Responds to NRC 790503 Ltr Re Violation Noted in IE Insp Repts 50-250/79-07 & 50-251/79-07.Corrective Actions: Individuals Who Performed Local Leak Rate Tests Were Certified on 790302
ML17338A866
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/29/1979
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17338A865 List:
References
L-79-146, NUDOCS 7907240020
Download: ML17338A866 (3)


Text

P.O. BOX 529100, MIAMI,F L 33152 IIIII'.

FLORIDA POWER 6 LIGHT COMPANY'ay 29 1979 L-79-1/6 Hr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Comssion 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Nr. O'Reilly:

Re: RII:AHJ 50-250/79-07 50-251/79-07 Florida Power 5 Light Company has reviewed the subject. inspection report and a response ls attached.

There is no proprietary information in the report.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 5 Technology REU/MAS/cph Attachment cc: Robert Lowenstein, Esquire

~9II~~4oC PO e orna 9)o~.

PEOPI.E ., SERVING PEOPLE

'I AlTACHmNT Re: RII:AHJ 50-250/79-07 50-251/79-07 Findinci As required by 10 CFR 50, Appendix B, Criterion IX, measures shall be established to assure that special processes, including welding, heat treating, and nondestructive testing, are controlled and accomplished by qualified personnel using qualified procedures in accordance with applicable codes, standards, specifications, criteria, and other special requirements.

FP&L Topical guality Assurance Report, Section 9.0 identifies leak testing as a special process. guality Procedure 9.2 requires that personnel performing special processes be certified and certification be maintained current.

Contrary to the above, local leak rate testing during the period of December, 1978 through February, 1979 was performed by uncertified personnel.

~Res ense Corrective action was taken to certify the individuals who performed local leak rate tests during the period December, 1978 through February, 1979.

Compliance was achieved by this certification, which was completed on March 2, 1979.

To prevent recurrence and to be consistent with established industry practices, we intend to delete leak testing from the Turkey Point designation of special processes.