Documents Written & Verbal Request for Temporary Waiver of Compliance from Tech Spec 3.4.5.b.2 Re Intake Cooling Water Pump 4B Replacement,Based on 900513 Reduction of Flow from Pump.Waiver Should Extend Until 900522
ML17348A252
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 05/15/1990
From: Harris K
FLORIDA POWER & LIGHT CO.
To: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
L-90-184, NUDOCS 9005220231
Download: ML17348A252 (4)


Text

ACCELERATED DISTRIBUTION DEMONS~TION SYSTEM I

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSXON NBR:9005220231 DOC.DATE: 90/05/15 NOTARIZED: NO DOCKET FACIL:50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HARRIS,K.N. Florida Power & Light; Co.

RECIP.NAME RECIPIENT AFFILIATION EBNETER,S.D. Region 2, Ofc of the Director written verbal request for temporary waiver of i

SUBJECT:

Documents 6 compliance of Tech Spec 3.4.5.b.2.

DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR TITLE: General I ENCL (50 Dkt) -Insp Rept:/Notice of Violation Response SIZE:

NOTES RECIPIENT COPIES RECXPIENT COPIES ID CODE/NAME LTTR EN CL ID CODE/NAME LTTR E PD2-2 PD 1 EDISON,G 1 INTERNAL: AEOD AEOD/DEIIB AEOD/TPAD DEDRO NRR SHANKMAN,S NRR/DLPQ/LPEB10 NRR/DOEA DIR 11 NRR/DREP/PEPB9 D NRR/DRIS/DIR NRR/DST/DIR SE2 NRR/PMAS/ILRB12 NUDOCS-ABSTRACT OE DI OGC/HDS2 RES/DSR/HFB/HFS RGN2 FILE 01 EXTERNAL: LPDR NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL

P.O. Box14000, Juno Beach, FL 33408.0420 NAY ~519go 9ONAYte A)i 35 L-90-184 Stewart D. Ebneter Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta St , N.W., Suite 2900 Atlanta, GA 30323 Mr. Stewart D. Ebneter:

Re: Turkey Point Unit 4 Docket No. 50-251 4B Intake Cooling Water Pump Replacement Tem orar Waiver of Com liance This letter documents a written and verbal request of Region II personnel for a temporary waiver of compliance of Technical Specification 3.4.5.b.2, and supersedes Florida Power and Light letter L-90-182.

During the evening of May 13, 1990, a Low ICW pressure alarm was received and a reduction of flow from the Unit 4 Intake Cooling Water (ICW) pump was noted. Immediately thereafter the "C" pump was started and the "B" pump was stopped. Pressure and flow returned to normal. During the day on May 14, 1990 various testing was performed on the,."B" pump and an inspection was made of the pump intake by a diver. Subsequent Inservice Tests of the pump still found the "B" pump in the alert range for delta-P.

The decision was made to replace the "B" pump because of the rapid change in flow characteristics. The Unit 4 "B" ICW pump was still considered operable but was taken out of service for the replacement starting at 0122 hours Eastern Daylight Time on May 15, 1990. The amount of time required for the replacement is estimated to be 17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> with 3 to 4 additional hours of post. maintenance testing. It is not anticipated that extra time for the replacement will be required.

Technical Specification 3.4.5.b.2 states the following:

Irb During power operation the requirements of 3.4.5.a.,

above may be modified to allow any one of the following components to be inoperable provided the remaining systems are in continuous operation.

2. One intake cooling water pump may be out of service for a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />."

90052z0~.i 900.1~

I=DR ADOCK 0=0002 l P PDC an FPL Group company i,.- gr i(0

It shouldsupplies power be noted that a 7 day LCO for two pumps with independent is contained ,in the draft Revised Technical Specifications as submitted to the NRC on June 5, 1989.

The Revised Technical Specifications for one ICW pump out of service are as follows:

"3.7.3 ACTION

a. With only two ICW pumps with independent power supplies OPERABLE, restore the inoperable pump to OPERABLE status within 7 days or be. in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />."

The revision allows operation with two operable ICW pumps for 7 days provided they are powered from independent power supplies.

The current Technical Specification allows operation with two ICW pumps for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Turkey Point plant has three 100%

capacity 'ICW pumps, two of these pumps are powered from independent power supplies ("A" ICW pump from the 4A 4160 Volt bus'nd "C" ICW pump from the 4B 4160 Volt. bus) and the .remaining pump ("B") is a standby pump normally powered from the 4B bus. The safety analysis requires one ICW pump to remove design basis heat loads.

Operability of two ICW pumps from independent power supplies provides redundancy and assurance that at least one pump is operable assuming a single failure. The existence of a third pump provides additional assurance of pump availability.

Both operating ICW pumps are normally lined up to the two headers supplying flow to three Component Cooling Water heat exchangers.

Each pump has a design flow of 16,000 gallons per minute which can remove a nominal accident heat load of 120 million BTU/hr with a Intake Canal Water temperature of 95 degrees F. The Unit 4 "A" and "C" ICW pumps meet the acceptance criteria for operability based on the last Inservice Test completed on May 8, 1990.

Due to difficulties which could be encountered during the replacement effort, an extension beyond the presently required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is requested. No further complications are expected.

However, since the pump replacement and post maintenance testing process is complex, an extension to a total Limiting Condition for Operation (LCO) of 7.days is requested. The work effort to replace the pump will continue until completion for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day and completion of the effort is expected prior to the end of the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> LCO. However, consistent with the draft Revised Technical Specifications, if the",B" ICW pump is not returned to an operable status by 0122 hours0.00141 days <br />0.0339 hours <br />2.017196e-4 weeks <br />4.6421e-5 months <br /> on May 22, 1990, Unit 4 will be placed in hot standby within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Based upon the above analysis and the expedited replacement of the "B" ICW pump, the plant will not be placed in a condition that compromises the health and safety of plant personnel or the general public.

Following review by the Plant Nuclear Safety Committee, approval of this document was recommended to the Plant Manager. The Plant Manager subsequently approved this document.

Very truly yours, N

i; Yii Harris K.

Vice President Turkey Point JHG/JEK/jek CC; Document Control Desk, USNRC Dr. G. E. Edison, Project Manager, NRR, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant