Errata Page 3 for NOV Issued on 980730.Page 3 Corrected to Indicate That Violation B Was Severity Level IV Violation
ML18016A513
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/18/1998
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18016A512 List:
References
50-400-98-06, 50-400-98-6, NUDOCS 9808240212
Download: ML18016A513 (3)


Text

NOV the procedure to fully implement this requirement, but i stead allowed the procedure portion for that.Technical Specif cation section to be performed at power prior to refueling o ages 1

through 6.

The NRC has concluded that information regarding the reason f violation A and the corrective actions taken and planned to correct the iolation and prevent recurrence are already adequately addressed on the acket in Inspection Report Nos. 50-400/98-01 and 50-400/98-06.

Th NRC has concluded that information regarding'he reason for violation B an the corrective actions taken and planned to correct the violation and revent recurrence are

~

already adequately addressed on the docket in Inspect n Report Nos.

50-400/98-04, Licensee Event Report 50-400/98-005-00 'nd Inspection Report 50-400/98-06.

However, you are required to submit written statement or explanation pursuant to 10 CFR 2.201 if the descr tion therein does not accurately reflect your corrective actions or yo r position.

In that case, or if you choose to respond, clearly mark your re onse as a "Reply to a Notice of Violation," and send it to the U.S.

Nuclea Regulatory Coranission.

ATTN:

Document Control Desk.

Washington, D.

20555., with a copy to the Regional Administrator, Region II, and a c y to the NRC Resident Inspector at the facility that is the subject of this tice, within 30 days of the date of the letter transmitting this Notice of V olation.

Because your response will be placed 'he NRC Public Document Room (PDR), to the extent possible, it should not i elude any personal privacy, proprietary, or safeguards information so that 'an be placed in the PDR without redaction.

However, if you find 'ecessary to include such information, you should clearly indicate the spec fic information that you desire not to be placed in the

PDR, and provide he legal basi.s to support your request for withholding the information f m the public.

Dated at Atlanta, Georgia this 30th day of July 199 98082402f2 9808f8 PDR ADOCK 05000400 6

PDR

0

vov the procedure to fully implement this requirement, but instead allowed the procedure portion for that Technical Specification section to be performed at power prior to refueling outages 1

through 6.

This is a Severity Level'V violation '(Supplement 1)

The NRC has concluded that information regarding the reason for violation A and the corrective actions taken and planned to correct the violation and

'revent recurrence are already adequately addressed on the docket in Inspection Report Nos. 50-400/98-01 and 50-400/98-06.

The NRC has concluded that information regarding the reason for violation B and the corrective actions taken and planned to correct the violation and prevent recurrence are already adequately addressed on the docket in Inspection Report Nos.

50-400/98-04, Licensee Event Report 50-400/98-005-00, and Inspection Report 50-.400/98-06.

However, you are required to submit a written statement or explanation pursuant to 10 CFR 2.201 if the description therein does not accurately reflect your corrective actions or your position.

In that case, or if you choose to respond, clearly mark your response as a "Reply to a Notice of Violation," and send it to the U.S. Nuclear Regulatory Corrrnission, ATTN:

Document Control

Desk, Washington, D.C.

20555, with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation.

Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible. it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction.

However, if you find it necessary to include such information, you should clearly indicate the specific information that you desire not to be placed in the

PDR, and provide the legal basis to support your request for withholding the information from the public.

Dated at Atlanta, Georgia this 30th day of July 1998