ML18010A316
| ML18010A316 | |
| Person / Time | |
|---|---|
| Site: | 07000036 |
| Issue date: | 04/10/2015 |
| From: | Westinghouse |
| To: | Office of Nuclear Material Safety and Safeguards |
| Shared Package | |
| ML18010A247 | List:
|
| References | |
| HEM-17-72 | |
| Download: ML18010A316 (73) | |
Text
Revision:2 PagePl ofl HDP-PR-FSS-701, Final Status Suney Plan Development APPENDD( P{
r,SS FIELD LOG Suney Area:
LSA-10 Suney Unifi 05
==
Description:==
==
Description:==
Section 05 FSS Field Loe:
Dete/Time Observation or Comment Technician DltaB 0630 t2lt8lt3 07w t2lt8lt3 0730 t2n8n3 0800 wta$ tr3o t2lt8lt3 t245 t2lt8lt3 t300 t2n8ll3 1330 t2n8lt3 t500 t2/181131630 Received our daily safety briefing and FSS b,riefing.
Received LSA 1045 FSS Instnrcfion Briefing. Official start of FSS in LSA l0-05.
daily instrument source checks forthe FSS meters. All FSS meters lly passed the source check. Assembled GWS backpacks.
. Jordan & A. Schooley verified that the isolation and controls were in place and GWS for FSS in LSA 10-05.
. Jordan and A. Schooley completed morning FSS GWS.
midday source check of GWS instnrments. All meters being used lly passed souroe check.
. Jordan & A. Schooley performed download and processingof morning GPS and documented surveys.
surveys 4726-C-l3l2l8 & 4739-C-l3l2l8 for more detailed survey
. Hoffinan verified thatthe isolation and controls were in place and continued WS FSS in LSA 10-05.
. Hoffinan completd afternoon GWS and returned to the office to download and the GPS data and document the survey.
survey 4731-C-131218 for more detailed survey information.
performed on all FSS meters that were used. All mete'rs passed llv.
ASAIJ/JH ASAIJ/JH Quality Record Westinghouse Non-Proprietary Class 3 FSS Field Log _ of _
Revision:2 Page Pl of I HDP-PR-FSS-701, Final Stetus Suney Plan Development APPEIYDD( P{
f,.SS I'IELD LOG Suruey Area:
LSA-10
==
Description:==
Burial Pit Onen Lend Aree Survey Unit 05
==
Description:==
Section 05 FSS Field Log:
Dete/Time Obsenetion or Comment Technician l2ll9ll3 0630 lReceived our daily safety briefing and FSS briefing.
JH l2ll9ll3 0730 performed daily instrument souroe checks for FSS l-2221meter AA. Meter passed the source check. Assembled GWS backpack.
l2ll9ll3 0800 [. ftoffinan verified thatthe isolation and controls were in place and began GWS FSS in LSA 1045.
IADIB ll30 p. Hoffinan completed a portion of FSS GWS in LSA 10-05. Returned to office to load and prooess data and perform survey documentation.
survey 4753-C-l3l2l9 for more detailed survey information.
l2ll9ll3 l3(N: perfonned midday source check of GWS instnrment. MeterAA successfully souroe check-l2ll9ll3 16/10 post+hecks perforrred on FSS meter AA. Meter passed JH Quality Record Westinghouse Non-Proprietary Class 3 FSS Field l,og _ of
Revision:2 PagePl ofl HDP-PR-FS$701, Final Status Suney Plen Development APPENDTX P{
FSS FIELD LOG SuneyArea: LSA-10 Dcscription:@
Survey Unit:
05
==
Description:==
Section 05 FSS Field Loe:
Date/Time Obsenation or Comment Technician t2l20lt3 0630 NO rSS WORK TO BE PERFORMED rN LSA l0-05 ON THIS DATE I SJ SJ aua[ty Record Westinghouse Non-Proprietary Class 3 FSS Field Log _ of _
Revision:2 Page Pl of I IIDP-PR-FS$701, final Status Survey Plan Development APPENDIX P{
FSS X'IELD LOG Suney Area:
LSA-10 Suwey Uni*
05
==
Description:==
Burial Pit Onen Land Area
==
Description:==
fu@@
FSS Field Loe:
Date/Time Obsenation or Comment Technician t2l2vt3 0630 NO FSS WORK WAS PERFORMED IN LSA IO-05 BETWEEN I2l2IlI3 AND 116114 DUE TO SITE CLOSTJRE FOR T}IE HOLIDAYS SJ Quality Record Westinghouse Non-Proprietary Class 3 FSS Field Log _ of _
Revision:2 Page Pl of I HDP-PR-X'S$701, Final Status Suney Plan Development APPENDIX P{
FSS flELD LOG Suney Area:
LSA-10 Suruey Unifi 05
==
Description:==
==
Description:==
fu1@s FSS Field Loe:
Date/Time Obsenation or Comment Technician 0t/o6l14 0630 DI.-IE TO WEATHER CONDITIONS, NO FSS WORK WAS PERFORMED IN LSA 10-05 BETWEEN 0u06n4 AND 0l/13/14.
SJ Quality Record Westinghouse Non-Proprietary Class 3 FSS Field Log _ of _
Revision:2 Page Pl of I IIDP-PR-FS$701, Final Status Survey Plan Development APPENDD( P{
r.SS f,'IELD LOG SuneyArea: LSA-10
==
Description:==
Suney Unit:
05
==
Description:==
Sgg@Q5 FSS Field Los:
Date/Time Obsenation or Comment Technician 0Ut4/14 06.30 0vt4/r4 07w 0vt4lt4 0730 Received our daily safety briefing and MC&A training.
I AS/NJ/JWJS/SJ Received our daily FSS briefing and FSS Instructions for LSA 1045 daily instrument sounce checks for the FSS meters. All FSS meters passed the source check. Assembled GWS backpacks and began soil sampling equipment and supplies.
0yt4/14 w00 Jordan and J. Williams verified that the isolation and controls were place and continued FSS GWS in LSA 10 A. Schooley, J. Seals and S.
began Systernatic Soil Sampling efforts in LSA 10-05.
0t/141141300 0vt4lt4 t330 Jordan and J. Williams performed mid{ay source check of GWS Meters successfully passed souroe check.
Jordan and J. Williams continued FSS GWS in LSA l0-05. A. Schooley, J.
and S. Jenkins continued Systematic Soil Sampling efforts in LSA 10-05.
ID's Ll0050lBES00, LI00502BES00 and LI00502BEQO0 were to be sampled due to their location currently being under water. The area currently being pumped and the locations will be revisited as soon as ing is complete.
0yt4lt4 t5t5 Schooley, J. Seals and S. Jenkins completed Systematic Soil Sampling of ilable locations. The following ID's were sampled:
1005038ES00, Ll 005048Es00, Ll00505BES00 I 005068ES00, Ll 005078ES00, Ll 0050E8ES00 survey 0079-C-140114 for more detailed inforrration.
0yt4lt4 t6t0
. Jordan and J. Williams completed the GtilS of LSA 1045 forthe day and to the office to download and process the data. See surveys: 0096{-
l40l14, 0138{-1401 14 & 0139-C-140114 for more detailed information.
0vt4lt4 t620 performed on all FSS meters that were used. All meters passed llv.
ASAIJ/JWJS/SJ Quality Record Westinghouse Non-Proprietary Class 3 FSS Field Log _ of _
Revision:2 Page Pl of I HDP-PR-FS$701, X'inal Status Suney Plan Development APPENDD( P{
FSS X'IELD LOG Suney Area:
LSA-10 Suney Unit:
05
==
Description:==
Burial Pit Open Land Area
==
Description:==
fu@Q5 FSS X'ield Loe:
Dote./Time Obseryation or Comment Technician 0ut5lt40630 0ytslt4 0730 0vt5lt4 wts 0l/r5lr4 ll00 0Ut5lt4 t245 0vtslt4 t330 0yt5lt41600 0vt5/t4 t6t0 0Utslt41620 Received our daily safety briefing and FSS briefing.
daily instnrment souroe checks for the FSS meters. All FSS meters lly passed the source check. Assembled GWS backpacks.
. Jordan, J. Williams, J. Seals, A. Schooley and S. Jenkins verified thatthe ion and controls were in place and continued GWS FSS in LSA 10-05.
morning FSS GWS.
midday souroe check of GWS instruments. All meters being used lly passod souroe check.
. Jordan, J. Williams, J. Seals, A. Schooley and S. Jenkins verified that the ion and controls were in place and continued GWS FSS in LSA 10-05.
FSS GWS on horizontal surfaces within LSA 10-05. See surveys:
103-c-1401 15, 0l 1l{-1401 15,01224,-1401 15, 01234,-14015, 01364-40115, 0155-C-140115 & 0156-C-140115 for more detailed information.
performed on all FSS meters that were used. All meters passed llv.
data download and processing. Performed survey documentation.
AS/NJ/JWJS/SJ ASAIJ/JWJS/SJ Quality Record Westinghouse Non-Proprietary Class 3 FSS Field Log_ of_
Revision:2 PagePl ofl HDP-PR-FS$701, X'inal Status Suney Plen Development APPENDIX P{
X'SS MELD LOG Survey Area:
LSA.lO
==
Description:==
Burial Pit Ooen Land Area Survey Unit:
05
==
Description:==
fu@Q!
FSS X'ield Loe:
Date/Time Observation or Comment Technician 0vt6lt4 M30 0yt6lt4 0715 0Ut6/14 0830 0ut6lt4 to0o 0yt6lt4 t3t5 0ut6lt4 t400 0ut6n4 t6t0 0vl6lt4 t620 0vt6lt4 t630 Received our daily safety briefing and FSS briefing.
daily instrument sourpe checks for the FSS meters. All FSS meters ly passed the source check. Assernbled GWS backpacks.
A. Schooley and J. Seals verified that the isolation and controls were in place and began systematic soil sampling. S. Jenkins and J. Williams continued GWS in LSA 10-05.
Completed systernatic soil sampling of all horizontal surfaces. See survey 01214,-
140116 for more dCIailed information.
midday souroe check of GWS insffuments. All meters being used lly passed souree check.
Jenkins and J. Williams verified that the isolation and controls were in place and inued GWS FSS in LSA 1045. A. Schooley and J. Seals began sidewall ic soil sampling efforts.
sidewall systematic soil sampling and FSS GWS forthe day in LSA 10-05. See surveys:01254,-140116, 01344-1401 16 & 0135-C-140116 for more iled information.
s performed on all FSS meters that were used. All meters passed ly.
data download and processing. Performd GWS and soil sampling documentation.
AS/JWJS/SJ AS/JWJS/SJ Quality Record Westinghouse Non-Proprietary Class 3 FSS Field l.og _of _
Revision:2 PagePl ofl HDP-PR-X'S$701, X'inal Status Survey Plan Development APPENDIX P{
FSS FIELD LOG Suney Area:
LSA-10 Suruey Unit:
05
==
Description:==
==
Description:==
Section 05 FSS Field Los:
Date/Time Obseryation or Comment Technician Received our daily safety briefing and FSS briefing.
daily instrument source checks forthe FSS meters. All FSS meters lly passed the source check. Assembled GWS backpacks.
N. Jordan proceeded to LSA 10-10 to conduct GWS of areas that were due to investigate pellet and tire debris that had been previously located during FSS. See surveys: 0l4l-C-l40ll7 & 01421-140117 for more information.
A. Schooley and J. Seals and S. Jenkins verified that the isolation and controls were in place and began systematic soil sampling in LSA 10-05. J. Williams continued GWS in LSA 1G05.
mid{ay souroe check of GWS instruments. All meters being used passed source check.
. Jenkins, A. Schooley and J. Seals verified that tre isolation and contnols were place and continued sidewall systematic soil sampling efforts in LSA l0{5.
. Williams continued GWS of LSA lG'05.
sidewall systernatic soil sampling and FSS GWS of all horizontal within LSA 1G05. All soil samples labeled and transported to the lab analysis. See surveys : 0l 494,-1401 17, 0l 57 -C-l 401 17 & 0 I 5 8-C-I 401 17 more detailed information.
performed on all FSS meters that were used. All metrs passed ly.
to the office to perform data download, processing and documentation all GWS and soil sampling activities.
