Discusses Rejection of Preferred right-of-way for Alignment of Transmission Line from Plant Site to Kyrene,Az, & Provides Alternative Routing Through Rainbow Valley.One Oversize Drawing,Available in Central Files Only
ML17296A515
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/03/1979
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Gilbert R
Office of Nuclear Reactor Regulation
References
ANPP-14363, NUDOCS 7912130561
Download: ML17296A515 (5)


Text

REGULATORY . FORMATION DISTRIBUTION SYS ir.M (RIDS)

ACCESSION NBR:7912130561 DOC,DATE: 79/12/03 NOTARIZED: NO DOCKET FACIJ';STA-50-528 Palo Verde Nuclear Station~ Unf t Ii Ar izona Publ f 05000528 8TN-50-529 Palo Verde Nuclear -Station~ Unit 2~ Arizona Publi 05000529 STN-50-530 Palo Verde Nuc)ear Stationi Unit BYNAME 3g Arizona Publi 05000530 AUTH AUTHOR AFFILIATION VAN GRUNTLE ~ E, Arizona Public Sei vice Co.

RECIP,NAME RECIPIENT AFFILIATION GILBERT z R ~ A ~ Division of Site Safety 8 Environmental Analysis

SUBJECT:

Discusses rejection of preferred right-of way for alignment of transmission 'line from plant site to. KyteneiAZ~ 3 provides alternative routing through Rainbow Valley. One oversize drawing~available in Central Files onlygencl ~

DISTRIBUTION CODE: C002S COPIES RECEIVEOlLTR ENCL SIZE:

TITLE: Environs Comments, NOTES: W'leNOW Pt~O+W RECIPIENT COPIES RECIPIENT C OPIES ID CODE/NAME L'TTR ENCL ID CODE/NAME LT TR ENCL ACTION: ~~MWQ 18 LA ~~ @'g 1 I 17 BC AD@ ~

INTERNAL: REG FILE 1 1 02 NRC PDR 0 2 09 ENVN SPEC BR 10 CST BNFT ANL 12 GEOSCIEN BR 1

1 li TA/EDO 13 HYDRO METEOR ACDENT ANALY 1 15 EFLT TRT SYS 16 RAO ASMT OR 19 DIR OSE AO'NVIRON TECH 1 AO SITE ANALY OELO 1 EXTERNAL: 03 LPDR 1 04 NSIC 20 NATL LAB ~~5 5 ACRS g,~ x-wQ Fm~C,~

Q.. &~a SKIRV'mn>

Em+ Rwc-w~~m 10TAL NUMBER OF COPIES HEQUIRED: LTTR 28 ENCL

ARIZONA NUCLEAR ER PROJECT Post Office Box 21666 Phoenix, Arizona 85036 December 3, 1979 PNPP-14363 - JMA/JRM Dr. Robert A. Gilbert Project Manager Environmental Projects Branch 3 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket Nos. STN 50-528/529/530 Palo Verde Nuclear Generating Station Units 1, 2 8 3 (PVNGS)

Dear Dr. Gilbert:

As discussed in Section 3.8 of the Final Environmental Statement related to the construction of Palo Verde Nuclear Generating Station Units 1, 2 8 3 (NUREG-75/078), dated September 1975, the proposed PVNGS transmission line alignments "have alternatives which might be employed if the preferred alignments are not acceptable to any governmental agency having jurisdiction in such matters." Despite extensive negotiations through the summer of 1976, the Tribal Council of the Gila River Indian Community rejected a request for right-of-way for the preferred alignment of the PVNGS-Kyrene Transmission Line. This preferred alignment was previously approved by the Arizona Power Plant and Transmission Line Siting Committee (Siting Committee) and is discussed in NUREG-75/078, Section 3.8. 1.

As a result of the Tribal Council's action, alternative routings of the PVNGS to Kyrene line were studied and an application for a Certificate of Environmental Compatibility was filed with the Siting Committee seeking approval for one of such alternatives. Following a public hearing on July 25, 1977, the Siting Committee approved the corridor route depicted in Attachment and a Certificate of 1

Environmental Compatibility was subsequently issued therefor.

Coo>

5 g

Dpjg w'I/If z;/:s R.s;ha~~

/gal. Si 80&6/ g//ofl~zs Bc~ei~e= 64 <<~p'

Dr. Robert A. Gilbert December 3, 1979 ANPP-14363 - JMA/JRM Page 2 The corridor route depicted in Attachment 1 is a combination of Routes A and B discussed in NUREG-75/078, Section 9.3.1. It consists of the first 23 miles of Route A and the last 34 miles of Route B connected by a link of approximately 17 miles designated the "Rainbow Valley Alternate Link." Route A corresponds to the proposed PVNGS to Kyrene route discussed in Section 3.8 of NUREG-75/078. Route B was proposed as an alternate route. The Rainbow Valley Alternate Link is not discussed in NUREG-75/078; as shown in Attachment 1, it lies mostly on 'land under the jurisdiction of the Bureau of Land Management (BLM).

On December 7, 1977, an application for right-of-way for the Rainbow Valley Alternate Link was filed with the Arizona State Office of BLM.

