ML17347B450

From kanterella
Jump to navigation Jump to search
Forwards Select Sys Assessment Progress Summary for Oct 1989,per 860812 Order
ML17347B450
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/01/1989
From: Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-419, NUDOCS 8912130060
Download: ML17347B450 (5)


Text

ACCELERATED DI UTION DEMONSTR'ION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8912130060 DOC.DATE: 89/12/01 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 @

AUTH. NAME AUTHOR AFFILIATIONS HARRIS,K.N. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards select sys assessment progress summary for Oct 1989.

D DISTRIBUTION CODE: A001D TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution

('NCL I'IZE: cR NOTES RECIPIENT COPIES RECIPIENT COPIES A ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA PD2-2 PD EDISON,G '5' 1 1 1 1 D INTERNAL: NRR/DET/ECMB 9H 1 1 NRR/DOEA/OTSBll 1 '

D NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 OC N 1 0 OGC/HDS2 1 0 LE 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL LPDR 1 1 NRC PDR 1 1 NSIC 1 1 D

S D

D NOTE TO ALL "RIDS" RECIPIENIS:

PLEASE HELP US TO REDUCE WASFEI CONTACT THE.DOCUMENI'ONTROL DESK,'OOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19

'-" II.

0 P

,'P V~%. A, >p gt

~ %

gi) l lg f

P.O. Box14000, Juno Beach, FL 33408-0420 DE~ 811989 L-89-419 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Select S stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the October 1989 progress summary of the Select System Assessment.

Should there be any questions regarding this information, please contact us.

Very truly yours, K. N Harris Vice President Turkey Point Nuclear Plant KNH/TCG/gp Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant S9g2g30060 8+o00250 perl PbR. >DOCK 05 PDC I

'R I (

an FPL Group company

~ rt>>

~

'I q,pg 5

SELECT SYSTEM REVIEW OCTOBER 1989 STATUS ORIGINAL 15 SYSTEMS WALKDOWN AS BUILT RECORDS Breaker List (IS Mod 1265) Scheduled to be completed January 22, 1991 P&ID's (IS Mod 1098) Scheduled to be completed December 29, 1989 CONFIGURATION MANAGEMENT Unit 4 Drawing Follow Up (IS Mod 8968) Completed by October 9, 1989 (120 days following end of the recent Unit 4 Refueling Outage)

MISCELLANEOUS ITEMS Unit 3 RHR 887 Valve Replacement (IS Mod 519) Scheduled completion during the next Unit. 3 Refueling Outage Unit 4 Outage Related Modifications RHR 887 Valve Replacement (IS Mod 565) Scheduled completion deferred until the next Unit 4 Refueling

,Outage EDG Redundant Set of Air Start Motors (IS Mod 576)

Scheduled completion deferred to coincide with the Emergency Power System Upgrade Project Outage currently scheduled to begin in 1991 ADDITIONAL SYSTEMS ARMS PRMS NCC WALKDOWNS P & ID's (IS Mod 1042) Scheduled for completion during next Unit 3 Refueling Outage P & ID Update Schedule to be determined following walkdowns COMPREHENSIVE REVIEW BY SEG Phase II Review completed October 15, 1989