ASNJ/JW/JS/SJ ASAIJ/JWJS/SJ 0Ut7n4 0630 0ut7lt4 0715 0ut7n4 0830 0t/171t41010 0y171141300 aut7lt4 t3t5 0ut7lt4 t530 0ut7lt4 t550 0Ut7/141600 Quality Record Westinghouse Non-Proprietary Class 3 FSS Field Log _ of _
Revision:2 PagePl ofl HDP-PR-X'SS-701, Final Status Survey Plan Development APPENDIX P{
FSS rIELD LOG Suney Area:
LSA-10 Suney Unit:
05
==
Description:==
==
Description:==
Section 05 FSS Field Loe:
Date/Time Observation or Comment Technician 01/lE/I4 0E00 ultat4 1400 0t/t8lt4 t4t0 N. Jordan, A. Schooley, J. Williams & J. Seals verified that the isolation and controls were in place and began sidewall GWS in LSA l0{5.
lompleted sidewall FSS GWS for the day within LSA 10-05 performed on all FSS meters that were used. Meter DD failed post check. Area will be re-surveyd. All other meters passed successfully.
to the office to perform data download, processing and documentation of GWS and soil sampling activities. See surveys:0l7GC-140118, 01794-140119 for more detaild information.
AS/NJ/Jw/JS AS/NJ/JWJS Quality Record Westinghouse Non-Proprietary Class 3 FSS Field Log _ of _
Revision:2 Page Pl of I HDP-PR-FSS701, Final Status Survey Plan Development APPEI\\IDD( P{
FSS I'IELD LOG Suwey Anea:
LSA-10
==
Description:==
Burial Pit Ooen Land Arca Suruey Unit:
05
==
Description:==
$gg1tionQ5, FSS Field Loe:
Date/Time Obseryation or Comment Technician 0Ut9/140630 outglt4 t200 0vt9lt4 t400 0vt9lt4 t430
. Williams, S. Jenkins & J. Seals verified that the isolation and controls were in place and continued sidewall FSS GWS in LSA 10-05.
sidewall FSS GWS within LSA 10-05. Began Biased Soil Sampling within LSA 10-05. See Surveys 0173-C-140119,0179-C-140119, 0180-t40tt9 & 0r82{-l40l19 Biased Soil Sampling activities. Processed samples and transported to lab for analysis.
following samples were taken:
ID l00525BL,B00 l00526B[JB00 l00527BUB00 l00528BrrB00 suryey 016rc-140119 for more detailed information.
performed on all FSS meters that were used. All meters passed llv.
AS/NJ/Jw/JS SJA.IJIJWJS Quality Record Westinghouse Non-Proprietary Class 3 FSS Field Log _ of _
Revision:2 PagePl ofl HDP-PR-FS$701, Final Status Suney Plan Development APPENDIX P{
[.SS FTELD LOG Suney Area:
LSA-I0 Survey Unit:
05
==
Description:==
Burial Pit Open Land Area
==
Description:==
Section 05 f,'SS Field Loe:
Date/Time Obsenation or Comment Technician 0v20lt4 0830 0U20114 t030 0y20114 t630
. Jordan verified that the isolation and controls were in place and performed a resurvey of the sidewall in LSA 10-05. This sidewall was originally surveyed with meter that failed the post source check on 0l/18/14.
resurvey of sidewall. Returned to office to document survey.
performed on FSS meter Orat was usd. Meter passed successfully.
NJ Quality Record Westinghouse Non-Proprietary Class 3 FSS Field Log _ of _
Revision:2 LSA-10 PagePl ofl HDP-PR-FSS-701, X'inal Status Suruey Plan Development APPENDX P{
FSS FIELD LOG Suney Area:
Survey Unit:
==
Description:==
==
Description:==
Section 06 Burial Pit Open Land Area 06 FSS Field Loe:
Date/Time: Obselvation or Comment:
L0l28ll3 0630 Received our daily FSS and safety briefing-l0l28ll3 0720 Performed daily instrument source checks for the 2221 metersCC and DD and 2360 meters B and D. All FSS meters successfully passed the source check.
10/28/13 0830 N. Jordan, J. Hoffinan verified that the isolation and controls were in place and continued Pre-FSS/ RASS GWS in LSA 10-06.
l0l28ll3 1330 N. Jordan, J. Hoffinan completed the Pre-FSS/ RASS GWS in LSA 10-06 for the day and proceeded inside to download, process data and complete the survey documentation. The GWS created the following GPS map files:
LSA 1006 102813 DDandLSA 1006 102813 CC.
See survey 4055 C 131028 formore detailed information.
l0l28ll3 1630 Post-checks performed on all FSS meters that were used. All meters passed successfully.
END SJAIJ/JI{/AS Technician SJA.IJ/AS/JH FSS Field Log _ of _
Revision:2 LSA-IO Page Pl of I HDP-PR-X'SS-701, Final Status Survey PIan Development APPENDIX P{
FSS FIELD LOG Survey Area:
Survey Unit:
==
Description:==
==
Description:==
Section 06 Burial Pit Open Land Area 06 FSS Field Loe:
Date/Time: Observation or Comment:
lll04ll3 0630 Received our daily FSS and safety briefing.
lll04ll3 0710 Performed daily instrument source checks for the 2221 meters AA, DD and FF And 2360 meters B and D. All FSS meters successfully passed the source check.
I l/04/13 0830 N. Jordan, J. Hoffinan and A. Schooley verified that the isolation and controls Were in place and continued Pre-FSS/ RASS GWS in LSA l0-06.
I l/04/13 1500 N. Jordan, J. Hoffinan and A. Schooley completed the Pre-FSS/ RASS GWS in LSA 10-06 for the day and proceeded inside to download, process data and complete the survey documentation.
The GWS created the following GPS map files: LSA_1006_I 10413_AA, LSA_I 006_l I 04 I 3_DD, LSA_I 006_l I 04 I 3_DD_2 and LSA_ I 006_l I 04 1 3_FF.
See the following surveys for more detailed information.
4143 C 13l 104 4189C 13ll04 4224 C 131 104 NOTE: During the GWS, A. Schooley experienced a GPS data-logger failure.
Note the manual survey map section, recorded on survey 4143 C 131104. 100%
Of this area was walked during the GWS and no anomalous readings were found.
lll04/13 1620 Post-checks performed on all FSS meters that were used. All meters passed successfully.
END SJ/NJ/JIVAS Technician SJA.IJ/ASiJH Non Class 3 FSS Field Log _ of _
Revision:2 LSA-IO Page Pl of2 HDP-PR-FS$701, X'inal Status Suney Plan Development APPENDX P{
FSS FIELD LOG Suney Area:
Survey Unit:
06 &07
==
Description:==
==
Description:==
Section 06 &07 Burial Pit Open Land Area FSS Field Loe:
Date/Time: Obseruation or Comment:
lll07ll3 0630 Received our daily FSS and safety briefing.
Technician SJAiJ/AS/JH ru07/13 0710 1rl07l13 0800 tu07n3 0820 tv07lr3 t300 1U07n3 t320 Performed daily instrument source checks for the 2221 meters AA, DD and FF and 2360 meters B and D. All FSS meters successfully passed the source check.
N. Jordan and J. Hoffinan assembled backpacks and proceeded to LSA lG06 to begin GWS.
A Schooley and S. Jenkins prepared supplies & paperwork and proceeded to LSA 10-07 to begin Pre-FSS/RASS sampling on LSA 10-07. Verified that the isolation and controls were in place before beginning work in the area.
N. Jordan and J. Hoffinan continued the GWS walkovens in LSA 10-06. The following map files were created from the GWS data. LSA_1006_I10713_AA, LSA_1006_I 10713_AA_2, LSA_1006_I I 0713_DD &
LSA_1007_I10713_DD_2. See surveys 4366C131 107 & 4225C131107 for more information.
After restocking with supplies, A. Schooley and S. Jenkins continued Pre-FSS and RASS sampling in LSA 10-07. The following samples were pulled.
Sample ID 7l2l-RA-t3t 107-05-03 712l-RA-l3l107-05-M 7l2t-RA-131 107-05-05 7121-RA-131107-05-06 7l2l-RA-l3l 107-05-07 712I-RA-131107-0s-08 7121-RA-l3l 107-05-09 7121-RA-131107-05-10 712l-RA-131107-0s-l l 7121-RA-131107-05-12 7121-RA-r3r 107-05-13 7l2l-RA-l3l107-05-14 7l2l-RA-131107-05-15 7121-RA-131107-05-16 See survey 4226 C 13 t 107 for more detailed information.
FSS Field Log _ of _
Revision:2 PageV2 of2 Technician SJNJ/AS/JH Date/Time:
tU07lt3 t600 lu07tr3 t620 HDP-PR-FS$701, Final Status Survey Plan I)evelopment APPENDD( P{
FSS FIELD LOG Obseruation or Comment:
N. Jordan and J. Hoftran completed the GWS for the day and proceeded into the office to download and process the data. A. Schooley and S. Jenkins completed sampling activities for the day and delivered samples to the lab for analysis.
Performed post-checks on all FSS 2221 meters. All meters passed successfully.
END SJNJ/AVJH FSS Field Log _ of
Revision:2 LSA.IO PagePl ofl HDP-PR-FSS-701, Final Status Suney Plan Development APPENDIX P{
FSS FIELD LOG Survey Area:
Survey Unit:
M &07
==
Description:==
==
Description:==
Section 06 &07 Burial Pit Open Land Area FSS Field Los:
Date/Time: Observation or Comment:
Technician I l/08/13 0630 Received our daily FSS and safety briefing.
SJAIJ/AS/JH I l/08/13 0710 Performed daily instrument source checks for the 2221 metersAA, DD and FF nd2360 meters B and D. All FSS meters successfully passod the source check.
I l/08/13 0E00 N. Jordan performed statistical analysis on walkover data from lll07ll3.
I l/08/13 0900 J. Hofuan, A Schooley and S. Jenkins performed walkdown of Iso-Pacific sorter area and assisted with setup and configuration input.
1ll08/13 1300 J. Hoftnan and S. Jenkins installed Isolation and Contnols anrund LSA 10-06 including rope, signage and plastic wrap@ waddles to control water run-off into the area from other areas. A. Schooley and N. Jordan verified that the isolation and contols were in place and continued Pre-FSS/ RASS sampling in LSA 1G.07.
I l/08/13 1600 Completed sampling activities for the day in LSA 10-07. The following samples were pulled.
Sample ID 7121-RA-131107-05-01 7121-RA-131107-05-02 lll08/13 1630 See survey 4227 C 13l107 for more detailed information.
Completed installing I&C in LSA 1G.06 and completed general housekeeping in the area to prepare it for FSS starting next week. Post-checks performed on all FSS meters that were used. All meters passed successfully.
END SJAIJ/AS/JH FSS Field Log _ ot
Revision:2 HDP-PR-['SS-701, Final Status Suney PIan Development APPENDIX P.6 FSS FIELD LOG LSA-10 & LSA 12 Burial Pit Open Land Area 10-06 & t2-05 Section LSA 10-06 & LSA 12-05 FSS Field Loe:
Date/Time: Observation or Comment:
llll2ll3 0630 Received our daily FSS and safety briefing.
llll2/13 0710 Performed daily instrument source checks for the 2221 meters DD and FF and 2360 meters B and D. All FSS meters successfully passed the source check.
llll2ll3 0730 A. Schooley performed a manual GWS in LSA 12-05 between stockpiles l & 4, to veriff the surface is clean before placing screened re-use material in the area.
llll2ll3 0745 J. Hoffrnan provided job coverage for the movement of stockpile 2 material from the old area on the south end of the site to the new area in the north laydown.
I l/12l13 0850 N. Jordan verified that the isolation and controls were in place and continued Pre-FSS / RASS walkovers in LSA 10-06.
tt/12113 0930 N. Jordan completed the Pre-FSS / RASS GWS of LSA 10-06. Returned to the office to download and perform statistical analysis of data. The GWS created the GPS map file: LSA 1006 lll2l3 DD. See survey 4305 C l3lll2 for more detailed information.
llll2ll3 ll30 A. Schooley completed the manual GWS in LSA 12-05. No anomalous readings were found. See survey 4284 C l3lll2 for more detailed information.
llll2ll3 1330 A. Schooley proceeded to LSA l2-05 to perform biased soil sampling at 3 locations.
Soil samples were taken at the following locations:
PagePl ofl Suney Area:
Survey Unit:
==
Description:==
==
Description:==
See survey 4283 C l3lll2 for more detailed information.
llll2ll3 1630 J. Hoffinan completed job coverage of stockpile soil transport activities. Post checks performed on all FSS meters that were used. All meters passed successfully.
END SJ/NJ/JIVAS Sample ID 7186-55-13 I I l2-15-01 7l 86-55-13 ttt2-15-02 7186-55-13 I I 12-15-03 Easting Northing 827870.64 865465.55 827829.74 865474.88 827828.40 865504.61 Technician SJA{J/AS/JH Class 3 FSS Field Log _ of_
Revision:2 LSA.lO HDP-PR-X'SS-701, Final Status Survey Plan Development APPENDIX P{
FSS FIELD LOG PagePl ofl Burial Pit Open Land Area Section 06 Technician SJNJ/AS/JH FSS Field Log _ of _
Survey Arrca:
Suney Unit:
06
==
Description:==
==
Description:==
FSS Field Los:
Date/Time: Obsenation or Comment:
llll3ll3 M30 Received our daily FSS and safety briefing.
llll3ll3 0720 Performed daily instrument source checks forthe 2221metersAA, DD and FF and2360 meters B and D. All FSS meters successfully passed the source check.
