ML18010A360
| ML18010A360 | |
| Person / Time | |
|---|---|
| Site: | 07000036 |
| Issue date: | 10/23/2013 |
| From: | Hoffman J, Natreon Jordan Westinghouse |
| To: | Office of Nuclear Material Safety and Safeguards |
| Shared Package | |
| ML18010A247 | List:
|
| References | |
| HEM-17-72 | |
| Download: ML18010A360 (2) | |
Text
Hematite Decommissioning Project Procedure HDP-PR-HP-311, Radiological Surveys Revision 1 FORM HDP-PR-HP-311-3 RADIOLOGICAL SURVEY REPORT - WALKOVER SURVEYS SURVEY LOCATION:
LSA-10-09 DATE:
10/21/2013 TIME:
14:00 RWP:
RP-13-G009 LOG NUMBER:
3965 C 131021 PURPOSE OF SURVEY: GWS ofLSA-10-09 for FSS Serial Number Cal Due Date:
Background
Efficiency(%}
Instrument Tvoes(s)
(meter/detector)
(meter-detector)
(CPM a/fly)
( a/fly)
Lud 2221 44-10 AA 299523 I PR 321893 7/3/2014 3766 NIA Lud 2221 44-10 cc 299526 I PR 321901 7/3/2014 3589 NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA REMARKS:
All readings taken on contact.
All readings given in gcpm.
See map for locations surveyed.
General area background of 12,000 gcpm.
No elevated areas were found.
Area surveyed was minimum 9500 gcpm and maximum 15,800 gcpm.
a (lfli'/ J -1/-r-/1)
- 0/)2/c<
TECHNICIAN(S):
JeffHoffman J' 1_.
t i}/r(\\_,Y,,.,
PrintName/SiBn/ *~ate
/ ! /
Nick Jordan
/
1"
~ 10/)Ji'! /
~-
Print Name/Sign/Date c:Q I
I io ;pf{t REVIEWER:
A,~Ut 81"-!S;/> ~--
3 Print Name/Sign/Date Quali Record
E C')
~
X E
- 0) l[)
E 00 X
E
- 0)
(0 E
C')
N X
E
'SI" c:i '
~
E IX)
~
X E
- 0) c!i