident & Does Not Reduce Margin of Safety ML18153C2541990-06-15015 June 1990 Forwards Corrected Tech Specs Page 3.1-3,per Identification of Typo in 900522 Application for Amends to Licenses DPR-32 & DPR-37 ML20043G8731990-06-14014 June 1990 Discusses Evaluation of ASME Section XI Testing for Outside Recirculation Spray Pumps ML18153C2521990-06-14014 June 1990 Responds to NRC 900515 Ltr Re Violations Noted in Insp Repts 50-280/90-09 & 50-281/90-09.Corrective Actions:Abnormal Procedures & Fire Contingency Action Procedures Being Upgraded Via Technical Procedure Upgrade Program ML20043H2091990-06-13013 June 1990 Forwards List of Corrective Actions & Current Status in Response to NRC Bulletin 88-004, Potential Safety-Related Pump Loss ML20043F4531990-06-0808 June 1990 Forwards, Core Surveillance Rept for North Anna 2,Cycle 7 W/Extended License Burnup Limit. Rept Contains Specific Power Distribution Limits Applicable for Cycle 7 Operation W/Burnup Limit Extension ML18153C2501990-06-0808 June 1990 Confirms That Primary Policy Re Onsite Property Damage Insurance,Provided by Nuclear Mutual Limited 1990-09-07
[Table view] |
Text
V:nlOINIA ELECTRIC AND PowER CoM:i>ANY R:rCHMOND,VJ:RGl'N:rA 23261 March 26, 1981 Mr. Harold R. Denton, Director Serial No. 195 Office of Nuclear Reactor Regulation NO/RMT:smv U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Washington, D.C. 20555 50-281 50-338 50-339 License Nos. DPR-32 DPR-37 NPF-4 NPF-7
Dear Mr. Denton:
SUPPLEMENTARY INFORMATION FOR SURRY POWER STATION UNITS NO. 1 AND 2 AND NORTH ANNA POWER STATION UNITS NO. 1 AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGE In our letters dated May 15, 1980 (Serial No. 400) and March 6, 1981 (Serial No. 109), we proposed changes to the Technical Specifications for Surry Units No. 1 and No. 2 and North Anna Units No. 1 and No. 2 to permit an increase in the enrichment limit for new fuel.
In response to a verbal request from a member of your staff, Vepco agreed to provide answers to several questions on the effects of extended fuel burnups on accident source terms and iodine spiking. These answers are provided in Attachment 1.
If you require any additional infonnation, please contact this office.
Very truly yours,
!ftZ!y~
B. R. Sylvia Manager - Nuclear Operations and Maintenance Attachment cc: Mr. James P. O'Reilly Office of Inspection and Region II Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3 Division of Licensing Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing r
e PAGE Question 1: What is the effect of burnups above 33,000 GWD/MTU on accident source terms?
Response: Table I shows core activities for North Anna 17x17 fuel at 33 and 38 GWD/MTU. These activities were determined from ORIGIN calculations using the ENDF B IV Library. The fuel was assumed to be.enriched to 4.1% and the plant was assumed to be operated at 2900 MWt for the calculation. Table II lists the gap fractions calaulated with the ANS 5/4 model at
- burnups of 20 and 38 GWD/MTU. The Table II calculations are consistent with core activities shown in Table I and the parameters assumed in the calculation of these fractions are also shown in Table II.
In Table I it can be seen that the burnup increase causes either a decrease in activity or an insignificant increase for most isotopes. In the case of the noble gas isotopes,
, either the small inventory present or the small contribution to the total dose result in a minor impact on accident consequences. However, more limiting core activities were assumed in the North Anna FSAR for the noble gases, as shown in Table I. The fission product core iodine inventories given in Tabl~ I are higher than those in the North Anna FSAR due to:
a) the use of a 4.1% enrichment b) the use of the ENDF B/IV fission product data library.
The values in the North Anna FSAR were taken from the
PAGE 2 TID-14844 document. However, the overall radiological consequences of postulated accidents should not change to any significant degree if another model update is also used. The North~ Anna FSAR used iodine dose conversion factorsCDCFs) from TID-14844 while current practice is to use those values in the NRC Regulatory Guide 1
- The decrease in DCF values for iodines will offset the minor increase in the iodine inventories and thus leave the FSAR results virtually unchanged.