11/13/13 0830 N. Jordan, J. Hoffinan, A. Schooley covered setup of the ISO-PACFIC soil screening machine.
I l/13/13 1300 J. Hoftran covered the ISO-PACIFIC pellet tests for NRC.
I l/13/13 1400 N. Jordan, and A. Schooley verified that the isolation and control measune were in place and continued FSS walkovers in LSA 10..06. The GPS data files LSA-1006-I I l3l3-DD & LSA-1006_I I 13l3_FF were created. No anomalous Readings were noted during the walkovers.
See surveys 4321 C 13 l l 13 & 43E1 C 13 l l 13 for more detailed information.
I l/13/13 1600 Returned to the offEce to download GWS data and complete survey documentation.
llll3/13 1630 Post-checks performed on all FSS meters that were usd. All meters passed successfully.
END SJ/NJ/JIVAS Class 3
Revision:2 LSA-IO PagePl of1 HDP-PR-FSS-701, Final Status Suney Plan Development APPENDD( P-6 FSS F'IELD LOG Suney Area:
Suney Unit:
==
Description:==
==
Description:==
Section 06 Burial Pit Open Land Area 06 FSS Field Loe:
Datc/Time: observation or Comment:
Technician llll4/13 M30 Received our daily FSS and safety briefing.
SJNJiASiJH llll4ll3 0720 Performed daily instrument source checks for the 2221 meters AA, DD and FF and2360 meters B and D. All FSS meters successfully passed the source check.
I l/14l13 0830 N. Jordan, J. Hoffinan, verified that the isolation and conkol measure wene in place and continued FSS walkovers in LSA 10-06. During the GWS, GPS data files LSA_1006_I I 14l3_AA, LSA_1006_lll4l3_AA 2, LSA_1006_I I1413_DD
& LSA_1006_I I l4l3_DD_2 were created. No anomalous readings were noted during the walkovers.
See surveys 4367 C 13 I I 14 & 4334 C 13 I I 14 for more detailed information.
l/l4ll3 1610 Returned to the office to download GWS data and complete survey documentation.
llll4/13 1630 Post-checks performed on all FSS meters that were used. All meters passed successfully.
END SJ/NJ/JII/AS FSS Field Log _ of _
Class 3
Revision:2 LSA-IO Page Pl of2 HDP-PR-FSS-701, Final Stetus Suruey Plen Development APPENDIX P{
FSS FTELD LOG Suney Area:
Suruey Unit:
06&10
==
Description:==
==
Description:==
Section 06 & l0 Burial Pit Open Land Area FSS Field Loq:
Date/Timq Obseilation or Comment:
I l/15/13 0630 Received our daily FSS and safety briefing.
I l/15/13 0710 Performed daily instrument source checks for the 2221 metersAA, DD and FF and 2360 meters B and D. All FSS meters successfully passed the source check.
llll1ll3 0730 A. Schooley and S. Jenkins entered LSA 10-10 to pull Pre-FSS/RASS Biased and systematic samples.
I l/15/13 0815 N. Jordan, J. Hoffinan, verified that the isolation and control measur were in place and continued FSS walkovers in LSA 10-06. During the GWS, GPS data files LSA_1006_I I l5l3_AA & LSA_1006_11l5l3_DD were created.
No anomalous readings were noted during the walkovers.
See surveys 4369 C 13l I 15 & 4382 C 131115 for more detailed information.
I l/15/13 1300 N. Jordan and J. Hoftnan entered LSA 10-06 to survey the base and sidewalls of the small VOC pit in the northern section of the LSA. During the GWS, the GPS data file LSA-1006_111513_DD_HOLE was created. No anomalous readings were noted duringthe walkover.
n/I5/13 1530 See survey 4368 C 13l I 15 for more detailed information.
Completed soil sampling for the day in LSA 10-10. The following samples were Completed and secured.
Sample ID Biased 72t4-RA-131114-09-01 7214-RA-l3l I 14-09-03 Systematic 7213-RA-l3l I 14-09-04 7213-RA-l3l I l4-09-0s See strrvey 4341 C 131l 15 for more detailed information.
Technician SJNJ/AS/JH Class 3 FSS Field Log _ of _
Revision:2 LSA-IO PageY2 of2 HDP-PR-X'SS-701, Final Status Suney Plan Development APPENDD( P{
F'SS T'IELD LOG Suney Area:
Suney Unit:
06& l0
==
Description:==
==
Description:==
Section 06 & l0 Burial Pit Open Land Area X'SS Field Loq:
Date/Time: Obseryation or Comment:
llll5ll3 1610 Returned to the offrce to download GWS data and complete survey documentation.
11/15/13 1630 Post-checks performed on all FSS meters that were used. All meters passed successfully.
END SJ/NJ/JIVAS Technician SJNJ/JI{/AS FSS Field Log _ of _
Class 3
Revision:2 LSA-IO Page Pl of2 HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 FSS T'IELD LOG Suney Area:
Suney Unit:
06& r0
==
Description:==
==
Description:==
Section 06 & 10 Burial Pit Open Land Area FSS Field Loe:
Date/Time: Obselvetion or Comment:
I l/18/13 0630 Received our daily FSS and safety briefing.
I l/18/13 0700 Performed daily instrument source checks forthe 2221 meters AA, DD and FF and 2360 meters B and D. All FSS meters successfully passed the source check.
llll8ll3 0715 A. Schooley and S. Jenkins and N. Jordan entered LSA 10-10 to continue the soil sampling efforts for Pre-FSS/RASS Biased and systematic samples.
I lilSl13 0815 J. Hoffinan, verified that the isolation and control measures were in place and continued on the last portion of FSS walkover in LSA 10-06.
l1lr8/13 1100 J. Hoffinan completed the GWS of LSA 10-06 and returned to the office to perform the data download and survey documentation. During the GWS,GPS data files LSA-1006_I I l8l3_AA was created. No anomalous readings were noted during the walkover.
See surveys 4370 C 131 I l8 for more detailed information.
1ll18/13 I115 A. Schooley, S. Jenkins and N. Jordan completed soil sampling within LSA 10-10.
Transferred all samples to the lab for analysis. The following samples were pulled During today.
Technician SJ/NJ/ASiJH Sample ID Biased 7214-RA-13 ttr4-09-02 Systematic 7213-RA-l3l I 14-09-01 7213-RA-l3 tr14-09-02 7213-RA-l3l I 14-09-03 7213-RA-131I 14-09-06 See survey 4363 C 13l I l8 for more detailed information.
Received the FSS instruction briefing from M. Bresnahan for LSA 10-07.
il/l8il3 1300 FSS Field Log _ of _
Revision:2 LSA-IO PageP2 of2 HDP-PR-['SS-701, X'inal Status Survey Plan Development APPENI}IX P{
FSS FIELD LOG
==
Description:==
Burial Pit Open Land Area Suney Arca:
Survey Unit:
06& l0
==
Description:==
Section 06 & 10 FSS X'ield Los:
Date/Time: Obsenation or Comment:
I l/18/13 1400 Performed survey documentation and statistical analysis of GWS data.
1ll18/13 1630 Post-checks performed on all FSS meters that were used. All meters passed successfully.
END SJA{J/JWAS Technician SJNJ/J}VAS FSS Field Log _ of _
Revision:2 LSA-IO Page Pl of I HDP-PR-FSS-701, Final Status Survey PIan Development APPENDD( P{
FSS FTELD LOG Survey Area:
Survey Unit:
06&07
==
Description:==
==
Description:==
Burial Pit Open Land Area Section 06 & 07 FSS Field Los:
Date/Time: Observation or Commenf:
Technician lll25/13 M30 Received our daity FSS and safety briefing.
SJNJ/AS/JH ll/25113 0700 Perforrned daily insfument source checks for the 2221 meters AA, DD and FF and 2360 meters B and D. All FSS meters successfully passed the source check.
11/25113 0800 A. Schooley, J. Hoffinan and N. Jordan verified that the isolation and control measures were in place and continued FSS walkovers in LSA 10-07.
11125113 1100 A. Schooley, J. Hoffrnan and N. Jordan completed sections of the GWS of LSA 10-07 and returned to the office to perform mid-day instrument source checks, Download the data and document the surveys. During the GWS, the following CPS data files were created: LSA_1007_I12513_AA, LSA_1007_I12513_DD and LSA_ 1007 -112513_FF. No anomalous readings were noted during the walkovers.
See surveys 4453 C l3ll25 and 4454 C l3ll25 for more detailed information.
lI/251I3 l3OO Received the FSS instruction briefing from S. Jenkins for Biased Sampling in LSA 10-06.
lltzsl]t:. l4A0 J. Hoffinan and N. Jordan verified that the isolation and control measures were in place and continued FSS walkovers in LSA 10-07. The walkovers consisted of GPS walkovers ofthe flat surfaces and manual walkovers ofthe sidewalls.
The GPS walkovers created the following file: LSA_1007_I12513_AA 2.
See survey 4470 C l3ll25 for more detailed information.
tll25l13 1430 A. Schooley proceeded to LSA 10-06 and verifiedthatthe isolation and control measures were in place. Sample location flags were placed and sampling equipment was staged and restocked for tomorrow's sampling activities.
lll25l13 1600 A. Schooley, J. Hoffrnan and N. Jordan returned to the office to download data And perform survey documentation.
lll25ll3 1640 Post-checks performed on all FSS meters that were used. All meters passed successfully.
END SJAIJ/J}VAS FSS Field Log _ of _
Revision:2 HDP-PR-FSS-701, Final Status Sumey Plan Development APPENDIX P-6 F'SS FIELD LOG LSA-10 Burial Pit Open Land Area 06 &.07 Section LSA 10-06 & 10-07 f,'SS Field Loe:
Date/Time: Obsenation or Comment:
11126113 0630 Received daily safety and FSS briefing.
ll/26/13 0715 Performed daily instrument source checks for FSS meters. All meters successfully passed the source check.
ll/26/13 0820 A. Gayler and M. Dekeyser began manual GWS in the former stockpile 5 & 6 areas.
ll/26113 0930 A. Schooley and S. Jenkins verified that the isolation and controls were in place for LSA 10-06 and 10-07 and began systematic soil sampling in LSA 10-06.
J. Hoffinan and N. Jordan began FSS GWS in LSA 10-07.
ll/26/13 ll00 A. Gayler and M. Dekeyser completed the manual GWS of former stockpile 5 & 6 area. See survey 4476 C 131126 for more detailed information.
11126/13 1300 J. Hoffinan and N. Jordan continued GWS in LSA 10-07. A. Schooley and S. Jenkins continued systematic soil sampling in LSA l0-06.
11126113 1430 A. Schooley and S. Jenkins completed systematic sampling in LSA l0-06. The Following samples were completed.
Sample ID L1006018ES00 Ll00602BES00 Ll00603BES00 Ll00604BES00 Lr00605BRS00 Ll00605BRQ00 Ll00606BES00 Ll00607BES00 Ll00608BES00 L100609BES00 See survey 4490 C 131126 for more detailed information.
ll/26113 l5l0 A. Schooley and S. Jenkins entered LSA 10-07 to begin systematic soil sampling Page Pl of2 Survey Area:
Survey Unit:
==
Description:==
==
Description:==
Technician SJ/NJ/JIVAS AGA,ID AG/I,ID Non Class 3 FSS Field Log _ of _
Revision:2 LSA-IO PageP2 of2 HDP-PR-FSS-701, Final Status Suruey Plan Development APPENDIX P.6 FSS FIELD LOG Survey Area:
Suney Unit:
06 &07
==
Description:==
==
Description:==
Burial Pit Open Land Area Section LSA 10-06 &.10-07 tv26n316/}0 FSS Field Loe:
Date/Time: Observation or Comment:
Technician ll/26113 1600 J. Hoffinan and N. Jordan completed GWS in LSA 10-07 for the day. Returned SJNJ/JIVAS to the office to download data and document surveys. See survey 4540 C 131126 for more detailed information.
ll/26113 1615 A. Schooley and S. Jenkins completed systematic sampling for the day in LSA l0-07.The following four samples were pulled:
Sample ID Ll00702BES00 Ll00705BES00 L100709BRS00 L1007l0BES00 See survey 4491 C 131126 for more detailed information.
Performed post checks on FSS meter. All meter passed successfully.
