Provides Supplemental Response to NRC Bulletin 88-004 Re Potential safety-related Pump Loss
ML17345A500
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/01/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
IEB-88-004, IEB-88-4, L-88-475, NUDOCS 8811080017
Download: ML17345A500 (4)


Text

ZCCZXZWTED D BUTION BZVO~S~ZOZ SV rrZZ

~ "f REGULA . Y INFORMATION DISTRIBUTI~SYSTEM (RIDS)

ACCESS'ION NBR:8811080017 DOC.DATE: 88/ll/01 NOTARIZED: NO DOCKET FACIL':50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides supplemental response to NRC Bulletin 88-004 re R potential safety-related pump loss.

I DISTRIBUTION CODE: A001D COPIES RECE1VED:LTR / ENCL TITLE: OR Submittal: General Distribution SIZE: /

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA PD2-2 PD EDISONgG INTERNAL: ARM/DAF/LFMB NRR/DEST/ADS 7E NRR/DEST/CEB 8H NRR/DEST/ESB 8D NRR/DEST/MTB 9H NRR/DEST/RSB 8E NRR/DOEA/TSB 11 NRR/PMAS/ILRB12 NUDOCS- S RACT OGC/HDS2 FILE RES/DSIR/EIB EXTERNAL: LPDR NRC PDR NSIC TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL Y'

v JOX 14000, JUNO BEACH, FL 33408-0420

@Vklh~

>ri ~~~

g0VEMBER 1 "988 L-88-475 U. S. Nuclear Regulatory Commission Attn: Document Control'esk Washington, D.C. 20555 Gentlemen:

Re: Turkey Point Unit: Nos. 3 and 4 Docket Nos. 50-250 and 50-251 Supplemental Response to NRC Bulletin Potential Safet -Related Pum Loss Florida Power 6 Light letter L-88-295 dated July 18, 1988 provided a partial response to NRC Bulletin 88-4 "Potential Safety-Related Pump Loss for Turkey Point". To complete the remaining portion of 'this bulletin, the results of hydraulic instability calculations are required from the individual safety-related pump manufacturers. Due to numerous requests for similar information from other utilities, the responses from the pump manufacturers originally requested for September 1, 1988, have been delayed. It is anticipated that FPL will receive the results of these calculations and the corresponding miniflow recirculation requirements by April 1, 1989. FPL will then develop a plan and schedule for the resolution of any concerns within 30 days of receipt of the miniflow recirculation requirements. The results and schedule for resolution of any hydraulic instability concerns will be provided by May 29, 1989.

If you have any questions or comments, please contact us.

Very truly yours, W. F. way Senio V'ce President - Nuclear WFC/SDF/j r cc: Malcolm L. Ernst, Acting Regional Administrator, Region IZ, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant pp(