Forwards June 1989 Select Sys Assessment Progress Summary, Per NRC 860812 Order
ML17347B191
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/17/1989
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-254, NUDOCS 8907240489
Download: ML17347B191 (5)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8907240489 DOC.DATE: 89/07/17 NOTARIZED: NO DOCKET FACIL:50-250 Turkey'oint Plant,,Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME ., AUTHOR AFFILIATION WOODY,C.O. ..:. Florida Power= & Light Co.,

RECIP.NAME =

RECIPIENT AFHLIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards June 1989 select sys assessment progress summary, P er NRC 860812 order.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE Submittal:. General, Distribution ..

NOTES:

,Op.

h

/

RECIPIENT COPIES RECIPIENT COPIES h ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D

PD2-2 LA 1 1 PD2-2 PD 1 1 EDISON,G 5 5 D

INTERNAL: NRR/DEST/ADS NRR/DEST/ESB 7E 8D 1,1 1"' NRR/DEST/CEB 8H NRR/DEST/ICSB 1

1 1

1 S NRR/DEST/MTB 9H 1, .11" NRR/DEST/RSB 8E 1.. 1 NRR/DOEA/TSB

/ 'h 11 1 1 0

'1 NUDOCS-ABSTRACT OGC/HDS2 1

1( '

': 1 0

h 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 h ~ h h

h S

h D

NOXE K) ALL 'KIDS" &CZPGWIS:

S PURSE HELP US K) REDUCE MSTEl CORGI QK DOQJMEÃZ CONTROL DESK ROC'l-37 (EXT. 20079) TO XZiQGNATB YOUR KLMB PBCH DRHKGSOTIGN LISXS KK DOCUMENXS YOU DON'T NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 20

8~ 1 II ~ y II

P.O. Box14000, Juno Beach, FL 33408-0420 JULY 1 V f98S L-89-254 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Select S stem Assessment Pro ress Summa Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the June 1989 progress summary of the Select System Assessment.

Should there be any questions regarding this information, please contact us.

Very truly yours, C. O. dy Acti enior Vice President Nuclear COW/TCG/gp Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 3907240489 8907i7 PDR WDOCV OS0002SO R PDC an FpL Group company

SELECT SYSTEM REVIEW JUNE 1989 STATUS ORIGINAL 15 SYSTEMS WALKDOWN AS BUILT RECORDS Breaker List (IS Mod 1265) Scheduled to be completed January 1991 P&ID's (IS Mod 1098) Scheduled to be completed December 29, 1989 COMPREHENSIVE REVIEW BY SEG Unit 4 Closeout Report (IS Mod 8966) Scheduled completion August 10, 1989 (60 days following end of the recent Unit 4 Refueling Outage)

CONFIGURATION MANAGEMENT Unit 4 Drawing Follow Up (IS Mod 8968) Scheduled completion October 9, 1989 (120 days following end of the recent Unit 4 Refueling Outage)

MISCELLANEOUS ITEMS Unit 3 RHR 887 Valve Replacement (IS Mod 519) Scheduled completion during the next Unit 3 Refueling Outage Unit 4 Outage Related Modifications RHR 887 Valve Replacement (IS Mod 565) Scheduled completion deferred until the next Unit 4 Refueling Outage EDG Redundant Set of Air Start Motors (IS Mod 576)

Scheduled completion deferred to coincide with the Emergency Power System Upgrade Project Outage currently scheduled to begin in 1991

SELECT SYSTEM REVIEW JUNE 1989 STATUS Page two ADDITIONAL SYSTEMS ARMS PRMS NCC WALKDOWNS P 6 ID's (IS Mod 1042) Scheduled for completion during next Unit 3 Refueling Outage P 6 ID Update Schedule to be determined following walkdowns COMPREHENSIVE REVIEW BYSEC Phase t

II Review

'f scheduled for completion by October 15, 1989