END SJ/NJ/JIVAS uali Record Class 3 FSS Field Log _ of
Revision: 2 Survey Area: LSA-I0 Survey Unit: 06 FSS Field Loe:
Date/Time:
tzl3l20t3 0630 Page Pl of HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 FSS FIELD LOG Burial Pits Open Land Area
==
Description:==
==
Description:==
Section 6 Observation or Comment:
Radiological Engineering is requesting bias sampling and survey in LSA-10-06 basecl on the statistical analysis of the data collected during the FSS GWS. The bias samplirig and survey consist of the followine:
Technician
{,S l) Collect a bias sample from the sidewall in the small pit within LSA-10-06. See fisure Probe DD - Hole LSA-I0-06 Burial Pit Area LDA-IU-UO. Dee rlgure rroDe DD - -rlole LJA-lU-UO Durlal rlt Ar(
for the location of tfie pit. Scan the sidewalls for the location of the hishest readins and collect a 6 inch sample from that location.
- 2) Perform a G 06 FF 111313.
six-inch sample
'Slthe area coverins Resion #l from Fisure LSA L6ok and listen fof ano"malous readingi. Collect a from the location with the highest reading.
- 3) Perform a GWS of the area covering Region #2 from Figure LSA-10-06 DD 111413. Look and listen for anomalous readings.
Collect a 6lnch sample from the location with the hiehest reading.
-$/e' of\\^t5
-fts Westin Non-Fss FetJ b5 J,Q + -
-o C5 N
o
-1i)
-E.
LEGEND:
CPM (Max 9292 gcpm)
<Mean 7402 - 805',7 8058 - 8713 8714 - 9369
>9369 Survey Extent Excavation SU Boundary FSS Survey Unit NCS Controls Boundary Surface Water N
,r@,
s 0
20 40 Feet Area Surveyed oo I
=
BP South 4 LSA-10-06 Probe DD - Hole LSA-10-06 Burial Pit Area FFS Gamma Walkover Survey Hematite Decommissioning Project Jefferson County Hematite, MO
LSA-10-06 FF 111313 865050.000 855040.mO 865030.000 855020.000 855010.000 B 8650q).O00 CEtoz 854990.000 854980.000 864970.000 854960.000 864950.000
< Average
- " < l sigma a < 2 si8ma
. < 3 sigma a > 3 sigma 854940.m0 827700.@O 827710.000 827720.000 827730.000 827740.ON 827750.W Eastlng 827760.000 927770.@0 827780.000 A,n6ro"Pl' ?ufwn^ GWS ottr". ydantp
- & tpoba,^rl
!n"+r^f-a,rtov.ta-0.*-r' reafuv*e7.
?5 L"(4
tsA-10-05 DD 111413 rTwt
. _rr_
+$
- a
{
li?
lo*'
- .+
- l}*
+aa.i 865030.000 tc 5 aesozo.mo o-865010.q'O 865000.(m 86'tlXrO.firO
- 1in 864980.000 L 42n9.ffi 827790.000 827800.0@ 827810.000 E tdrE
< Aungc t<1sltm a < 2 siim.
a<3slim a>3sl3m p-t4ao** )'. ?cr{wvna QwS t+fl*
turtt-at& botz o-uc!
htir" fi-a,,"ar^oLois,cad-,.yr.
?5+ be 4
Revision:2 LSA-IO PagePl ofl HDP-PR-FSS-701, Final Status Suney Plan Development APPENDIX P{
FSS FIELD LOG Sumey Area:
Survey Unit:
06 &07
==
Description:==
==
Description:==
10-07 Sample ID Ll007l5BUB00 Ll00701BuIol Ll00701BUI02 L100701BuI03 Ll0070lBUr04 Ll007l6BUB00 Burial Pit Open Land Area Section LSA 10-06 & 10-07 FSS Field Loe:
Date/Time: obsenation or Comment:
Technician 12103/13 0630 Received daily safety and FSS briefing.
SJ/JIVASNJ 12103/13 0715 Performed daily instrument sourc,e checks for FSS meters. All meters successfully passed the source check.
l2l03ll3 0810 N. Jordan and J. Hoftnan verified that isolation and controls were in place in LSA l0-10 and began performing GWS ofthe area.
12/03113 1300 S. Jenkins and A. Schooley entered LSA 10-06 and 10-07 to perform biased soil sampling activities.
12/03/13 1600 N. Jordan and J. Hoffinan completed FSS GWS for the day in LSA 10-10. Returned to the offrce to download data and document the surveys. See the following surveys for more detailed information:
4549 C 131203,4550 C 131203,455 I C 131203 12/03113 1615 S. Jenkins and A. Schooley completed biased soil sampling in LSA 10-06 and LSA l0-07. The following samples were pulled:
10-06 Sample ID Ll006l0BUB00 Ll006l lBuB00 Ll006l2BUB00 See surveys 4570C 131203 and457l C 131203 l2l03ll3 1630 Performed post checks on FSS meter. All meters passed successfully.
END SJ/JTUAS/NJ Class 3 FSS Field Log _ of _
Revision:2 Survey Area: LSA-10 Survey Unit: 06 &07 f,'SS Field Loe:
Date/Time:
tu07/13 0630 tv07n3 0710 I 1/07i l3 0800 tu07n3 0820 t/07n31300 lt/07/131320 Page Pl of2 HDP-PR-FSS-701, Final Status Suney Plen Development APPENDIX P{
[.SS FIELD LOG
==
Description:==
==
Description:==
Burial Pit Open Land Area Section 06 &07 Obsemation or Comment:
Received our daily FSS and safety briefing.
Performed daily instnrment source checks for the 2221 metersAA, DD and FF and 2360 meters B and D. All FSS meters successfully passed the source check.
N. Jordan and J. Hoffinan assembled backpacks and proceeded to LSA 10-06 to begin GWS.
A Schooley and S. Jenkins prepared supplies & paperwork and proceeded to LSA l0-07 to begin Pre-FSS/RASS sampling on LSA l0-07. Verified that the isolation and controls were in place before beginning work in the area.
N. Jordan and J. Hoffinan continued the GWS walliovers in LSA 10-06. The following map files were created from the GWS data. LSA_1006_I10713_AA, LSA_1006_I 10713*AA_2, LSA_1006_1 10713_DD &
LSA-1007*I10713_DD_2. see surveys 4366c131107 & 4225c131107 for more information.
After restocking with supplies, A. schooley and s. Jenkins continued Pre-FSS and RASS sampling in LSA 10-07. The following samples were pulled.
Sample ID 7121-RA-131 107-05-03 7r2l-RA-131107-05-04 7121-RA-131107-05-05 7l2l-RA-l3l 107-05-06 7121-RA-l3l 107-05-07 7t2l-RA-l3l 107-05-08 7121-RA-131107-05-09 7l2l-RA-l3t 107-05-10 7121-RA-131107-0s-l I 7121-RA-l3l107-05-12 7121-RA-l3l 107-05-13 7121-RA-l3l107-05-14 712r-RA-131107-0s-15 7t2l-RA.l31107-05-16 See survey 4226 C 13l 107 for more detailed information.
Technician SJNJ/AS/JH Class 3 FSS Field Log _ of _
Revision:2 LSA.IO Page Pl of 1 HDP-PR-FSS-701, Final Status Survey PIan Development APPENDIX P.6 FSS FIELD LOG Survey Area:
Survey Unit:
06 &07
==
Description:==
==
Description:==
Section 06 &07 purial Pit Open Land Area FSS Field Loe:
Date/Time: Obsenation or Comment:
Technician I l/08i 13 0630 Received our daily FSS and sfety briefing.
SJ/NJ/AS/JH I l/08/13 0710 Performed daily instrument source checks for the 2221 metersAA, DD and FF and2360 meters B and D. All FSS meters successfully passed the source check.
I l/08/13 0E00 N. Jordan performed statistical analysis on walkover data from lll}T/13.
I l/08/13 0900 J. Hoftran, A Schooley and S. Jenkins perforrned walk-down of Iso-Pacific sorter area and assisted with setup and configuration input.
ll/08/13 1300 J. Hoftran and S. Jenkins installed Isolation and Controls around LSA 10-06 including rope, signage and plastic wrapped waddles to control water run-off into the area from other areas. A. Schooley and N. Jordan verified that the isolation d controls were in place and continued Pre-FSS/ RASS sampling in LSA l0-07.
I l/08/13 1600 Completed sampling activities forthe day in LSA 10-07. The following samples were pulled.
Sample ID 7l2l-RA-131107-05-01 7l2l-RA-l3l 107-05-02 lll08/r3 1630 See survey 4227 C 13l107 for more detailed information.
Completed installing I&C in LSA 10-06 and completed general housekeeping in the area to prepare it for FSS starting next week. Post-checks performed on all FSS meters that were used. All meters passed successfully.
END SJ/I{J/AS/JH Record Westi Class 3 FSS Field Log _ of
Revision:2 LSA.IO Page Pl of I IIDP-PR-FS$701, Final Status Suwey Plan llevelopment APPENDIX P{
FSS FIELD LOG Survey Anea:
Suney Unit:
==
Description:==
==
Description:==
Section 07 Burial Pit Open Land Area 07 tr'SS Field Los:
Date/Time: Observation or Comment:
1lll l/13 0630 Received our daily FSS and $afety briefing.
lllllllS 0710 Performed daily instrument sourc checks for the 2221 metersAA, DD and FF nd2360 meters B and D. All FSS meters successfully passed the source check.
I t/l l/13 0E30 N. Jordan, J. Hoftnan, A. Schooley verified that the isolation and conhols were in place and continued Pre-FSS/ RASS sampling in LSA 10-07.
I 1/1 l/13 1000 J. Hoffinan was pulled to complete a release survey for a dump truck to be used in the movement of Stockpile 2 soil to the north laydown area.
See survey 4262 C 13l I I I for more detailed information.
l1/l l/13 1300 N. Jordan, J. Hoffinan and A. Schooley continued Pre-FSS/ RASS sampling in LSA 10-07.
1ll11/13 1600 Completed sampling activities in LSA 1G'07. The following samples were pulled.
Sample ID 7121-RA-l3l107-05-17 7121-RA-131107-05-18 7121-RA-131107-05-19 712l-RA-131107-05-20 7121-RA-131107-05-21 7l2l-RA-t3rt07-05-22 712l-RA-l3 tt07-0s-23 7121-RA-l3 tt07-05-24 7121-RA-l3l 107-05-25 7l2t-RA-131107-05-26 7l2l-RA-131107-05-27 7l2l-RA-t3l 107-05-28 See survey 4266 C 13l I I I for more detailed information.
Post-checks performed on all FSS meters that were used. All meters passed successfully.
END SJ/T.IJ/JTVAS Technicien SJA.IJiAS/JH l l/il/13 1630 Class 3 FSS Field Log _ of _
Revision:2 HDP-PR-X'S$701, Finat Status Survey Plan Development APPENDIX P{
==
Description:==
==
Description:==
See survey 4403 C 13l I 19 for more detailed information.
J. Hoffinan proceeded to LSA 10-07 to perform FSS GWS of the area.
J. Hoftnan completed a section of FSS GWS in LSA l0-07. Returned to ttre office to download the data and document the surveys The GWS created GPS maps:
LSA_1007_I 1 l9l3_AA and LSA_1007 I I t9l3 _AA 2.
See survey 4407 C 13l119 for more detailed information.
Post checks performed on all FSS meters that were used. All meters passed successfully.
END SJ/I.IJIJIVAS PagePl ofl Suruey Area:
Survey Unit:
Burial Pit Open Land Area / Stockpile Area 10-07 & t2-06 Section LSA 10-07 & LSA 12-06 FSS Field Los:
Date/Time: Obselvation or Comment:
Technician llll9ll3 M30 Received our daily FSS and safety briefing.
SJAiJ/AS/JH llll9ll3 0730 Performed daily instrument source checks for the 2221 metersAA, DD and FF and2360 meters B and D. All FSS meters successfully passed the source check.
11/19/13 0815 A. Schooley performed a second manual GWS in LSA 12-06 near stockpile I to Veri! that the surface is clean before placing screened reuse material in the area.
The area is expanding as stockpile I gets processed through the screener and more area beneath it is exposed and ready for walkover.
See survey 4403 C 13l I 19 for more detailed information.
I l/19/13 0830 J. Hoffinan and N. Jordan verified that the isolation and controls were in place and conducted FSS walkovers in LSA 10-07.
I l/19/13 I100 J. Hoffinan and N. Jordan completed a section of FSS GWS in LSA 10-07.
Returned to the office to download the data and perforrr mid{ay source check of the instruments. The GWS created GPS map files: LSA_1007_111913_DD.