Table II shows a large drop in the gap fractions with burnup.
The parameters which drive diffusion of fission gases from the fuel to the gap are fuel temperature and burnup. Fuel temperature reductions with increasing burnup more than offset the effect of increasing burnup on diffusion rates.
Tables I and II show that accident source terms(core and gap) either decrease or have an insignificant increase with higher burnups. In either case, the radiological consequences of the FSAR accidents remain unchanged. While the specific calculations were performed for a North Anna 17x17 core, the minor changes with burnup are representative of both plants and therefore Surry specific calculations are not needed.
Specifically, Surry fuel would exhibit the same phenomena exhibited by the Horth Anna extended burnup calculations, i.e. minor increases in the iodines that can be offset py lower DCF's and lower gap fractions due to reduced fuel
e PAGE 3 temperatures.
e PAGE 4 Table I Noble Gas and Iodine Cor*e Inventories at Shutdown (Values are in Curies)
Basis Assumed in 33000 MWD/MTU 38000 MWD/MTU North Anna Radionuclide FSAR Noble Gases Kr-85 5.33 K 10 5 6.02 K 10 5 8. 14 K 10 5 Kr-85m 2.42 K 10 7 2.33 K 10 7 3.22 K 10 7 Kr-87 4.54 K 10 7 4.34 K 10 7 6. 19 K 10 7 Kr-88 6.44 K 10 7 6. 17 K 10 7 8.82 K 10 7 Xe-133 1. 57 K 10 8 1. 58 K 10 8 1. 66 K 10 8 Xe-133m 2.35 K 10 7 2.35 K 10 7 4.22 K 10 6 Xe-135 3.85 K 10 7 3.74 K 10 7 4.54 X 10 7 Xe-135m 3 . 11 K 10 7 3. 17 K 10 7 4.45 X 10 7 Iodines I-131 7.74 K 107 7.84 K 10 7 7. 17 K 10 7 I-132 1 . 138 10 8 1 . 148 10 8 K K 1. 09 X 10 8 I-133 1. 654 K 10 8 1.652 K 10 8 1. 61 K 10 8 I-135 1 . 5 38 K 10 8 1.534 K 10 8 1. 46 K 10 8
e PAGE 5 TABLE II Fuel Rod Gap Fractions For Lead Burnup Fuel Assembly Discharged at Refueling Nuclide ANS 5/4 ANS 5/4 Model Model 20,000 MWD/MTU 38,000 MWD/MTU I-131 0.086 0.0012 I-133 0. 0 2 9 0.00038 I-135 0
- 0 16 0.00022 Xe-133 0.027 0.00036 Xe-135 0.0073 0.000096 Xe-138 0.0013 0.000017 Kr-85m 0.0051 0.000066 Kr-85 0. 12 0.080 Kr-87 0.0027 0.000036 Kr-88 0.0041 0.000053 Parameters used to calculate fuel rod gap fractions of lead assembly Core Average Power 5.44 kw/ft Radial Peaking Factor 20,000 MWD/MTU 1. 25 38,000 MWD/MTU 1 . 07
PAGE 6 TABLE II (CONT)
Fuel Temperature1 20,000 MWD/MTU 38,000 MWD/MTU Gap Fraction Model2 ANS S/4 1 Taken as fuel centerline temperature at lead rod power.
2 ANS 5/4 model used except the entire fuel assembly was modelled to be at one uniform temperature. The temperature chosen to conservatively apply this model was the fuel centerline temperature of the lead rod in the assembly with the burnup noted.
PAGE 7 Question 2: What are the bases for any decontamination £actors used in consequence evaluations?
