I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ESSION NBR:8906300216 DOC.DATE: 89/06/26 NOTARIZED: NO DOCKET CIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C '5000250.

Turkey'oint Plant,, Unit 4, Florida Power and Light C 05000251 '0-'251 AUTH. NAME AUTHOR AFFILIATION WOODY,C.O. Florida Power & Light Co.

RECZP.NAME RECIPIENT AFFILIATION R Document Control Branch (Document Control Desk) ltr re violations noted in Insp Repts I

SUBJECT:

Responds to NRC 890626 50-250/89-18 6 50-251/89-18. D DISTRIBUTION CODE: IEOID TITLE: General (50 COPIES RECEIVED:LTR Dkt)-Insp Rept/Notice of Violation ENCL 2 SIZE:

Response S f

NOTES:

RECIPIENT "

COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 EDISON,G 1

  • 1 INTERNAL AEOD 1 1 AEOD/DEIIB 1 1 AEOD/TPAD 1 1 DEDRO 1 1 NRR SHANKMAN,S 1 1 NRR/DEST DIR 1 1 NRR/DLPQ/PEB 1 1 NRR/DOEA DZR 11 1 1 NRR/DREP/EPB 10 1 1 NRR/DREP/RPB 10 2 2 NRR/PMAS/ILRB12 1 1 NUDOCS-ABSTRACT 1 1 OE LIEBERMAN,J 1 1 OGC/HDS2 1 1 NATE~ 02 1 1 RES MORISSEAU,D 1 1

~

RGN2 FILE 01 1 1 RNAL: .LPDR

~ 1 1 NRC PDR 1 1 NSIC 1 1 D

S NOIR 'IO ALL RIDS" RZCZFGMS:

,S PURSE HELP US T0 REDUCE HASTE) CXNZACI'IHE DOCX3NEÃZ CONZROL DESK RXH Pl-37 (EXT. 20079) KO ELBGHREB KKR NAME HEN DISHGEUTICN LXSTS FOR DOCQKHIS VK DON'T NEED)

OTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 23

P.O. Box14000, Juno Beach, FL 33408 0420 50gg 2 6 1989 L-89-228 10 CFR 2 '01 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Reply to Notice of Viola'tion Ins ection Re ort 89-18 Florida Power Ij'ight Company (FPL) has reviewed the subject 1

~

inspection report and pursuant to 10 CFR 2.201 the response is

~

attached. ~

Very truly yours, C. O. W y Acting~Se or Vice President Nuclear COW/JRH/cm Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant

ATTACHMENT 1 REPLY TO NOTICE OF VIOLATION NRC INSPECTION REPORT NOS. 50-250/89-18 and 50-251/89-18 FINDING T.S. 6.8.1 requires written procedures be established., implemented and maintained that meet or exceed the requirements and recommendations of Section 5.3 of ANSI N18.7-1972. Section 5.3 of ANSI N18.7-1972 requires nuclear power plants be operated in accordance with written procedures.-

Procedure 4-0NOP-049, Re-energizing Safeguards Racks After Loss of Single Power Supply, provides instructio'ns for re-energizing safeguards racks without initiating an inadvertent safeguards actuation.

Contrary to the above, on April 12, 1989, without following 4-0NOP-049, a licensed operator installed fuses in a safeguards rack, resulting in re-energization of the rack and an inadvertent actuation of Train A of safeguards.

RESPONSE

1) FPL concurs with the finding.
2) The reason for this event is inadequate administrative controls for this activity. The operator did not recognize the need to use procedure 4-ONOP-049 to install these fuses because the standard clearance for this activity did not specify its use, nor was there any warning specifying its use in the Safeguards racks.
3) a) Warning signs were posted in the Safeguards racks of both unit's.

These signs state that installing fuses FU4 or FU3 may result in a Safety Injection signal being generated, and to use procedure 3/4-ONOP-049 to install either fuse .

b) Warning signs were placed at the power supply breakers to the Safeguards logic for both trains in both units . These signs were placed because the closing of the power supply breaker to the Safeguards logic can also result in a Safety Injection signal being generated .

4) The standard clearances for this activity in the Plant Clearance Order Network (PCON) have been revised . PCON is a computer system used to assist in the initiation, control, and maintenance of clearances .

These standard clearances were revised to include the instruction that procedure 3/4-ONOP-049 be used when releasing these clearances .

5) The corrective actions described above were completed on or before

April 28, 1989.