Provides Current Status of Review of Current Stock of Matls & Requests Termination of Project.Plant Mgt Initiated Comprehensive Effort to Improve Spare Parts Support to Plant Maint Depts
ML17347B071
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/29/1989
From: Conway W
FLORIDA POWER & LIGHT CO.
To: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
L-89-127, NUDOCS 8904170156
Download: ML17347B071 (3)


Text

gc C<LERATZD 2 BUTI ON DEMONSTRATION SYSTEM REGULAT INFORMATION DISTRIBUTIO1ISTEM (RIDE)

ACCESSION NBR:8904170156 DOC.DATE: 89/03/29, NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION EBNETER,S.D. Region 2, Ofc of the Director

SUBJECT:

Provides current status 'of review of current stock of matls

&= requests termination of projects DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ( ENCL General (50 Dkt)-Insp Rept/Notice of Violation Response D SIZE:

0L'ITLE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME

'D CODE/NAME LTTR ENCL LTTR ENCL PD2-2 PD 1 1 EDISON,G 1 1 INTERNAL: AEOD 1 1 AEOD/DEIIB 1 . 1 DEDRO 1 1 NRR SHANKMANFS 1 1 NRR/DEST DIR 1 1 NRR/DLPQ/PEB 11 1 1 NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 NRR/DRIS DIR 9A 1

1 1

1 1

1 NRR/DOEA DIR 11 NRR/DREP/RPB 10 NRR/PMAS/ZLRB12 2,21-1 1

1 NUDOCS-ABSTRACT 1, 1 OE LIEBERMAN,J 1 1 OGC/HDS2 1 RE~TL 02 1 1 RGN2 FILE 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOIR 'IO ALL "RICG" KXIPIEÃIS'LEASE HELP US IO REDUCE HASTE! CGNI'ACT 'IHE DOQ3NERI'CÃIBOL DESK RDCN Pl-37 (EXT. 20079) XO ELIMINATE YOUR NAME PKH DISTRZBVPIQN LIP% FOR DOCQGRIS YOU DON'T NEED)

TOTAL NUMBER OF COPIES- REQUIRED: LTTR 23 ENCL 23

P.O, Box14000, Juno Beach, FL 33408.0420 MARCH 2 9 1989 L-89-127 Mr. Stewart D. Ebneter Regional Administrator Region II U. S. Nuclear Regulatory Commission 101 Marietta St., N.W., Suite 2900 Atlanta, GA 30323

Dear Mr. Ebneter:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-,251 Performance Enhancement Pro'ect 4 Task 24 The Performance Enhancement. Project (PEP) for Turkey Point Units 3 and 4 is the subject of a NRC Confirmatory Order dated August 12, 1986. One of the few remaining tasks under PEP is Project 9, Task 24I Subtask 3, "Review Current Stock of Materials." This task was added to the PEP Program following discussions with members of the NRC Region II Staff by our letter, L-86-42, dated January 31, 1986.

The original schedule was later changed in our letter, L-87-.256, dated June 18; 1987 due to a major increase in the scope of the project. directed by FPL management. The purpose of,this task was to ensure that the spare parts inventory met applicable technical and quality requirements.

The purpose of this letter is to provide the current status of the review and to request termination of the project.

The original scope of the project, as defined in January 1986, was to include the review of approximately 15,000 line items. To date over 25,000 items have been reviewed. This total represents 77%

of the current consolidated inventory.

There are currently controls in place to ensure that unreviewed items are reviewed in accordance with the PEP -project criteria prior to reordering. In addition, prior to installation, the unreviewed material must be reviewed by plant Quality- Control for use in a Quality/Safety related .application.

8904i70i56 PDOCK 85000250 PDR P P

a ~ FPi h~vu, n

Mr. Stewart D. Ebneter L-89-127 Page two As you are I

aware, the plant management has initiated, a comprehensive effort to improve spare parts support to the plant maintenance departments'. .

Plant management has identified the priority areas for improvement and the review team performing the PEP project will play a key role in accomplishing spare parts improvements. Because these improvements are so necessary to improve the overall maintenance position at the plant, we request that these tasks take priority over the closeout of the rest of the expanded scope of the PEP task.

Should you have any questions on our request, please contact us.

Very truly yours,

<if'.

F onway Seni r Vice President Nuclear WFC/PLP/gp cc: Document Control Desk, USNRC