ML17347B170

From kanterella
Jump to navigation Jump to search
Provides Status of Remaining Performance Enhancement Program Activities,Per NRC 860812 Confirmatory Order.Comprehensive QA Closeout of Program Completed W/One of Nine Findings Open & Scheduled for Completion by Oct 1990
ML17347B170
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/07/1989
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-233, NUDOCS 8907130246
Download: ML17347B170 (3)


Text

CELERATED t

D1PIR18UT105 DEMOJi~TR<TJO t

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8907130246 DOC.DATE: 89/07/07 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME ' AUTHOR AFFILIATION WOODY,C.O. -

Florida Power &,Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Discusses plant performance enhancement program.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ~ ENCL 0 SIZE: I TITLE: OR Submittal: General Distribution aa 'Q ~'l I a

.a a NOTES ll I Ih '

RECIPIENT COPIES RECIPIENT COPIES h ID CODE/NAME LTTR E CL ID CODE/NAME LTTR ENCL PD2-2 LA 1 PD2-2 PD EDISON,G 5 INTERNAL: NRR/DEST/ADS 7E 1 NRR/DEST/CEB 8H 1 D NRR/DEST/ESB 8P 1 NRR/DEST/ICSB 1 NRR/DEST/MTB 9H 1 NRR/DEST/RSB 8E 1 S NRR/DOEA/TSB 11 1 NUDOCS-ABSTRACT 1 OC B 1 OGC/HDS2 1 REG FIL~ 4 01 1 RE'S/DSIR/EIB 1 EXTERNAL'PDR NRC PDR NSIC a

II R

I D

S h

NOIE 'IO ALL RIDS" R1KXPQWIS:

PLEASE HELP US K) REDUCE lGLPZE! CCWZACZ 'IHE DOQ3MEÃZ CCNZROL DESK RXN P1-37 (EXT. 20079) XO EKiXMIMTE YOUR MNE HKH DISTRIBUTION IZSTS MR DOCUMENXS YOU DON'T NEEDf TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL cFG

~ I

~~

P.O. Box14000, Juno Beach, FL 33408-0420 JULY 7 1989 L-89-233 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Turke Point Performance Enhancement Pro ram PEP The Turkey Point Performance Enhancement Program (PEP) is the subject of an NRC Confirmatory Order dated August 12, 1986. The following provides the status of the remaining PEP activities.

1. The Comprehensive Quality Assurance (QA) closeout audit of PEP has been completed. One of the nine findings remains open.

The finding, six shift vs. five shift operation, is currently scheduled to be closed by October 1990. The finding related to drawing update, open at the last report, was closed on June 29( 1989.

2. The remaining PEP tasks are included in the Turkey Point Integrated Schedule (IS) or are as reported within the Select System Assessment Progress Summary report forwarded to you June 23, 1989 (FPL L-89-216).

Should there be any questions about this information, please contact us.

Very truly yours, C. O. Woody Acting Senior Vice President Nuclear COW/DRP/gp cc: Stewart Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant S907130246 S90707 PDR ADOCK 05000250 P PDC an FPL Group company