Text

ACCELERATED DISHUBUTION DEMONSTjRATION SYSTEM 1 t REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9005010252 DOC.DATE: 90/04/27 NOTARIZED: NO DOCKET FACXL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HARRIS,K.N. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards select sys assessment progress summary for Mar 1990. D DXSTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TXTLE: OR Submittal: General Distribution NOTES:

RECXPIENT COPIES RECIPIENT COPIES A ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR' ENCL PD2-2 LA 1 1 PD2-2 PD 1 EDISON,G 5 5 INTERNAL: NRR/DET/ECMB 9H 1 1 NRR/DOEA/OTSB11 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 S NRR/DST/SICB 7E 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 MB .. 1 0 OGC/HDS2 1 0 REG FIL 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR ,1

'1 1 NRC PDR 1 1 NSIC 1 D

A D

~

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISHUBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19

't 4V ~q C

~

if t 8h 0

1 4

4 b (I

J

0 P.O. Box 14000, Juno Beach, Fl 33408-0420 APR 27 1990 L-90-137 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 1 mA mn Pr r mm r Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the March 1990 progress summary of the Select System Assessment.

Should there be any questions regarding this information, please contact us.

Very truly yours, Hari'is Vice resident Turk y Point Nuclear Plant KNH/TCG/spt Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9005010252 900427 PDR ADOCK 05000250 R PDC an FPL Group company

'1y c

!"))jib y'

SELECT SYSTEM REVIEW MARCH 1990 STATUS ORIGINAL 15 SYSTEMS MISCELLANEOUS ITEMS Unit 3 RHR 887 Valve Replacement IS Mod 519 Completed March 25, 1990.

Unit 4 Outage Related Modifications RHR 887 Valve Replacement (IS Mod 565) Scheduled completion during the next Unit. 4 Refueling Outage EDG Redundant Set of Air Start Motors (IS Mod 576)

Scheduled completion to coincide with the Emergency Power System Upgrade Project Outage currently scheduled to begin in November 1990 ADDITIONAL SYSTEMS ARMS PRMS NCC WALKDOWNS PAID's (IS Mod 1042) Completed March 8, 1990.

PAID Update Since no deficiencies were identified during the walkdown completed March 8, 1990, this activity is considered closed.