See survey 4386 C 13l I 19 for more detailed information.
llll9ll3 ll30 A. Schooley completed the manual GWS in LSA 12-06. No anomalous readings were found.
ll/19/13 1300 ll/19/13 1600 tut9tr3 t630 FSS Field Log _ of _
Revision:2 Page Pl of I HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P{
FSS FTELD LOG LSA.IO & LSA 12 Burial Pit Open Land Area / Stockpile Area Survey Area:
Survey Unit:
10-07 &12-06
==
Description:==
==
Description:==
Easting 827880.340 Section LSA 10-07 & LSA 12-06 f,'SS Field Loe:
Dete/Time: Obsenation or Comment:
Technician lll20ll3 0630 Received our daily FSS and safety briefing.
SJNJiAS/IH lll20ll3 0720 Performed daily instrument source checks for the 2221 meters AA, DD and FF and2360 meters B and D. All FSS meters successfully passed the source check.
ll20ll3 0830 J. Hoffinan and N. Jordan verified that the isolation and controls were in place and conducted FSS walkovers in LSA 10-07.
1l/20/13 0900 A. Schooley performed biased soil sampling LSA 12-06 near stockpile l. The soil Sample was then transported to the on-site lab for analysis. The sample information is as follows:
Sample ID 7250-SS-13 I 120-14-01 Northing 865513.070 tv20lt3 t600 tu20lt3 t630 See survey MM C l3ll20 for more detailed information.
J. Hoffinan and N. Jordan completed a section of FSS GWS in LSA 10-07.
Returned to the office to download the data and document the surveys. The GWS created GPS map file: LSA_1007_I12013_DD.
See survey 4409 C l3ll20 for more detailed information.
Post checks performed on all FSS meters that were used. All meters passed successfully.
END SJ/i.IJ/JIYAS Class 3 FSS Field Log _ of _
Revision:2 LSA-10 Page Pl of1 HDP-PR-FSS-701, Final Status Sumey Plan Development APPENDIX P-6 FSS FIELD LOG Survey Area:
Suney Unit:
==
Description:==
==
Description:==
Section LSA 10-07 Burial Pit Open Land Area 10-07 FSS Field Loe:
Date/Time: Obseration or Comment:
lll22ll3 0630 Received our daily FSS and mfety briefing.
lll22ll3 0720 Performed daily instrument source checks for the 2221 meters AA, DD and FF and2360 meters B and D. AII FSS meters successfully passed the source check.
lll22l13 0830 A. Schooley and N. Jordan verified that the isolation and controls were in place and conducted FSS walkovers in LSA 10-07.
lll22ll3 1330 A. Schooley and N. Jordan completed a section of FSS GWS in LSA l0-07.
Returned to the office to download the data and document the surveys. The GWS created GPS map files: LSA_I 007_1 12213 _DD and LSA_1007 _ll22l3 _FF.
See surveys 4429 C 131122,4436 C l3ll22 for more detailed information.
lll22ll3 1630 Post checks performed on all FSS meters that were used. All meters passed successfully.
END NJ/AS Technician NJ/AS Class 3 FSS Field Log _ of
Revision:2 LSA.lO PagePl ofl HDP-PR-FSS-701, Final Status Suruey Plan Development APPENDIX P{
FSS FIELD LOG Sumey Area:
Survey Unit:
==
Description:==
==
Description:==
Section LSA 10-07 Burial Pit Open Land Area 10-07 FSS X'ield Loe:
Date/Time: Obseryation or Comment:
ll/24/13 1200 Performed daily instrument source checks for the 2221 meter FF. FSS meter successfully passed the source check.
lll24/13 1230 A. Schooley verified that the isolation and controls were in place and conducted FSS walkovers in LSA 10-07.
lll24ll3 1400 A. Schooley completed a section of FSS GWS in LSA 10-07.
Returned to the office to download the data and document the surveys. The GWS created GPS map files: LSA_1007_I12213_DD and LSA_1007_ll22l3_FF.
See surveys 4429 C l3ll22, 4436 C l3ll22 for more detailed information.
lll24/13 1430 Post checks performed on FSS meter. Meter passed successfully.
END AS Technician AS Non-Pro FSS Field Log _ ot
Revision:2 LSA-IO PagePl ofl HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P{
FSS FIELD LOG Survey Area:
Survey Unit:
06 &07
==
Description:==
==
Description:==
Section 06 &07 Burial Pit Open Land Area f,'SS Field Loe:
Date/Time: Obselvation or Comment:
lll25/13 0630 Received our daily FSS and safety briefing.
lI/25113 0700 Performed daily instrument source checks for the 2221 meters AA, DD and FF and'2360 meters B and D. All FSS meters successfully passed the source check.
lll25ll3 0800 A. Schooley, J. Hoftnan and N. Jordan verified that the isolation and control measures were in place and continued FSS walkovers in LSA 10-07.
lll25ll3 ll00 A. Schooley, J. Hoffinan and N. Jordan completed sections of the GWS of LSA 10-07 and returned to the office to perform mid{ay instrument source checks, Download the data and document the surveys. During the GWS, the following GPS data files were created: LSA_I007_112513_AA, LSA_1007_I12513_DD and LSA_1007 _ll25l3_FF. No anomalous readings were noted during the walkovers.
See surveys 4453 C l3ll25 and 4454 C l3ll25 for more detailed information.
lll25ll3 1300 Received the FSS instruction briefing from S. Jenkins for Biased Sampling in LSA 10-06.
lll25ll3 1400 J. Hoffinan and N. Jordan verified that the isolation and control measures were in place and continued FSS walkovers in LSA 10-07. The walkovers consisted of GPS walkovers ofthe flat surfaces and manual walkovers of the sidewalls.
The GPS walkovers created the following file: LSA_1007_112513_AA 2.
See survey 4470 C l3ll25 for more detailed information.
lll25/13 1430 A. Schooley proceeded to LSA 10-06 and verified that the isolation and control measures were in place. Sample location flags were placed and sampling equipment was staged and restocked for tomorrow's sampling activities.
lll25ll3 1600 A. Schooley, J. Hoffinan and N. Jordan returned to the office to download data And perform survey documentation.
lll25l13 l@0 Post-checks performed on all FSS meters that were used. All meters passed successfully.
END SJ/NJ/JI{/AS Technician SJNJ/AS/JH Class 3 FSS Field Log _ of
Survey Area:
Survey Unit:
Revision: 2 LSA-10
==
Description:==
==
Description:==
06 &07 HDP-PR-FSS-701, Finar status suney pran neveropment APPENDIX P-6 X'SS FIELD LOG Page P1 of2 Section LSA 10-06 & t0-07 Technician SJNJ/JWAS AG/I\\4D AG/MD FSS Field Loc:
Date/Time: Obsgrvation or Comment:
ll/26/13 0630 Received daily safety and FSS briefing.
I I 126l13 071 5 Performed daily instrument source checks for FSS meters. All meters t t/26il 3 0820 successfully passed the source check.
A. Gayler and M. Dekeyser began manual Gws in the former stockpile 5 & 6 areas.
ll/26/13 0930 A. Schooley and S. Jenkins verified that the isolation and conhols were in place for LSA 10{6 and 10-07 and began systematic soil sampling in LSA 10-06.
J. Hoffinan andN. Jordan began FSS GWS in LSA 10-07.
ll/26/13 Il00 A. Gayler and M. Dekeyser completed the manual GWS of former stockpile 5 & 6 area. See survey 4476 C 131126 for more detailed information.
11126113 1300 J. Hoftnan andN. Jordan continued GWS in LSA 10-07. A. Schooley and S-Jenkins continued systematic soil sampling in LSA 10-06.
I I 126l13 1430 A. Schooley and S. Jenkins completed systematic sampling in LSA l0-06. The Following samples were completed.
Sample ID Ll0060lBES00 Ll00602BES00 Ll00603BES00 Ll00604BES00 L100605BRS00 Ll00605BRQ00 Ll00606BES00 L1006078ES00 Ll00608BES00 L1006098ES00 See survey 4490 C 131126 for more detailed information.
I I 126l13 I 5 l0 A. Schooley and S. Jenkins entered LSA 10-07 to begin systematic soil sampling FSS Field Log _ of
Revision:2 LSA-10 Page Pl of1 Suney Area:
Survey Unit:
07 HDP-PR-FSS-701, Final Status Suruey Plan Development APPENDIX P-6 FSS FIELD LOG
==
Description:==
==
Description:==
Burial Pit Open Land Area Section LSA 10-07 FSS Field Loe:
Date/Time: Observation or Comment:
lll27ll3 0630 Received daily safety and FSS briefing.
ll/27113 0715 Performed daily instrument source checks for FSS meters. All meters successfully passed the source check.
lll27ll3 0915 A. Schooley verified that the isolation and controls were in place for LSA 10-07 and continued systematic soil sampling.
lll27ll3 1545 A. Schooley completed systematic sampling in LSA 10-07. The following rU27/131640 samples were completed:
Sample ID Ll00703BSS00 Lr00704BRS00 Ll00704BRQ00 Ll00706BRS00 Ll00707BES00 Ll00708BES00 Ll007l2BES00 Ll007l3BRS00 Ll007l4BES00 See survey 4501 C l3ll27 for more detailed information.
Performed post checks on FSS meter. All meter passed successfully.
END AS/NJ Technician ASn IJ Westi Class 3 FSS Field Log _ of _
Revision:2 HDP-PR-FSS-701, Final Status Survey plan Development APPENDIX P-6 FSS FIELD LOG LSA-10
==
Description:==
==
Description:==
4549 C 131203,4550 C 131203,4551 C 131203 S. Jenkins and A. schooley completed biased soil sampling in LSA 10-06 and LSA l0-07. The following samples were pulled:
Page Pl of 1 Survey Area:
Suney Unit:
Budal Pit Open Land Area 06 &07 Section LSA 10-06 & 10-07 FSS Field Los:
Date/Time: Obseryation or Comment:
12103113 0630 Received daily safety and FSS briefing.
l2103l13 0715 Performed daily instrument source checks for FSS meters. All meters successfully passed the source check.
12/03113 0810 N. Jordan and J. Hoffinan verified that isolation and controls were in place in LSA 10-10 and began performing GWS ofthe area.
12/03113 1300 S. Jenkins and A. Schooley entered LSA 10-06 and 10-07 to perform biased soil sampling activities.
12103/13 1600 N. Jordan and J. Hoftran completed FSS GWS forthe day in LSA 10-10. Returned to the office to download data and document the surveys. See the following surveys for more detailed information:
12t03n31615 t2l03lt3 t630 l0-06 Sample ID LI006IOBUBOO Ll006uBUB00 Ll006l2BUB00 10-07 Sample ID Ll007l5BUB00 Ll0070lBUIo1 Ll0070lBUI02 L100701BUr03 Ll00701BUI04 Ll007l6BuB00 See surveys 4570 C 131203 and457l C 131203 Perforrned post checks on FSS meter. All meters passed successfully.
END SJ/JIVASA{J Technician SJ/JIVASNJ FSS Field Log _ of _
Obfelvation or Comment:
Revision:;2 Survey Area:
Survey Unit:
06&07
==
Description:==
==
Description:==
HDP-PR-FSS-701, Final status survey pran Deveropment APPENDIX P{
FSS FIELD LOG LSA-10 PagePl ofl Burial Pit Open Land Area FSS Field Loe:
t2/03n3 0630 t2/03/13 0715 t2/03/13 0810 t2/03fi3 1300 t?/03il 3 t600 t2/03n316t5 t2/03/13 1630 10-06 Sample ID Lr00610B[JB00 Ll00611BUB00 Ll006r2BuB00 10-07 Sample ID Ll007l5BUB00 L10070lBuIo1 L100701BIJIo2 L10070lBt I03 Ll0070lBUI04 Lr007t6BUB00 Perfopmed daily instrument source checks for FSS meters. All meters succ-essfully passed the source check, lv, Joldan and J. Hoffinan verified that isolation and controls were in place in LSA [0-10 and began performing GWS ofthe area.
S. Jenkins and A. Schooley entered LSA 10-06 and 10-07 to perform biased soil sampling activities.
N. Jordan and J. Hoffrnan completed FSS GWS for the day in LSA l0-10. Returned to the office to download data and document the surveys. See the following surveys for more detailed information:
4549 C 131203,4550 C 131203,4551 C t3t2o3
- s. Jenkins and A. schooley completed biased soil sampling in LSA 10-06 and LSA 10-07. The following samples were pulled:
Technician SJ/JWASAU See surveys 4570 C 131203 and457l C 131203 Performed post checks on FSS meter. All meters passed successfully.
