ML17348A191

From kanterella
Jump to navigation Jump to search
Informs That Procedures for Supplemental Fracture Toughness Testing Submitted to NRC Via B&W Owners Group 890805 Ltr Which Transmitted BAW-2086, B&W J-R Test Procedure for Wedge Opening Loaded Fracture Toughness Specimens.
ML17348A191
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/16/1990
From: Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-123, NUDOCS 9004240276
Download: ML17348A191 (4)


Text

t ACCELERATED DISTjUBUTION DEMONST$&TION SYSH~

'~r' t

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9004240276 DOC.DATE: 90/04/16 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit. 4, Florida Power and Light C 05000251 AUTH. NAME 'UTHOR AFFILIATION HARRIS,K.N. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Informs that procedures for supplemental fracture toughness testing submitted to NRC by util 890805 ltr.

DISTRIBUTION CODE: BOOID COPIES RECEIVED:LTR Q ENCL Q SIZE:

TITLE: OR Submittal: General Distribution NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 PD2-2 PD EDISON,G 5 INTERNAL: NRR/DET/ECMB 9H NRR/DOEA/OTSB1 1 NRR/DST 8E2 NRR/DST/SELB 8 D NRR/DST/SICB 7E NRR/DST/SRXB 8E

'UDOCS-ABSTRACT OC/LFMB OGC/HDS2 REG ILE RES/DSIR/EIB EXTERNAL: LPDR NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP, US TO REDUCE WASIZI CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL

J", C \ h II a, ~ r 1

('

\

I kH

'I

P.O. Box 14000, Juno Beach, FL 33408-0420 APR >6 ~SSO L-90-123 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Fracture Toughness Requirements NRC TAC Nos. 62760 and 62761 By letter dated October 30, 1987, the Nuclear Regulatory Commission transmitted a Safety Evaluation (SE) of the Florida Power & Light Company (FPL) report, "Reactor Vessel Material Surveillance Program for Turkey Point Unit 3, Analysis of Capsule V". The letter transmitting this SE required that FPL submit a plan for complying with 10 CFR 50, Appendix G, Section V.C requirements. FPL submitted its plan by letter dated May 4, 1988 (letter L-88-207).

That plan was later superseded by letter dated January 31, 1989 (letter L-89-32).

The October 30, 1987 NRC letter also stated that Section III.B of Appendix G requires that the test methods for supplemental fracture toughness tests be submitted to and approved by the Director,-

Office'f Nuclear Reactor Regulation, prior to testing. This requirement was also called to FPL's attention in an NRC letter dated May 25, 1988.

As stated in our January 31, '1989 letter, supplemental fracture toughness testing will be done for the Turkey Point Plant as part of a Babcock & Wilcox Owners Group (BWOG) program. This letter is to inform you that the procedures for doing the testing were submitted to the NRC by BWOG letter OG-539, dated August 5, 1989, which transmitted Babcock & Wilcox Report BAW-2086, "Babcock &

Wilcox J-R Test Procedure for Wedge Opening Loaded (WOL) Fracture Toughness Specimens," June 1989, for approval by the Director, Office of Nuclear Reactor Regulation. This document is currently being reviewed by the NRC Staff.

Should there be any questions regarding this information, please contact us.

Very truly yours, A)g 1

K. Harris Site ice President Turkey Point Nuclear Plant 9004240276 9004i6 PDR ADOCK 05000250 p PDC cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company