Responds to Generic Ltr 88-03, Resolution of Generic Safety Issue 93, 'Steam Binding of Auxiliary Feedwater Pumps.' Procedural Controls Will Be Identified in Plant Procedures as NRC Commitments,To Ensure That Controls Maintained
ML17345A185
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/24/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
REF-GTECI-093, REF-GTECI-NI, TASK-093, TASK-93, TASK-OR GL-88-03, GL-88-3, IEB-85-001, IEB-85-1, L-88-237, NUDOCS 8806010116
Download: ML17345A185 (8)


Text

A.CCELERATED DIAIBUTION DEMONSTJOHON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8806010116 DOC.DATE: 88/05/24 NOTARIZED: YES DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to Generic Ltr 88-03, >>Resolution of Generic Safety Issue 93,Steam Binding of Auxiliary Feedwater Pumps."

DISTRIBUTION CODE A063D COPIES RECEIVED:LTR ENCL SIZE: I Pum NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME ENCL

'TTR PD2-2 LA 1 0 ' PD2-2 PD 1 1 EDISON,G 1 1 A INTERNAL: ARM/DAF/LFMB 0 NRR OLSHAN, L 1 1 NRR/DEST/PSB 8D 1 1 NRR/DEST/RSB 8E 1 1 NRR/DOEA 11-E-4 1 1 NRR/PMAS/ILRB12 1 1 OC B TRACT 1 1 OGC 15-B-18 1 0 D EG FII 01 1 1 II 8

EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 Q

8 A

D TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 12

f

<'k ,I K

P. BOX 14000, JUNO BEACH, FL 33408.0420

@Alf/y~

4e~i>~

IMG 24 3988 L-88-237 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Generic Letter 88-03 Generic Letter 88-03, Resolution of Generic Safety Issue 93, Steam Binding of Auxiliary Feedwater Pumps," issued by the NRC on February 1, 1985, informed licensees of the resolution of Generic Safety Issue 93, and requested that licensees continue to implement as a minimum, the monitoring and c'orrective procedures previously identified for interim resolution of this issue in IE Bulletin 85-01, "Steam Binding of Auxiliary Feedwater Pumps," dated October 29, 1985.

The procedural controls discussed in our response to IE Bulletin 85-01 (FPL letter L-86-77 dated February 28, 1986) remain in place. To ensure the controls are maintained, they will be identified in plant procedures as NRC commitments.

A list of the procedures which include the controls is attached.

Should there be any questions, please contact us.

Very truly yours, W. . Conw Senior Vic President Nuclear WFC/TCG/gp Attachment cc: Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant TCG88-03.GL SS06010116 SS0524 PDR ADOCK 05000250 9 DCD an FPL Group company

p 1%

<<h

STATE OF FLORIDA )

) ss.

COUNTY OF PALM BEACH )

W. F. Conwa being first duly sworn, deposes and says:

That he is Senior Vice President Nuclear, of Florida Power and Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.

W. F ~ Co y Subscribed and sworn to before me this day of NOTARY PUBLIC, in and for the County of

.,Palm Beach,

,"'A7Y'j State of Florida Notary Public, State of Fforrda Qy t.ommission Expires June 1, 19S9 My COmmiSSiOn eXpireS aondodlbrurroybrn-r<..

r -~

I iCy P

~ ,~ ,1 ') )w ~ W ~

~/-~,1 Cl y K A k 1

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Generic Letter 88-03 ATTACHMENT Procedure No. Title 3-0SP-075.1 Auxiliary Feedwater Train 1 Operability Verification 4-OSP-075 ' Auxiliary Feedwater Train 1 Operability Verification 3-OSP-075.2 Auxiliary Feedwater Train 2 Operability Verification 4-0SP-075.2 Auxiliary Feedwater Train 2 Operability Verification 3-0SP-201.3* NPO Daily Logs

  • For both units

1