Forwards Integrated Schedule Monthly Summary for Oct 1989, Reflecting Info as of Issuance Date of 891015.Until Planning for Emergency Ac Power Enhancements Complete,Util Will Continue to Rept Progress Per May 1989 Schedule
ML17347B490
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/20/1989
From: Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-437, NUDOCS 8912280259
Download: ML17347B490 (8)


Text

ACCELERATED DI UTION DEMON TION SYSTEM

~ ~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8912280259 DOC.DATE: 89/12/20 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HARRIS,K.N. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards integrated schedule monthly summary for Oct 1989, reflecting info as of issuance date of 891015.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 EDISON,G 5 5 INTERNAL: NRR/DET/ECMB 9H 1 1 NRR/DOEA/OTSB11 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 OC B 1 0 OGC/HDS2 1 0 G FILE 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP, US TO REDUCE WASTEl CONTACT THE. DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISHUBUTION LISTS FOR DOCUMENTS YOU DON'T NEED}

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19

P.O. Box14000, Juno Beach, FL 33408-0420 P-F'IL L-89-437 DEC 2 0 $ 989 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Inte rated Schedule Monthl Summar Attached is the Summary Report of the Integrated Schedule generated for the month of October 1989. The schedules discussed in this report reflect information as of the issuance date of October 15, 1989. Updated information will be provided in subsequent reports.

The changes to the schedule discussed in this summary have been reviewed with the NRC Staff in accordance with the Integrated Schedule Plan.

The baseline schedule dates will not be revised in the November Integrated Schedule. Until planning for the emergency A.C. power enhancements is complete and schedules established, FPL will continue to report progress based on the baseline schedule dates in the May 1989 Integrated Schedule. This has been discussed with Gordon Edison, NRC Project Manager for the Turkey Point Plant, and is acceptable to him.

Should there be any questions regarding this information, please contact us.

Very truly yours, K. N. arri Vice resident Turke Point Nuclear Plant KNH/TCG/gp Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point, Plant 8912280259 891220 PDR ADOCK 05000250 R

an FPL Group compan'y PDC J

Jo 1

TURKEY POINT UNITS 3 AND 4 OCTOBER 1989 INTEGRATED SCHEDULE The October 1989 Integrated Schedule (IS) is based on the following refueling and maintenance outage schedules:

OUTAGE DESCRIPTION START FINISH NOTES Unit 3 Cycle 12 Refueling 02/15/90 05/30/90 Unit 3 Diesel Tie-In 01/15/91 06/30/91 Unit 3 Cycle 13 Refueling 01/01/92 04/15/92 Unit 3 Cycle 14 Refueling 10/01/93 12/03/93 Unit 4 Cycle 12 Refueling 01/15/91 06/30/91 Unit 4 Cycle 13 Refueling 10/01/92 12/03/92 Unit 4 Cycle 14 Refueling 04/01/94 06/03/94 1 Based on projections by Turkey Point Management 2 Estimated Changes to the Integrated Schedule since the last issue, September 1989, are summarized as follows:

NRC MODIFICATIONS WITH FORECAST COMPLETION DATES BEYOND THEIR BASELINE SCHEDULE DATES BASELINE MOD NRC NRC DATE UNIT DESCRIPTION CAT SEPT 89 OCT 89 MAY 89 NOTES 792 S CNTRL ROOM LIGHTING NRR 8/15/9 0 8/2 0/9 0 3/24/9 0 EVALUATION 1011 S CNTRL ROOM HFE NRR 7/3/90 7/9/90 2/6/90 ANNUNCIATOR STUDY 1069 3 REACTOR HEAD LIFT RIG NRR 12/3/90 1/15/91 8/5/90 LOAD CELL 1070 4 REACTOR HEAD LIFT RIG NRR 12/5/90 1/15/91 8/5/90 LOAD CELL 1290 C CTL RM OP DESK PHONE NRR 1/16/91 1/22/91 12/4/90 REACH RESOLN 1291 C CONTROL ROOM RELABELING NRR 9/26/90 10/2/90 5/5/90

'4 ll

Page two NRC MODIFICATIONS WITH FORECAST COMPLETION DATES BEYOND THEIR BASELINE SCHEDULE DATES (con't).

BASELINE MOD NRC NRC DATE UNIT DESCRIPTION CAT SEPT 89 OCT 89 MAY 89 NOTES 1292 S CTRL RM DEMARCATION NRR 6/26/90 7/3/90 2/2/90 DOCUMENTATION 1293 3 CTL LD METERS-ADD NRR 10/16/90 10/16/90 5/25/90 UNITS/CHA SCALE 1294 4 CTL LD METERS-ADD NRR 10/16/90 10/16/90 5/25/90 UNITS/CHA SCALE 1297 3 NIS-ELIM. UNUSED NRR 1/14/91 1/14/91 8/18/90 SWITCH POSITIONS 1298 4 NIS-ELIM. UNUSED NRR 1/14/91 1/14/91 8/18/90 SWITCH POSITIONS 1312 S THERMAL STRESS PPG NRR 7/5/91 7/5/91 12/5/89 CONNCTD TO RCS 1325 S PROBABILTY RISK NRR 3/11/91 3/11/91 2/ll/91 ASSESSMNT PROGRAM 610 C EDG START'G AIR SYS/ I&E 8/23/89 9/20/89 6/24/89 ADD AIR DRYER 1056 S PWR LOSS TO VITAL BUS I&E 7/3/90 7/6/90 2/5/90 AT SALEM 2 1110 4 MOV FAIL DUE TO I&E 9/14/89 10/12/89 6/11/89 IMPROPER SW SET'G 1313 3 SMALL BORE PIPING/ I&E 3/13/91 2/13/9 1 12/3/90 NCR DISPOSITION 1314 4 SMALL BORE PIPING/ I&E 3/19/9 1 2/2 0/9 1 12/3/9 0 NCR DISPOSITION 1320 C FLOOD PROT EDG FUEL OIL I&E 2/4/91 2/4/91 5/30/90 XFER PMPS The above status is based on baseline schedule dates established in the May 1989 Integrated Schedule Six-Month Report.

Page three NOTES NOTE 1 Phase I is complete. Unit 3 inspections will be done during the 1990 outage.

I Page three NOTES (con't)

NOTE 2 FPL is working toward completing a PRA by June 1991. The schedule was discussed with the NRC at a meeting on December 6, 1989.

NOTE 3 Partial SATS (System Acceptance Turnover Sheets) have been issued.

NOTE 4 The completion dates have been extended based on current progress, current approved increase in scope and/or engineering resource availability.

NRC COMMITTED MODIFICATIONS ADDED M~OD UNIT DESCRIPTION NRC CAT

-NONE NRC COMMITTED MODIFICATIONS COMPLETED MOD UNIT DESCRIPTION NRC CAT 8966 P4T11.21 U4 SAF ENGR GRP FINAL RPT COFO