END SJ/JIVAS/T{J Class 3 FSS Field Log _ of _
Revision: 2 Survey Area: LSA-I0 Survey Unit: 07 FSS Field Loe:
Date/Time:
t2l3l2013 1200 Page Pl of I HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P-6 FSS FIELD LOG
==
Description:==
==
Description:==
Section 7 Burial Pits Open Land Area Observation or Comment:
Radiological Engineering is requesting bias and investigation sampling and survey in LSA-10-07 based on elevated readings found during the GWS and statistical analysis of the data collected during the FSS GWS. The bias and investigation sampling and survey consist of the followins:
Technician
- 1) Beginning at the location of bias sample L100701BU800 (6olleEted diring the GWS based on a rtiadingof 26K, see Figure Sample Location LSA-10-07) perform a scan survey moving out from the sample location in a spiral pattern until the survey readings are at the general background. Collect 4 investigation samples surrounding the location of sample L I 0070 1BUB00 in order to bound the elevated readings. The sample locations should be equidistant from each other surrounding the bias sample location.
Ll0070lBUB00 coordinate: X) 827783.2, Y) 864980.1
- 2) Collect a sample of the following 6 inches of soil below sample location L1 0070 I BUB00.
- 3) Perform a GWS of the area covering Region #1 from Figure LSA-l0-07 AA 1l1913. Look and listen for anomalous readings.
Collecl a slx inch sample from the location with the hiehest reading.
"$r(3
'=4r.,g Class 3 FSS Field Log I of 3
T1
\\A
-(\\
F;ro L-o l*
o-t-)
l.r" I
LEGEND:
- Sample Location flrss Survey Unit l-l eP Excavation Unit f]
NCS Controls Boundary
'-r-RR Spur
+
Raikoad Fence Gate Location LSA-10-07 L10070lBUB00 BP South 5 0
20 40 Feet Hematite Decommissioning Project Jefferson County Hematite, MO
864960.(m 864955.000 864950.000 864945.000 864940.000 864935.000 864930.(m 827710.mO 427775.ON 427720.m rsA-1G07 AA 111913
+-*r,}
a277E.W t stht 427710.m 82773S.000 a277N.NO 427745.m Pc6,an w t Esfo2
^.j;:'.*ffi';ry- *:X
- .r.i+r.:-::T, *,1-- rt;;.....
t..i;:'E-*q5ffi
-* *.*:.iry:- o' 3
< Awnge
{, < 1 sigma a < 2 sigma
. < 3 sigma a > 3 slgma lJ"t.f"L "*
- h=fit. n./
r3lxU t\\16A rr{17-I
- 15oo, e4f oas\\ 'Q*fu^-"Qw6 'f tI' W anQ-/^- a'n& yootz a'"&
.g,.stem W *"m*l-ows rcaL'1u '
FSS futd Lo3 -L 'e 3
Revision: 2 Survey Area:
Survey Unit:
Page Pl of2 HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 FSS FIELD LOG LSA-10
==
Description:==
==
Description:==
Burial Pits Open Land Area NE Corner of LSA 10-02 (Berm) 08 FSS Field Loe:
Date/Time:
Observation or Comment:
7l3lll3 0715 Performed daily Pre source check of FSS field instruments.
Performed GWS of LSA-10-08 (Bladder Dam Area) using handset A yie7,L""8;.i;tffi :'*H,T,H#*'-'r:*,tXt'i3l86aJ#*'
Technician SDJ / JH Northing 86s383.840 86s384.380 86s38s.920 865390.430 86s376.980 86s384.030 Eastine 827406.800 Northins 6s4384.210 Post source check was performed and meter DD passed successfully.
LSA boundaries were roped off with green FSS rope and appropriate signage was installed on the ropes.
END SDJ/JH Elevated soil locations were flagged and stored using GPS. All data was downloaded and transferred to FSS Engineering for data analysis.
Elevated Locations are as follows:
ID Eastine 16,t7 827406.090 18,19 827408.3t0 20,2t 827416.t80 22,23 827417.230 24,25 827418.150 26.27 8274t9.360 ID Rebar Rebar debris was identified in the sidewall of the excavated area. The rebar was surveyed and subsequently cut at the sidewall surface. No elevated readinfs were noted <in the rebar or adjacent soils.
Rebar was located at the following coordinates:
Non-Pro Class 3 tt PT Fie tl Lol l pl9
Revision: 2 8n^3 0730 PageP2 of2 HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 FSS FIELD LOG Performed daily Pre source check of FSS field instruments.
Biased soil samples were taken at the six elevated locations noted on the previous days GWS. An additional biased sample location was
'generated blsed on the GWS data analysis performed by S. Price. The additional location coordinates are N-865372.03 &,8-827456.25. All samples were taken to a depth of 12" at 6" intervals. Collimated and un-collimated readings were taken with a 2"x2" NaI at the surface and at sample depth for all samples.
See survey 2943 C 130801 for biased soil sample information, depth and readirigs.
Ten Systematic Sample locations were created by FSS Engineering and f-lagged using GPS. Locations were then sampled to the dEpth speEified in the soil sampling instructions.
The Systematic Sample Locations are as follows:
ID Easting Northing L1008018RS00 827409.700 865391.000 L100802BES00 827409.700 865391.000 L100803BES00 8274t2.800 865379.400 L100804BRS00 827421.300 86s387.900 L1008058ES00 827421.300 865387.900 Ll00806BES00 827424.400 865376.300 Ll00807BRS00 827432.900 86s384.800 Ll00807BRQ00 827432.900 865384.800 Ll00808BES00 827432.900 865384.800 Ll00809BES00 827427.500 865364.700 Ll00810BES00 827436.000 865373.200 Ll00811BRS00 827444500 865381.700 L1008128ES00 827444.500 865381.700 L100813BES00 827447.600 865370.100 L1008l4BRS00 827456.100 865378.600 L100815BES00 827456.t00 865378.600 Glass was discovered at sample location L100811BRS00 at a depth of 12-14".
See survey 2944 C 130801 for systematic soil sample information, depth and readings.
SDJ / JH Post source check was performed and all meters passed successfully.
END SDJ/JH TPT SS Field Log ? of I Westin
Revision: 2 Page P-l ofl HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.4 F'SS SAMPLE & MEASTIREMENT LOCATIONS & COORDINATES Survey Unit: No. 08
==
Description:==
NE Corner oJLJa 4-02lEgqq)
Survev Tvne: Soil Sampli Classification: 1
- Distance in feet from southwest comer ofthe surface.
Surface; Floor: F, Wall: W, Ceiling = g, Roof : R CSM; Surface, Roo! Deep or Uniform Type; Systematic: S, QC = Q, Biased = B, Investigation: I Measurement or Sample ID Surface or CSM Type Start Depth (feet)
End Depth (feet)
Easting (X Axis)*
Northing (Y Axis)*
11008018RS00 Root S
0 2.5 827409.7 855391.0 11008028ES00 Deep S
2.5 3
827409.7 855391.0 11008038ES00 Deep S
0 0.5 827412.8 865379.4 11008048RS00 Root s
0 1.5 82742t.3 86s387.9 11008058ES00 Deep S
1.5 2
827421.3 865387.9 11008058ES00 Deep S
0 0.5 827424.4 855376.3 11008078RS00 Root S
0 4.5 827432.9 86s384.8 11008078RQ00 Root a
0 4.5 827432.9 865384.8 11008088ES00 Deep s
4.5 5
827432.9 855384.8 1100809BES00 Deep S
0 0.5 827427.5 865364.7 11008108ES00 Deep S
0 0.5 827436.0 865373.2 11008118RS00 Root S
0 3.5 827444.5 865381.7 L100812BESoo Deep S
3.5 4
827444.5 865381.7 11008138ES00 Deep S
0 0.5 827447.6 86s370.1 11008148RS00 Root S
0 2.5 827456.1 855378.6 11008168U800 Uniform B
0 0.5 827406.7 865383.8 11008178U800 Uniform B
0.5 1.0 827406.L 85s383.8 1100818BUB00 Uniform B
0 0.5 827408.3 855384.4 11008198U800 Uniform B
0.5 1.0 827408.3 86s384.4 11008208UB00 Uniform B
0 0.5 8274L6.2 86s38s.9 11008218U800 Uniform B
0.5 1.0 8274L6.2 865385.9 1100822BUB00 Uniform B
0 0.5 827417.2 865390.4 11008238U800 Uniform B
0.5 1.0 827417.2 85s390.4 11008248U800 Uniform B
0 0.5 827478.2 865377.0 L10082sBUB00 Uniform B
0.5 1.0 8274L8.2 865377.0 11008268U800 Uniform B
0 0.5 8274L9.4 865384.0 11008278U800 Uniform B
0.5 1.0 8274L9.4 86s384.0 11008288U800 Uniform B
0 0.5 827406.8 865384.2 Quality Record Westinghouse Non-Proprietary Class 3
Revision:2 Survey Area:
Survey Unit:
Page Pl ofl FSS Field Loe:
Date/Time:
o?-3,l-?ro13 HDP-PR-FSS-701, Final Status Survey Plan Development LSA-10 APPENDIX P-6 FSS FIELD LOG
==
Description:==
==
Description:==
Burial Pits Open Land Area NE Corner of LSA 10-02 (Berm) reffaa tl<- lu" slt;ff. crf fi Aol Ew1, FSS Field Log I "t1\\
Survey Area:
Survey Unit:
Page Pl ofl HDP-PR-FSS-701, Final Status Survey Plan Development LSA-IO APPENDIX P.6 FSS FIELD LOG
==
Description:==
==
Description:==
Burial Pits Open Land Area NE Corner of LSA 10-02 (Berm)
/tn
{ce(
kle"u' FSS Field Log*"q FSS Field Loe:
t/p$l'a$
Date/Time:.
Observation or Comment:
a-fr-ol - lotykp 54a,f'6f ice"( A oihlq sbftTlx(,
Revision:2 Survey Area: LSA-10 Survey Unit: 08 FSS Field Loe:
Date/Time: Observation or Comment:
r8'oL'zolf/l'Sq
. E hr, iaeetin
{ Gw9 a,roh aJJi (foy.,
SntU qre Page Pl of 1 HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P-6 FSS FIELD LOG
==
Description:==
==
Description:==
Burial Pits Open Land Area NE Comer of LSA 10-02 (Berm)
'oh_
I t1,1O L4{
- t t^riil
,Vg) cwvv) ru n+J io
[. r*eJ tw ey i Loaoo,
e len 14 tvle4g c+re ep Cc+ uob FSS Field Loe 1of {
Page Pl ofl HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 F'SS FIELD LOG
==
Description:==
==
Description:==
Burial Pits Open Land Area NE Corner of LSA 10-02 (Berm)
Survey Area: LSA-10 Survey Unit: 08 FSS Field Loe:
- EnA,
//u" fUy: (Lse ou,t gary parkop lL IV, o ],09. [)
FSS Field r"* I "rj
Revision:2 HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 FSS FIELD LOG Survey Area: LSA l0
==
Description:==
Burial Pits Open Land Area Survey Unit:
09
==
Description:==
VOC Pit in LSA 10-06 FSS Field Loe:
Date/Time Observation or Comment Quality Record Westinghouse Non-Proprietary Class 3 Page Pl of1 Technician 09lr9lt3 0630 09ll9lt3 0700 09lt9lt3 0930 09lt9n3 t300 09lr9lt3 ts20 Received our daily safety briefing covering hazards associated with GWS, surveying and soil sampling.
Performed daily instrument source check. All meters successfully passed the source check' Io-1 \\$.riffi uf4t r,,vt/
Pulled Soil Samples from LSA5-O1.'Samples were sealed with tape, labeled and transported to the lab for on-site analysis. See survey 3530 C 130919 for more information. Conducted GWS of LSA 10-09 VOC Pit area using GPS and 2221DD. No elevated areas were noted. See survey 3502-C 130919 for more information.
Entered LSA 10-09 to perform systematic soil sampling. The area is under isolation and control, consisting of green and white rope with signage attached. A total of seven systematic, two biased and one duplicate sample were taken. All samples were sealed with tape and labeled and transported to the on-site lab for analysis. See Survey 3526 C 130919 for more information.
Performed daily post source check. All instruments passed successfully.
END SJAIJiAS SJ/ASNJ FSS Field rog I orf
Revision: 2 HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 FSS FIELD LOG Survey Area: LSA 10
==
Description:==
Survey Unit:
FSS Field Loe:
Date/Time Observation or Comment FSS Field rog I orf Quality Record Westinghouse Non-Proprietary Class 3 Page Pl of I Technician 09123113 0630 l Received our daily safety briefing covering hazards associated with GWS, I AS/JH surveying and soil sampling.
09123113 0700 l Performed daily instrument source check. All meters Successfully passed the source check. Moved equipment to the barn shack area.
