Responds to NRC 810617 Ltr Re Violations Noted in IE Insp Repts 50-250/81-13 & 50-251/81-13.Corrective Actions:Work Site Cleaned.No Proprietary Info
ML17341A485
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/17/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17341A484 List:
References
L-81-300, NUDOCS 8109010474
Download: ML17341A485 (6)


Text

P.O. BOX 529100 MIAMI,FL 33152 ygUlg~~

USNRC REGlON:.'TLANTA.

OEOi79tf< AlAA FLORIOA POWER & LIGHT COMPANY July 17, 1981 L-81-300 Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re: Turkey Point Units 3 8 4 Docket No. 50-250, 50-251 IE Ins ection Re ort 81-13 Florida Power 5 Light Company has reviewed the subject inspection report and a response is attached.

There is no proprietary information in the report.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/PLP/ras cc: Harold F. Reis, Esquire PDR'EOPLE...

Sf09010474 Bi0814 PDR ADOCK 05000250. g 6

SERVING PEOPLE

~ ~ ~ ~

4$ , ~

()

II

'l I

~l

I

~ f cf Re: Turkey Point Units 3 and 4 Docket Nos. 50-250, 50-251 IE Ins ection Re ort 81-13 FINDING:

Technical Specification 6.8.1 requires implementation of written procedures and administrative policies that meet or exceed the requirement and recommendations of section 5.1 of ANSI 18.7-1972 and USNRC Regulatory Guide 1.33. Administrative Procedure 0103.11, Housekeeping, requires that foll owing maintenance under their cognizance, a supervisor or foreman will verify that the work site is clean and that all trash and debris has been removed from the ar ea.

Contrary to the above during facility tours of units 3 and 4 this inspection period, it was noted that maintenance supervisors failed to implement existing procedures to verify post maintenance cleaniness in that:

1. Debris consisting of several pieces of a replaced waste Gas Compressor were left on the floor of the Auxiliary Building hallway at the four foot elevation for several months after completion of the replacement compressor installation (December 1980 - April 1981), and
2. The defective valve 4-895L and an attached length of contaminated tygon tubing were left on the floor of the Unit 4 spray pump room for several months after the replacement of the valve (Nay 1980 - April 1981).

RESPONSE

(1-1) FPL concurs with the finding.

(1-2) The reasons for this finding is that the procedure was not fully complied with.

(1-3) As corrective action, the areas were cleaned.

(1-4) As corrective action taken to avoid further problems, mechanical mai ntenance supervisors and foreman were reinstructed in the requirements of Administrative Procedure 0103.11, Housekeeping.

(1-5) Full compliance was achieved on July 15, 1981.

Li

,l E

f I

STATE OF FLORXDA )

) ss COUNTY OF DADE )

Robert E. Uhrig, being first duly suborn, Qeposes and says:

That he is a Vice President of Florida Power & Light Company, the Lic nsee herein; That he has executed the foregoing'ocument; that the'tate-ments made in this said document are true anQ correct to the best of his knowledge, information, anQ belief, and that he is authorized to execute the document on behalf of said Licensee.

Robert E. Uhrig Subscribed and sworn to before me this

/7 day of 19 g/

'. NOTARY PUBLIC,

-State of Florida i and for the county of Dade,

~ 'Ny commission expires:

r '

'J J,