Responds to NRC 850730 Ltr Re Violations Noted in Insp Repts 50-250/85-09 & 50-251/85-09.Corrective Actions:Description of Existing Fastener Thread Engagement Insp Plan Encl. Results Will Be Submitted by 851122
ML17346B131
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/21/1985
From: Williams J
FLORIDA POWER & LIGHT CO.
To: Jacqwan Walker
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
L-85-318, NUDOCS 8509040060
Download: ML17346B131 (4)


Text

P.O. BOX 029100 MIAMI,FL33102 85'>c<6 nlo: Oq FLORIDA POWER & LIGHT COMPANY gg P 1 1985 L-85-318 Roger, D, iValker, Director Division of Reactor Projects U. S. Nuclear Regulatory Commission 101 Marietta Street iV.W.

Suite 2900 Atlanta, Georgia 30323

Dear iVir. Walker:

Re: Turkey Point Units 3 and 0 Docket Nos. 50-250 an 51 Ins ection Re ort 250 85-0 and 251-85-09 Attached please find a description of our existing fasteners thread engagement inspection plan for Turkey Point 3 and 0. A summary of the results of the inspection and any further actions required will be provided to you by November 22i 1985.

This information is forwarded to you as a supplemental response as noted in your letter of 3uly 30, 1985.

Very truly yours,

3. IIV. Williams, 3r.

Group Vice President Nuclear Energy Department 3WW/SAV:dkw Attachment cc: Dr. 3. Nelson Grace Harold F. Reis, Esquire PNS-LI-85-291 850'F040060 85082i I PDR ADOCK 05000250 1 6

PDR,'EOPLE...

SERVING PEOPLE

'I 4

n

DESCRIPTION OF THE EXISTING FASTENERS THREAD ENGAGEMENT INSPECTION PLAN FOR TURKEY POINT 3 and 0 Turkey Point Units 3 and 0 existing fasteners thread engagements inspection plan will consist of visual inspections of accessible pressure boundary bolting in the following systems:

Main Steam

. Main Feedwater Steam Generator Blowdown Auxilary Feedwater Chemical and Volume Control Component Cooling Water Intake Cooling Water Residual Heat Removal A team with members from FPL Engineering, Turkey Point Technical Staff and FPL Backfit Construction Quality Control (Q.C.) will conduct a plant walkthrough to identify specific fasteners to be inspected by Backfit Construction Q.C.

The team will instruct Q.C. to inspect specific pressure boundary bolting including, valve bolting, piping (bolted joints), pump bolting and pressure vessel bolting. The total number of bolts inspected will be determined by the team based on the plant walkdown.

Bolting which is accessible will be inspected. Bolting covered by insulation, within containment or otherwise inaccessable will not be inspected as part of this inspection. Bolting within containment, for Unit 3, was inspected during the Unit 3, 1985 refueling outage as part of the Inservice Inspection (ISI) program.

Results of the inspection will be available in the ISI summary report to be forwarded to NRC by October 17, 1985. The Unit-0 ISI is scheduled for the upcoming refueling outage (3anuary, 1986).

FPL expects to complete the inspection by October 31, 1985. We will evaluate the results of the inspection and will forward a summary of the results and a determination of our followup action plans (if required) to NRC by November 22, 1985.