ML17341A551

From kanterella
Jump to navigation Jump to search
Discusses Actions Taken While Work Continues W/Westinghouse Owners Group Re Emergency Procedures & Training for Station Blackout Events,Per NRC 810826 Ltr.Training Rept Issued to Licensed Operators Describing Alternative Ac Power Sources
ML17341A551
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/21/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-81-412, NUDOCS 8109280234
Download: ML17341A551 (6)


Text

REGULAiT Y INFORMA>>TION DISTRIIBUT1ION'YSTE>>4{ (RIDS)

ACCESSIO'1{< NBR s 810928025% DOC ~ DAiTE{: 81/09/21 NOTAR'I2ED NO 00 FACILCSO 250 Turkey Point Pl anti, Unit 3R, Florida Power and Lig>It Cr 0 50'-251 Tur key Point Plant8, Unit~ ((P, Florida Power>> and Lignt C< 05000251 AUTH~,NAME{ AUTHOR AFFIL'I'ArTiION UHR I G P'R ~ KI . Florida Power L Light- Co~

RECIP ~ NAMK{, RECXPZENT>> AFF ILIAD'ION K{ISENHUT~gD"OG, 'Division of Licensing SUBJKC{l:= Discusses actions taken>> while>> work continues w/iNestinghouse~

owners. gpoup: r e{ etoergehcy proce'dures>> L tr ain4ng fort station>>

sleekeut. ee ent SPIer NRC'10828' tr. Tr e>>ning rept'Seuerr(te 1 icensedr oper ators describing al tebnative" ac powe} soul ces".'

DESTRISUTIION CODEs: A0018 COPIES RECEEVED:L11R TKTLE{:0 General Distribution>> for I af teri Issuance>>

"ENCLI Q SIZEt::

of Opet ating, LH censa),

NOTES REC IPXKNT{ COPIES RECIPIENT COPIES IO'ODE/NAMEI LiTTR ENCL< ID>> L{T)TR~ ENCL{

A'CT{ION;: ORB{ O1, BC{ 0(( 1$ >> 1 CODE/NAME'tIR"g INTERNALC D/DKRt'P HUM{ FACD8 1 DI,V" OF L IC I BE{ 06>> 2 It OELD~

BR 1 RAD AS v{T'R t

01>>

EXTERNALS ACRS 09'2!

1b' LPDR 03 NRC{ PDR{ 1 NSIC(

NT'I S 1 1.

05'O{1'AL NUMBER>> OF COPIES'EQUIRED:'LiTTR 41<<ENCL(

'<<, I f<<

Fa I ~ 1 ~

<<<< I <<I, h > j~f ~

r li t jr r I/r<<a

<<I <<1 q<<a g =I/a/F lr'l a P( 1 Ir r= Ia r 1 <<

4 P.O. BOX 529i00 MIAMI,FL 33152 grill/g~

FLORIDA POWER & L GHT COMPANY September 21, 1981 L-81-412 Office of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Eisenhut:

Re: Turkey Point Units 3 8 4 Docket Nos. 50-250 8 50-251 Emergency Procedures and Training For Station Blackout Events Florida Power 8 Light has reviewed the NRC letter dated August 26, 1981 concerning Station Blackout. We are continuing to work with the Westinghouse Owner's Group regarding preparation of emergency procedures and training for station blackout events.

While this work is underway, however, we will take additional actions at Turkey Point to address this issue. We have issued a training report to all licensed operators which describes the availability of alternative AC power sources on the site. These sources can be used to supply vital loads in the event of the loss of all normal AC power sources. The training report covers the following items:

1. systems which are lost due to station blackout,
2. prompt operator actions which are required,
3. availability and'apacity of alternative power sources,
4. general method for connecting alternative power supplies.

In addition to the issuance of the training report, a lecture segment on Plant Blackout will be presented to each operating shift during the six week requalification cycle which is scheduled to begin September 28, 1981. This lecture segment will familiarize the operator with the actions required in the event of a station blackout including necessary pal breaker lineups. 5

(/

Si09280230 8i092i PDR ADOCK 05000250

.F .P.DR PEOPLE... SERVING PEOPLE

('f

~

4 J

gF'v(,,

'1 t

j I v \ I 4 A wa i s'i)I ~ O'IA << ~ >jN )

1 1

Mr. Darrell G.

Page 2 Eise, Director It is our opinion that because of the availability of these alterna ive power sources at Turkey Point, the above actions are sufficient unti our actions in conjunction with the Westinghouse Owner's Group are completed in January 1982. By refraini ng from making actual pr ocedur changes for the short period until the Owners'roup work is done, we'~

will also minimize the chance for operator confusion which could resul'rom consecutive procedure changes.

truly yours,

~~

Very pp P

Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/PLP/ras cc: Mr. J. P. O'Reilly, Region II Harold F. Reis, Esquire