Forwards Estimates of Anticipated Number of Candidates to Examine During Each Site Visit Assigned by Generic Ltr 89-03,dates for Requalification Exams During FY89-FY92 & Best Estimate Date for Planned Simulator Certification
ML17347B315
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/1989
From: Woody C
FLORIDA POWER & LIGHT CO.
To: Perkins K
Office of Nuclear Reactor Regulation
References
GL-89-12, L-89-324, NUDOCS 8909120224
Download: ML17347B315 (6)


Text

p.r t."ELEMTZD D1RIBU'IDION DKMONS+TION SYSI'EM i,,i REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8909120224 DOC.DATE: 89/08/31 NOTARIZED: NO DOCKET N FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251

,AUTH. NAME AUTHOR AFFILIATION WOODY,C.O. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION PERKINS,K.E. Operator Licensing Branch

SUBJECT:

Forwards proposed operator licensing exam schedule format, per GL 89-12.

DISTRIBUTION CODE: M003D COPIES RECEIVED:LTR I ENCL I SIZE:

TITLE: Operator Regualification Program NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL h PD2-2 LA 1 0 PD2-2 PD 1 1 EDISON,G 1 1 INTERNAL: LEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 NRR/DLPQ/HFB 10 1 1 /DLBQ OLB 10 1 1 NUDOCS-ABSTRACT 1 1 REG FILE 1 1 RGN2 1 1 EXTERNAL: LPDR 1 1' NRC PDR 1 1 NSIC 1 R

I

/

h D

D' NAZE K) ALL '.'RIDS" HZCZPIIMS:

PIZ'ASE KKP US 'IO REDUCE %%8TH! CXNZACI! 'IHE DOCX29ÃZ CONSUL DESK, ROC'l-37 (EXT. 20079) KO EIJMQ468 KKR NAME EBEN DISTRIBUTION TOTAL NUMBER OF COPk~EP: BRR  % ENCL 12 y-/

P.O. Box14000, Juno Beach, FL 33408-0420 AUGUST, 5 1 1989 L-89-324 Mr. Kenneth E. Perkins, Jr.

Chief, Operator Licensing Branch OWFN-10D-18 U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Perkins:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 0 erator Licensin Examinations Generic Letter 89-12 As requested by Generic Letter 89-12, attached are estimates of the anticipated number of candidates to examine during each site visit assigned by Generic Letter 89-03, the dates for requalification examinations during Fiscal Years 1989 through 1992, and a best estimate date for planned simulator certification for each site.

Should there be any questions, please contact us.

Very truly yours, C. . Woody Acting Senior Vice President Nuclear COW/JRH/cm Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 89091202 K 05000250 PDR +DOC FDC zo5 V

an FPL Group company

k a'a l>,0ll I 'I

, ~

Enclosure 1 PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORI'iAT Facility NRC Region, II FY 1990 -

.. FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90') (10/1/90-9/30/91) (10/1/91 "9/30/92) (lu/1/92-9/30/93) 1- Assigned Oate (GL 39-03) ~tgO 2 91 2/92 2/93

~

PRO dSRO Instant dSRU Upgrade dSRO Limited

2. Assigned Date (GL 89-03) 8/91 8/92 8/93 PRO 15 15 gSRO Instant~

dSRO Upgrade~

PSRO Limited Please indicate in~tial cold license examinations by placing an asterisk (*) by the date. Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**). (l.or example, if Unit 1 is in operation and Unit 2 is approaching fuel load, and three RO candidates with no previous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit 1 are'o be examined to extend their licenses to Unit 2, then indicate "RO 3,5**.")

Enclosure 2 PROPOSED REgUALIFICATION EXAMINATION SCHEDULE FORMAT Faci 1 i ty NRC Region Planned Simulation Facility Certsfication/Approval Date FY 1990 FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90) (10/1/90 g/3P/gl) (1P/1/gl-g/30/92) (10/1/92-9/30/93)

Date 3-12 90 Date2-25-"91'ate~L91 Da te~~92'" Date~~93

2. Date~~ gp Date~~92 Date~~93
3. Da te~~ gp Date~~gl Date~~ 92 Date~~93
a. Date~~0 Date~~gl Daty a~~ g2 Date~>~93
5. Date~~0 Da te~t~ g 1 Date~p 92 Date~~g3

b

/ \ ~

~pl 4'