Response: The decontamination factors CDFs) used in the North Anna and Surry FSAR analyses are discussed in Sections 15.4.5.2.3 and 14.4.1.2 of their respective FSAR's. The correlation used to calculate the North Anna DF was developed from small and large scale tests. The DF is an exponential £unction of the the bubble rise time (or pool depth) and the effective bubble diameter (calculated from the total volume of gas released from the fuel assembly gaps). With consideration given to the total volume of gas released from a fuel assembly, i.e.,
6.9 SCF for the North Anna 15x15 array (the volume of release would be much smaller for a 17x17 array due to its lower fuel temperatures), the pool decontamination factor was indicated in the FSAR to be a minimum of 760 for the 26 foot pool.
However, for conservatism a DF of 100 was used in the evaluation of the fuel handling accident. An even more conservative value of 10 was used in the Surry FSAR analysis.
As previously discussed, the gap fractions shown in Table II are much decreased due to the effect of decreasing temperature with burnup. Consequently, previous margins in the DF and the reductions in the gap fractions offset any uncertainty associated with higher back pressures, bubble size, etc., at higher burnups, and the fuel handling accident analyses presented in the FSARs remain conservative.
e PAGE 8 Question 3: What are the radiological consequences of accidents?
Response: Since the changes in the source terms and gap fractions discussed in the reponses to questions and 2 are insignificant, the radiological consequences of the licensing analyses remain bounding.
.~
. e e PA~E 9 Question 4: How does the iodine spiking behavior for fuel burnups greater than 33,000 MWD/MTU compare to that for present models?
Response: The prevailing theory on the thermal and hydraulic mechanisms producing the iodine spiking phenomena is the result of independent investigations in both the United States and abroad. The theory describes the probable source of *the spike inventory as cesium iodide salts which are deposited on the inner surfaces of the fuel rod cladding and to a lesser degree on the outer surface of the fuel pellets.
A fuel rod with a cladding defect will admit reactor coolant liquid to contact the inner surfaces of the fuel rod only when the local power is below approximately 2 kw/ft. When reactor coolant enters the fuel rod, it will dissolve the cesium iodide salts deposited there. The dissolved cesium and iodine are then free to be transported to the reactor coolant system where the iodine is seen as an iodine spike.
A similar hydraulic mechanism occurs during reactor coolant depressurization wherein the trapped gases within* the fuel rod above and/or below the defect location will be at a higher pressure than the coolant as the reactor coolant system is depressurized. This creates a driving head to expel the iodine ladden water from the fuel rod thus producing another iodine spike. These spikes have become known as power spikes and pressure spikes.
.,. e PAGE 10 Since the source of iodine has been shown to be the fuel rod cladding gap activity, any spike activity resulting from fuel rods with high burnup(i.e. greater than 33,000 MWD/MTU) would be less than that from defected rods at lower burnup due to the decreasing gap inventory as shown in the answer to question 1. Additionally, the spiking data upon which the present quantatative NRC model has been developed does not include local burnup of the defected fuel rods. It is not possible to ascertain the burnup or temperature history of the defected fuel rods producing the spikes on which data is available. Therefore, it is believed that it is inappropriate to attempt to model the iodine spiking phenomena for variations in burnup.
The only effect of higher burnups on iodine spiking would result from the lower linear power of high burnup fuel rods.
If a defected fuel rod were at a high burnup level, the linear power of the fuel rod would be closer to 2 kw/ft compared to lower burnup fuel rods. Thus a smaller decrease in reactor power would be necessary in order to produce an ---
iodine spike of the power spike variety. This implies two observations:
- 1. Upon reactor shutdown, the spike contribution from high burnup fuel rods would be produced earlier in the shutdown transient than that contribution from defected rods at lower burnups
e e PAGE 11
- 2. Iodine spikes would be produced with smaller power variations (e.g. smaller load follow swings) if defected rods were at high burnup as compared to defected rods at lower burnups.
However, since the use of the iodine spiking phenomena in Safety Analysis Reports and Safety Evaluation Reports is in the area of radiological consequences of accident~. this effect would not affect the results of the analyses. In accident scenarios, a reactor trip occurs thereby resulting in all fuel rods dropping below 2 kw/ft at roughly the same time. In this case, high burnup rods would not produce an early spike component.
In conclusion, it is believed that the NRC spiking model remains conservative in dealing with iodine spiking when considering fuel rod defects in high burnup fuel rods.