ML17340A285

From kanterella
Jump to navigation Jump to search
Forwards Info Re Inservice Insp Program in Response to NRC 800414 Ltr
ML17340A285
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 10/15/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-80-341, NUDOCS 8010200454
Download: ML17340A285 (6)


Text

REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR '80 1 0200454 DOC ~ DATE 80/1 0/05 NOTARIZED 'NO DOCKEiT FACIL:50-250 Turkey Point Pliant~ Uni t 3i Florida Power and Light C 05000250 AUTH'AME AUTHOR AFFIL'IATION UHRIGi R ~ E ~ Florida Power 8, Light Co.

REC IP ~ NAME RECIPIENT AFFILIATION EISENHUT~D.G ~ Division of Licensing

SUBJECT:

Forwards info re inse'rvice insp program in response to NRC 800414 l tr.

DISTRIBUT.ION CODE: A001S COPIES RECEIVED:LiTR TITLE: General Di st ribut i on for after Issuance

. ENCL 'IZE!

of Oper~ting License NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LiTTR ENCL ID CODE/NA'ME LTTR ENCL ACTION: VARGAiS ~ . 04 1'33 INTERNAL: D/DIRg HUM FAC08 1, 1 ILE 06 2 2 NRC PDR 02 1, OE 1.1 1 0 OR ASSESS BR 10 0- R G F ILE 0'1 1 1 EXTERNAL: ACRS 09 16 16 LPDR 03 1 1

'NS IC 05 1 1 far)-

~)

TOTAl. NUMBER OF COPIES REQUIRED: LTTR 38 ENCL 36

41 I

I'i k I

I' f

~

J

~

jl~

'ff I f

lf I "I g 14% III I 4c Sg I,' 0 I 'I I Ii a

o C yl ~ ~ vI II i[  !

1 II I~

~i

FLORIOA POWER 8 LIGHT COMPANY October 15, 1980 L-80-341 Office of Nuclear Regulation Attention:, Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Ei.senhut:

Re: Turkey Point Unit 3 Docket No., 50-250 Inservice In~s ectio~

The Inservice Inspection Program information requested in an NRC letter dated April 14, 1980 is attached.

Very truly yours, Robert E- Uhri'g Vice President Advanced Systems 8 Technology REU/PLP/'pah cc: Mr. J. P'. O'Reilly, Region II Harold F. Reis, Esquire 8@1 Qooo lf$ g' PEOPLE... SERVING PEOPLE

li ATTACHMENT Re: Turkey Point Unit 3 Docket No. 50-250 Inservice Ins ection

1. Our request in Section 6.2. 1.2 of the Turkey Point Unit 3 ISI Program to use Appendix III for the inspection of ferritic piping systems will be modified to include the staff guidelines provided in your request for additional information.
2. The examinations proposed for repairs outlined in Section 8.2. 1 and 8.2.2 will include the examination method that detected the flaw requiring repair. Pressure tests in accordance with IWA-5000 will be included for repair examination except in those circumstances where it is determined to be impractical in accordance with Section 50.55a (g)(5)(IV) of 10 CFR 50.
3. We forsee,no conflicts between the pressure and temperature requirements of IWB-5000 and the Turkey Point Technical Specifications. If a conflict should arise in the future, Technical Specification changes or code relief will be requested.
4. Paragraph IWB-1220(b)(l) was not used as a criterion for exempting lines based on pipe size in this submittal of the Turkey Point Unit No. 3 ISI Program.
5. Paragraph IWC-1220(c) was not used as a criterion for exempting components based on control of the chemistry of the contained fluid by periodic sampling and test in this submittal of the Turkey Point Unit No. 3 ISI Program.

Paragraph IWC-1220(b) was not used as a criterion for exempting ECCS components based on nonoperation during normal reactor operation in the submittal of the Turkey Point Unit No. 3 ISI Program.

II ~ ~

C