ML17348A262

From kanterella
Jump to navigation Jump to search
Forwards Progress Summary of Select Sys Assessment for Apr 1990,per NRC 860812 order.Outage-related Mods Include Replacement of RHR Valve 887 & Completion of Installation of Redundant Air Start Motors on Emergency Diesel Generators
ML17348A262
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/25/1990
From: Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-179, NUDOCS 9005300097
Download: ML17348A262 (5)


Text

ACCELERATED DI. UTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9005300097 DOC.DATE: 90/05/25 NOTARIZED: NO DOCKET g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HARRIS,K.N. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards progress summary of select sys assessment for Apr 1990.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL OR Submittal: General Distribution SIZE'ITLE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 EDISON,G 5 5 INTERNAL: NRR/DET/ECMB 9H 1 1 NRR/DOEA/OTSB11 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 OC/LFMB 1 0 OGC/HDS2 1 0 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19

P.O. Box14000, Juno Beach, FL 334084420 NAY 2,5 1990 L-90-179 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. CD 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Select S stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the April, 1990 progress summary of the Select System Assessment.

The two remaining actions are scheduled to be completed prior to starting up Unit 4 after the November 1990 Dual Unit Outage. The outage is scheduled to be completed by November 1991. As, discussed with NRC Region II personnel,'further monthly status reports will not be provided until the remaining actions are complete.

Should there be any questions regarding this information, please contact us.

Very truly yours, Harris Vice President Turkey Point Nuclear Plant KNH/JEK/jek Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9005300097 900525 PDR ADOCK 05000250 R PDC an FPL Group company

I

""i%~ i' ~~815

SELECT SYSTEM REVIEW APRIL 1990 STATUS ORIGINAL 15 SYSTEMS MISCELLANEOUS ITEMS Unit 4 Outage Related Modifications RHR 887 Valve Replacement (IS Mod 565) Scheduled completion during the next Unit 4 Refueling Outage.

EDG Redundant Set of Air Start Motors (IS Mod 576)

Scheduled completion to coincide with the Emergency Power System Upgrade Project Outage currently Scheduled to begin November 1990.

I

'V