ML17348A240

From kanterella
Jump to navigation Jump to search
Forwards Thimble Tube Eddy Current Insp Rept Re NRC Bulletin 88-009, Thimble Tube Thinning in Westinghouse Reactors. Insp Conducted at End of Cycle Xi.One Thimble Required to Be Isolated Until Wear Rate Determined
ML17348A240
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 05/09/1990
From: Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-88-009, IEB-88-9, L-90-163, NUDOCS 9005160081
Download: ML17348A240 (7)


Text

ACCELERATED DI'STRIBUTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM ( RI DS )

ACCESSION NBR: 9005160081 DOC. DATE: 90/05/09 NOTARIZED: NO DOCKET g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 AUTH. NAME AUTHOR AFFILIATION HARRIS,K.N. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards thimble tube eddy current insp rept re NRC Bulletin 88-009.

DISTRIBUTION CODE: IE18D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Bulletin 88-09 Thimble Tube Thinning xn Westinghouse Reac ors NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME PD2-2 LA LTTR ENCL ID CODE/NAME PD2-2 LTTR ENCL 1 0 PD 1 1 EDISON,G 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP 1 1 NRR BUCKLEY,B 1 1 NR O. 1 1 NRR RAMSEY,J 1 1 ~ThE 02 1 1 RGN2 FILE 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WAS CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12

I P.O. Box 14000, Juno Beach, FL 33408.0420 FPL NAY 09 $ 990 L-90-163 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

Turkey Point Unit 3 Docket No. 50-250 IE Bulletin 88-09 Thimble Tube Thinnin in Westin house Reactors Provided as an attachment is the Thimble Tube Eddy Current Inspection Report for Turkey Point Unit 3.

Should there be any questions, please contact me.

Very truly yours,

+il/

K. N. arris Vice President Turkey Point Plant Nuclear KNH/WFK/gp Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9005)600@1 900%0,-

PE

10% 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 25%. 48% 10.4 5.0 N 29% 4.I 31% 23'%3 4.5 12% 1.8'8% 8.8 13% 28% 4.2 2.5 29'%.2 D 19'%.7 15% 25% 3.3 '8.4 LEGEND B X a thimble obstructed ' testedlocatlonwitha Percent Wall loss measurable wall loss s 10% Scar Length in Inches A