09123113 0800 l Staged counting station at location of stockpiles 5 & 6 for vegetation removal. Monitored vegetation removal activities.
09123113 1500 l Performed Biased Soil Sampling in LSA 10-09. The area is under isolation and control, consisting of green and white rope with signage attached. A single biased sample was taken. The sample was sealed with tape and labeled and transported to the on-site lab for analysis. See Survey 3547 C 130923 for more information.
09123113 1535 l Performed daily post source check. All instruments passed successfully.
END AS/JH
Revision:2 Survey Area: LSA-10 Survey Unit: 09 FSS Field Loe:
Date/Time:
9l24l13 09:00 Page Pl of2 HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 FSS F'IELD LOG Burial Pits Open Land Area
==
Description:==
==
Description:==
VOC Pit in LSA 10-06 Observation or Comment:
Environmental Personnel (R. Andrews) informed Radiological Engineering (M. Bresnahan and R. Neveau) of some plastic sheeting maTeriat foInA during chemical confirmatoiy samplirig of LSA-10--
09.
Technician
-0&
9l24ll3l3:00 Radiological Engineering (M. Bresnahan and R. Neveau) accompanied Environmehtal Personnel (R. Andrews) to LSA-10-09 to assess the status and confirm the plastic sheeting material that was found during confirmatory samplinf. fne plastic Iheeting was determined to be the bottom of a test pit that was excavated during the Fall 2012time frame while sampling and surveying for VOC contamination and then backfilled for safety purposes.
Environmental Manager (K. Davis) expresse-l concern regarding the potential for other areas onsite where VOC test pits were excavated irnd backfill. K. Davis directed R. Andrews to zupply a figure with the locations of all test pits that were excavated in LSA-10-09 to determine if the extent of the final excavation was below the bottom elevation of the test pits to verify removal of all backfill material.
,s 9124/13 l4:00 R. Neveau discussed with ECC Personnel (T. Gilbertson) the need to remove the plastic material found in LSA-10-09. R. Neveau dropped the isolation boundary in order for the area where the plastic sheeting was found to be remediated and monitored the entire remediation process.
9l24ll3 15:00 Radiological Engineering (M. Bresnahan and R. Neveau) discussed the phsfic materTal that frai found during confirmatory sampling with NRC Inspector (J. Tapp), who also confirmed seeing this material during his cdnfinrlifriry sampling efforts in LS,q-t0-09 and discussing it with the Environmental Manager (K. Davis). R. Neveau informedl. Tapp that Environmental and Radiological Engineering were workins tb-sether to verifv that LSA-10-09 was excavated to below the lofrest"point where 6ackfill material was placed and we would discuss our findines with J. Tapp the followine day.
-(\\s\\
9l25ll3l3:00 A Draft of figure "LSA-10-09 (BP South 4) TEST PITS was supplied by Environmental Personnel (R. Andrews) to Radiological Eheineerins (M. Bresnahan and R. Neveau). M. Bresnahan and R.
Neieau disEussed with NRC lnspector (J. iapp) the location and purpose of the test pits that were excavated in the footprint of LSA-10-09. R. Neveau exolained to J. Taoo the fisure was a draft our initial assessment was after removal bi'tfre pllstic sheeting material that was found in the area, we did not believe there would be any other areas necessary to excavate.
9126113 06:00 Environmental Manager (K. Davis) sent an email explaining the excavated surface of LSA-10-09 was not adequatelv characterized
-s$
rae.
Westi Class 3 fssfvlAYs, I ol A
Revision:2 PageP2 of2 HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 F'SS F'IELD LOG since there was evidence of test ptts that were excavated and backfilled which had deeper elevations than the current depth of excavation.
9126l13 08:00 Radiological Engineering (R. Neveau and M. Bresnahan) discussed with J. Taoo.
FSS Field Log & of 3.
Revision: 2 Page Pl ofl HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P-6 FSS FIELD LOG Survey Area: LSA 10
==
Description:==
Burial Pits Onen Land Area Survey Unit: __02_
==
Description:==
VOC Pit in LSA 10-06 FSS Field Loe:
DatelTime Observation or Comment Technician 09125113 0630 l Received our daily safety briefing covering hazards associated with GWS, I aslltt surveying and soil sampling.
09125113 0700 l Performed daily instrument source check. All meters successfully passed I the source check. Prepared for GWS walkover of upper area of LSA l0-09.
ogl25ll3 O80O I er,,"r.a LSA 10-09 to conduct cWS using cPS *dlfBB. The area is under isolation and control, consisting "f ;;;;
- ilie.op" *iil, signage attached. Walkover completed and no elevated areas were noted See survey 3585 C 130925 for more information.
09125113 1045 l Performed mid-day source check. 2221BB passed successfully.
09125113 1300 l Completed survey documentation and provided job coverage for barn area work activities.
09125113 1730 l Performed post source check on all instruments. All passed successfully.
END AS/JH Quality Record Westinghouse Non-Proprietary Class 3 FSS Field rog -[- or /
Revision:2 Suney Arca:
10 Suruey Uni*
09 F'SS Field Los:
Ilate/Time Obsenation or Comment HDP-PR-FSS-701, tr'inal Status Survcy Plan Development APPENDD( P{
FSS FTELD LOG Page Pl of I
==
Description:==
Burial Pit Oncn Lend Anee
==
Description:==
VOC Pit Aree Technician r0/ls/13 0630 tolt'lt3 07ts t0nslt3 0730 10/15/13 0900 Received our daily FSS and safety briefing.
I sovrnnrurvers Performed daily instnrment source checks for the 2221 meters and 2360 meters. All FSS meters successfully passed the source check.
Provided job coverage for ECC work in LSA 05-01.
Conducted a walk down of the LSA 1G.09 (VOC Pit) to ensure that the Final Status isolation and control measurs were in place and evaluate the area for possible slip trip and fall hazards, due to recent rainfall and muddy conditions. Standing water was observed in the lowest spots within the pit. It was noted that the area was far too muddy to be considered safe to traverse with the added weight of a backpack and the center of gravity shift caused by the backpack. It was also noted that the only entry way into the area was via a soil ramp. This ramp becomes exhemely slick and hazardous with rainfall events. Notification was made to Rad. Engineering and arrangements were made with ECC to excavate a stair entryway into the VOC Pit area l0/15/13 1300 l Continued coverage ofthe ECC work in LSA 05-01.
10/15/13 1700 l Performed post source check of all FSS meters used. All meters passed post source check successfully.
END SDJ/JAI{AI,JJIALS auafity Record Westinghouse Non-Proprietary Class 3 FSS Field Log I or I
Revision:2 Survey Area:
10 Suney Unit:
09 FSS Field Loe:
Date/Time Observation or Comment HDP-PR-FS$701, Final Status Suney Plan Development APPENDIX P{
FSS FTELD LOG Page Pl of I
==
Description:==
Burial Pit Open Lend Area
==
Description:==
VOC Pit Area Technician t0/lE/13 0630 l ReceivedourdailyFsSandsafetybriefing.
lsoJ/fefrmrfel,s I 0/ I 8/ I 3 07 I 5 l Performed daily instmment sourc checks for the 2221 meters and 2360 meters. All FSS meters successfully passed the source check.
l0ll8ll3 0720 l Provided job coverage for ECC work in LSA 05-01.
I 0/l 8/13 0830 l Proceeded to LSA I G09 area and ensured that the Final Status isolation and control measures were in place. Conducted a gamma walkover survey and a 100% visual inspection ofthe horizontal surfaces of LSA 1G09 (VOC Pit). No elevated areas were noted. See Surrrey 3930 C 1310lE for more detailed information.
10/18/13 1300 l Continued ooverage ofthe ECC work in LSA 05-01.
10/18/13 1330 l Finished GWS and returned to office to download and pnocess the data.
10/18/13 1430 l survey documentation completed for GWS of LSA 10-09. Began statistical analysis of walkover data.
10/18/13 1630 l Completed statistical analysis of walkover data.
l0ll8ll3 l7l5 l Performed post source check of all FSS meters used. All meters passd post source check successfully.
END SDJ/JAI{AIJJ/ALS FSS Field rog -L of I aua[ty Record Westinghouse Non-Proprietary Class 3
Revision:2 Suney Anea:
10 Survey Unit 09 FSS Field Los:
Date/Time Observation or Comment HDP-PR-FSS-701, Final Status Suney PIan llevelopment APPENDIX P{
r.SS FIELD LOG PagePl ofl
==
Description:==
Burial Pit Onen Lend Area
==
Description:==
VOC Pit Area Technician t0l2vt3 0630 t0l2ut3 07ts t0t2yt3 0730 l0/2rl13 0800 t0l2ut3 1300 r0l2vt3 l6l5 Received our daily FSS and safety briefing.
Performed daily instrument source checks for the 2221 meters and2360 meters. All FSS meters successfully passed the source check.
Provided job coverage for ECC work in LSA 05-01.
Prepared equipment for sidewall surveys and systematic soil sampling of LSA 10-09.
Proceeded to LSA 10-09. Ensured that the Final Status isolation and control measunes were in place. Began manual sidewall surveys of LSA 10-09. Conducted systematic soil sampling at the following locations.
ID Norttring Easting L10091IBSS00 8650s1.20 827750.70 Lr009l2BRS00 865051.20 827750.70 Ll009l3BRS00 86s032.20 82775s.80 L1009148ES00 865032.20 827755.80 Ll009l5BSS00 865013.30 827760.90 Ll009t6BRS00 865013.30 827760.90 Ll009l7BRS00 86s046.10 827769.t0 Lr009l8BES00 865046.10 827769.70 Ll009l9BES00 86s027.20 827774.70 LI00920BSS00 865060.00 827783.50 Ll0092lBRS00 86s060.00 827783.50 LI00922BRS00 865M1.00 827788.60 LI00922BRQO0 865041.00 827788.60 LI00923BES00 865041.00 827788.60 See survey 3939 C l3l02l for morc information on the systematic samples.
Continued sidewall surveys and systematic soil sampling.
Finished the sidewall surveys and returned to office to document the surveys. See survey 3965 C l3l02l for sidewall survey information.
Performed post source check of all FSS meters used. All meters passed post source check successfully.
END SDJ/JAI{AIJJ/ALS SDJ/JAHNJJ/ALS Quahty Record Westinghouse Non-hoprietary Class 3 FSS Field Log _ of _
Revision:2 Suney Area:
10 Survey Unit 09 FSS Field Loe:
Date/Time Obsenation or Comment HDP-PR-I'SS-701, Final Stetus Survey PIan Development APPENDIX P{
FSS FIELD LOG Page Pl of I
==
Description:==
Burial Pit Ooen Land Area
==
Description:==
VOC Pit Area Technician t0t22t13 10122/13 0630 t0t22n3 0730 r0l22lt3 0900 Received our daily FSS and safety briefing.
Performed daily instrument source checks for the 2221meters and 2360 meters. All FSS meters successfully passed the source check.
Providedjob coverage for ECC work in LSA 05-01.
Prepared equipment for sidewall sampling of LSA 10-09.
Proceeded to LSA 10-09. Ensured that the Final Status isolation and control measures were in place. Began the process of sidewall sampling in LSA 10-09 by placing the flags using a measuring tape and GPS unit, per FSS instructions for this area. Systematic soil sampling of the sidewall was done at the following locations.
ID Northing Easting LI00924BSS00 865012.10 827769.40 LI00925BRS00 865021.70 827790.00 LI00926BRS00 865037.00 827801.70 L100927B8S00 86s0s7.30 827790.00 LI00928BSS00 86506s.70 827773.10 LI00929BRS00 86s055.10 827752.60 L1009308RS00 865035.30 827745.50 See survey 3956 C 131022 for morc information on the systematic samples.
Continued systematic soil sampling of the sidewall locations.
Refurned to offrce to document the surveys.
Performed post source check of all FSS meters used. All meters passed post source check successfully.
END SDJ/JAIIA{JJIALS SDJ/JAH/NJJ/ALS 0720 t0l22lt3 r0l22lt3 1300 l61s auatty Record Westinghouse Non-Proprietary Class 3 FSS Field Log _ of _
Revision:2 Survey Area:
l0 Suruey Unit:
09 FSS Field Loe:
Date/Time Observation or Comment HDP-PR-I'SS-701, Final Status Survey Plen Development APPENDD( P-6
[.SS FIELD LOG PagePl ofl
==
Description:==
Burial Pit Open Land Anea
==
Description:==
VOC Pit Aree Technician r0/23n3 M30 t0l23n3 0710 l0/23l13 0800 t0l23n3 09rs t0t23n3 1500 rcnyB 1635 Received our daily FSS and safety briefing.
Performed daily insfument source checks forthe zzzl metersand 2360 meters. All FSS meters successfully passed the source check.
Received the coordinates of the areas of interest within LsA 10-09. Ioaded the coordinates into the GPS handset.
Proceeded to LSA lG'09 to investigate areas of interest noted during the GWS survey. Ensured that the Final Status isolation and control measures were in place. The comers of four small areas were flagged using GPS and colored pin flags. The aneas were then walked over manually at a manimum speed no greater than one foot per second, with the probe as close to the surface as physically possible. No areas of elevated readings were noted during the walkover survey. See the representation of areas of interest below.
LSA 1009 lnvestigation Areas t0 Eato-827800 827790 827780 827770 827760 865030 Eastlng Returned to office to document the surveys. See surveys 3930 c 131018 and 3929 C 13l0l8 for more information.
Performed post source check of all FSS meters used. All meters passed post souroe che,ck successfully.
END SDJ/JAII/NJJIALS SDJ/JAI{NJJ/ALS Quality Record Westinghouse Non-Proprietary Class 3 FSS Field Log _ of _
Revision:2 Survey Anea:
10 Suwey Unit 09 FSS Field Los:
Date/Time Observation or Comment HDP-PR-X'S$701, Final Status Survey Plan Development APPENDX P{
FSS FIELD LOG Page Pl of I
==
Description:==
Burial Pit Open Lend Area
==
Description:==
VOC Pit Area Technicien t0t24n3 M30 10124/13 0710 l0l24lt3 0745 laffift3 1600 wt{.0 tQl*fi3 1635 to-2fi3 Received our daily FSS and safety briefing.
Performed daily instrument source checks forthe 2221metersand 2360 meters. All FSS meters successfully passed the source check.
Proceeded to LSA 10-09 to provide job coverage during the bacldlling of the LSA. Clean oflsite bacldll was brought in to fill the excavation.
Provided continuous HP monitoring and control of the LSA boundary.
Constant visual observation was made on the activities and measures were taken to avoid any possible cross-contamination of the clean area. New Geo-Textile fabric was placed over any areas that may possibly come into contact with equipment or clean soil, to provide a barrier between un-surveyed areas and surveyed areas.
Backfill was completd all geo-textile bariers were removed from the area and general housekeeping was performed. Isolation and control measure were then removed when the area was deemed complete.
Returned to the FSS office and perforrred post source check of all FSS meters used. All meters passed post source check successfully.
END SDJ/JAIVNJJ/ALS SDJ/JA}INJJ/ALS Qualrty Record Westinghouse Non-Proprietary Class 3 FSS Field Log _ of _
Revision:2 LSA-IO Page Pl of 2 HDP-PR-FSS-701, Final Status Suney PIan Development APPENDIX P.6 FSS T'IELD LOG Suney Area:
Suney Unit:
06&10
==
Description:==
==
Description:==
Section 06 & l0 Burial Pit Open Land Area FSS Field Loe:
Date/Time: 9bservation or Comment:
I l/15/13 0630 Received our daily FSS and safety briefing.
llll5ll3 0710 Performed daily instrument source checks for the 2221 meterc AA, DD and FF and2360 meters B and D. All FSS meters successfully passed the source check.
llll1/13 0730 A. Schooley and S. Jenkins entered LSA 10-10 to pull Pre-FSS/RASS Biased and systematic samples.
I l/15/13 0815 N. Jordan, J. Hoffinan, verified that the isolation and control measure wene in place and continued FSS walkovers in LSA 10-06. During the GWS, GPS data files LSA_1006_I I l5l3_AA & LSA_1006_1115l3_DD were created.
No anomalous readings were noted during the walkovers.
See surveys 4369 C 13 I 1 15 & 4382 C 13 I I 15 for more detailed information.
I l/15/13 1300 N. Jordan and J. Hoffinan entered LSA 10-06 to survey the base and sidewalls of the small VOC pit in the northern section of the LSA. During the GWS, the GPS data file LSA_1006_I I ISI3_DD_HOLE was created. No anomalous readings were noted duringthe walkover.
See survey 4368 C 131 I l5 for more detailed information.
llll1ll3 1530 Completed soil sampling for the day in LSA l0-10. The following samples were Completed and secured.
Sample ID Biased 7214-RA-l3l1 14-09-01 7214-RA-131I 14-09-03 Systematic 7213-RA-l3l I l4-09-04 7213-RA-l3t I 14-09-05 See survey 4341 C 13l I 15 for more detailed information.
Technician SJA.IJ/AS/JH FSS FieldLoglof_
Revision:2 LSA.IO Page P2 of2 HDP-PR-FSS-701, Final Status Suney PIan Development APPENDIX P{
FSS FIELD LOG Suney Area:
Suney Unit:
06&10
==
Description:==
==
Description:==
Section 06 & l0 Burial Pit Open Land Area FSS Fipld l,oe:
Date/Time: Observation or Comment:
Technician llll5ll3 1610 Returned to the office to download GWS data and complete survey documentation. SJNJ/JIVAS llll5ll3 1630 Post<hecks performed on all FSS meters that were used. All meters passed successfully.
END SJNJ/JI{/AS FSS Field Log2 sg
Revision:2 LSA.lO Page Pl of 2 HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6
[.SS F'IELD LOG Suruey Area:
Survey Unit:
06&r0
==
Description:==
==
Description:==
Section 06 & l0 Burial Pit Open Land Area FSS Field Los:
Date/Time: Observation or Comment:
Technician llllSll3 0630 Received our daily FSS and safety briefing.
SJNJ/AS/IH 1ll18/13 0700 Performed daily instrument source checks for the 2221 meters AA, DD and FF and 2360 meters B and D. All FSS meters successfully passed the source check.
llllS/13 0715 A. Schooley and S. Jenkins and N. Jordan entercd LSA 10-10 to continue the soil sampling efforts for Pre-FSS/RASS Biased and systematic samples.
I l/18/13 0815 J. Hoffinan, verified that the isolation and control measures were in place and continued on the last portion of FSS walkover in LSA 10-06.
11/18/13 I100 J. Hoftnan completed the GWS of LSA 10-06 and rehrmed to the ofFrce to n/18/r3 l ils perform the data download and survey documentation. During the GWS,GPS data files LSA-1006-I I1813_AA was created. No anomalous readings were noted during the walkover.
See surveys 4370 C 13l I l8 for more detailed information.
A. Schooley, S. Jenkins and N. Jordan completed soil sampling within LSA 10-10.
Transferred all samples to the lab for analysis. The following samples were pulled During today.
Sample [D Biased 7214-RA-l3l I l4-09-02 Systematic 7213-RA-l3l I 14-09-01 7213-RA-l3 trt4-09-02 7213-RA-131114-09-03 7213-RA-131114-09-06 See survey 4363 C 13l I l8 for more detailed information.
Received the FSS instruction briefing from M. Bresnahan for LSA 10-07.
r/18/13 1300 Record FSS Field Log I of_
Revision:2 LSA-IO Page P2 of2 IIDP-PR-FSS-701, tr'inal Status Survey Plan Development APPENDIX P{
FSS FIELD LOG
==
Description:==
Burial Pit Open Land Area Sunrey Area:
Suney Unit:
06&10
==
Description:==
Section 06 & 10 FSS X'ield Loe:
Date/Time: Observation or Comment:
l1l18/13 1400 Performed survey documentation and statistical analysis of GWS data.
I l/18/13 1630 Post-checks performed on all FSS meters that were used. All meters passed successfully.
END SJA.IJ/J}VAS Technician SJNJ/JIVAS use Non-
Revision:2 LSA-10 Page Pl ofl HDP-PR-FSS-701, Final Status Survey PIan Development APPENDIX P.6 FSS FIELD LOG Suruey Area:
Survey Unit:
==
Description:==
==
Description:==
Section LSA 10-10 Burial Pit Open Land Area t0 FSS X'ield Loe:
Date/Time:
12102/t3 0630 Observation or Comment:
Received daily safety and FSS briefing.
Technician SJiJ}VAS/NJ l2l02ll3 0715 Performed daily instrument source checks for FSS meters. All meters successfully passed the source check.
l2l02ll3 0915 S. Jenkins, A. Schooley, J. Hoffinan and N. Jordan performed Isolation and Control measures on LSA 10-10. Removed black isolation rope and replaced it with green/white FSS rope and FSS signage. W.apped waddles in plastic and duct tape and installed them in all areas around the LSA that would otherwise allow surface water from adjacent areas to flow into LSA l0-10.
l2l02ll3 16410 Performed post checks on FSS meter. All meters passed successfully.
END SJ/JT{/ASNJ Class 3 FSS Field Log _ of_
Revision:2 LSA-IO Page Pl of I IIDP-PR-['SS-701, Final Status Survey PIan Development APPENDIX P.6 FSS FIELD LOG Suruey Area:
Survey Unit:
Burial Pit Open Land Area Section LSA 10-10 FSS Field Loe:
Date/Time: Obseration or Comment:
l2l04ll3 0630 Received daily safety and FSS briefing.
l2l04ll3 0715 Performed daily instrument source checks for FSS meters. All meters successfully passed the source check.
12/04113 0900 S. Jenkins and A. Schooley verified that isolation and controls were in place in LSA l0-10 and began performing systematic soil sampling of the area.
12104113 1300 N. Jordan entered LSA l0-10 to perform FSS GWS.
12/04/13 1600 S. Jenkins and A. Schooley completed systematic soil sampling in LSA 10-10.
The following samples were taken:
Sample ID Ll0l00lBRS00 Ll0l002BES00 Ll0l003BRS00 L10l004BES00 Lt01005BRS00 Ll0l006BES00 Ll0l007BRs00 Ll01008BES00 Ll0t009BSS00 Lt0l0l0BRS00 Ll0l0l lBSS00 Ll0l0l rBSQ00 Ll0l0l2BRS00 Ll0l0l3BSS00 Ll0l0l4BRS00 Ll0l0r5BES00 See survey 4572 C 131204 for more detailed information.
12104/13 1615 N. Jordan completed FSS GWS in LSA 10-10 for the day.
See surveys 4586 C 131204 & 4587 C 131204 for more detailed information.
Performed post checks on FSS meter. All meters passed successfully.
END SJ/JTVASNJ l0
==
Description:==
==
Description:==
Technician SJ/JTVASNJ r2l04lt3 t630 Class 3 FSS Field Log _ of _
Revision:2 LSA-IO Page Pl of 1 HDP-PR-FSS-701, Final Status Survey Plan Development APPENDIX P.6 FSS FIELD LOG Survey Area:
Survey Unit:
t2l05lt3 t030 t2l05lt3 tt30 t2l0slt3 t600 12t05n31635
==
Description:==
==
Description:==
Section LSA 10-10 Burial Pit Open Land Area t0 FSS Field Los:
Date/Time: Obselvation or Comment:
12105/13 0630 Received daily safety and FSS briefing.
12105/13 0715 Performed daily instmment souree checks for FSS meters. All meters successfully passed the source check.
l2l05lt3 0900 N. Jordan, J. Hoffinan, J. Williams and verified that isolation and controls were in place in LSA l0-10 and began performing GPS based FSS GWS ofthe area.
A. Schooley entered LSA l0-10 to begin conducting manual FSS GWS of portions of the sidewalls where GPS could not be used.
A. Schooley completed a manual GWS of a sidewall area and retumed to the offrce to document the survey.
See survey 4581 C 131205 for more detailed information.
N. Jordan, J. Hoffrnan, J. Williams and A. Schooley completed FSS GWS for the day in LSA 10-10 and returned to the office to document the surveys.
See surveys 4576 C l3 1205, 4577 C 13 1205 and 4590 C l3 1205 for more detailed information.
Performed post checks on FSS meter. All meters passed successfully.
END SJ/JI{/AS/JWATJ Technician SJ/JWAS/JWiNJ Class 3 FSS Field Log _ of _
Revision:2 LSA.IO PagePl of1 HDP-PR-FSS-701, Final Status Suney Plan Development APPENDIX P.6 FSS F'IELD LOG Suney Area:
Survey Unit:
==
Description:==
==
Description:==
Section LSA 10-10 Burial Pit Open Land Area l0 FSS Field Los:
I)atelTime:
12107/13 0630 12107/13 0725 t2l07lt3 0900 t2l07lt3 t030 2t07fi31635 Obseruation or Comment:
Received daily safety and FSS briefing.
Performed daily instrument source checks for FSS meters. All meters successfully passed the source check.
A. Schooley verified that isolation and controls were in place in LSA 10-10 and began performing manual FSS GWS of the area.
A. Schooley completed manual FSS GWS in LSA 10-10 on portions of the sidewalls where GPS could not be used.
See survey 4599 C 131207 for more detailed information.
Performed post checks on FSS meter. All meters passed successfully.