On August 8, 1979, after extensive field work, the application was "perfected" (the centerline located exactly on BLM lands). The BLM is preparing an Environmental Analysis Record for the Rainbow Valley Alternate Link. A portion of the Rainbow Valley Alternate Link has previously been reviewed in conjunction with a BLM transmission line FES not related to the Palo Verde project.

When BLM has completed their Environmental Analysis Record and approved the final alignment for the Rainbow Valley Alternate Link, the final alignment for the entire length of the Palo Verde-Kyrene Transmission Line within the corridor route depicted on Attachment 1 will be sub-mitted pursuant to NUREG-75/078 Summary and Conclusions, Condition

7. f.

Very truly yours,

~~,

g.e. d~

E. E. Van Brunt, Jr.

APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/JRM/av Attachment

+0 T2N ~-0 8 5 555 I 8 PHOENIX 8 8088 8 5T TOLEESON

  • I 85 800 8 8 AI gfvo 8 0 8 I. 6 T885MTT TIN TEMPEL 0 5 8550 TIN 10 0 558~

PVNGSi I /

85 KYRENE TIS IS WVGA re O+ 9" L U

RD T25 T25 L

T3S T35 47W R6W R 5W R 4W R3W R2W R IW RIE R2E R3E R4E R5E LEGEND 5 8

.U 9 BUREAU OF LAND MANAGEMENT AORTH TERLINE JF DDKV TRANSMISSION LINE NOTE ENGTH OF Rrw OVER J 9 B 5 M LANDS-SS, SGG SS+ FEE R 29 62 MILES SALT RIVER PROJECT

~ TI D *ITA 0 0 I' ALO VERDE TO KYRENE PROJECT R/W 500KV TRANSMISSION LINE 51 5

. T>ID AND ACE E SS ROAD ATTACHMENT 1 A-675-439 I7

U.

LL

<<I I-

<<I O

IJt t0 tK tJJ Z

T2N ~ro eg) r PHOENIX C

v'AiN BURE N ST INTERSTATE I IO TOLLESON BUCKEYE RL!

~l

)

GOODYEAR AZ HWY BS (

AVONDALE

~ TERSTATE TIN TEMPE APAC HE BLVD.

TI N IO TO MESA~

PVNGS BUCKEYE AZ

+. I J

rl, Y IIVDIAN COMAIUIVIT Y

<<'I X  ! GOUN iARY

~VQ, E / '

~ KYRENE BLM) J RNOE.NII/f TIS gv v M 0 UNTA IN I

I SIOU T H I MouN TAIN TIS RARNJ o+> I gL QQ g E G I 1 TZ @0 L I G/L A RIVER

/NDIAN COAIMUNITY I BOUNDARY I- INDIAN GIL A Ii'IVER COAIAIUNITY ARLIIUGTON IV/L DL /FE A/i'EA j ROUND A R Y.

/7 I V E R / N D A N T2S l

T2S 0

T3S HJ

<<X CI Z

QY O

M M U N T I'7 G T3S R7W R6W R5W R4W R3W R2W RIW R IE R2E R3E R4E R5E LEGEND ENGINEER STATEMENT U. S. BUREAU OF LAND MANAGEMENT NORTH APPLICANT S CERTIFICATE S AR'ZONA PUBLIC SERVICE CO A E MC QUEEN STA ES THAT HE IS BY OCCUPATION 4 CIVIL CI TERLINE OF 500KV TRANSMISSION LINE PUBLIC SERVICE CO OF NEW MEXICO ENGINEER EMPLOYED BY THE SALT RIVER PROJECT AGRICULTURAL EL PASO ELECTRIC CO IMPROVEMENT AND POWER DISTRICT, A POLITtCAL SUBDIVISION SALT RIVER PROJECT AGRt CULTURAL MPROVEME NT AND POWER DISTRICT PROJECT MANAGER ) STATE OF ARIZONA, TO MAKE THE SURVEY OF THE OF THE SOD KV E ECTRIC TRANSMISSION LINE RIGHT OF WAY, AS DESCRIBED NOTE. i ENGTH OF R/W OVER U S B.L.M. LANDS AND SH'N ON THIS MAP, THAT THE SURVEY OF SAID WORKS WAS THIS IS TO CERTIFY THAT A E MC QUEEN WHO SUBSCRIBED THE MADE NDER HIS SUPERVISION AND UNDER AUTHORITY, COMMENCING i56,388.53+ FEET OR 29.62 MILES STATEMENT HEREON S THE PERSON EMPLOYED BY THE UNDERSIGNED ON THE 27TH DAY OF MARCH 1976 AND ENDING ON THE t6TH APPLICANT TO PREPARE THIS MA P WHICH HAS BEEN ADOPTED BY DAY OF MAY 1976 AND THAT SUCH SURVEY IS ACCURATELY THE 4 PPLICANT it S THF APPROX M ATE f N AL I LOCATION OF THE REPRESENTED UPON THIS M AP'-

WORKS THEREBY SHOWN AND THIIT THIS MAP IS FILED AS A PART OF THE COMPLETE APPLICATION AN' ORDER THAT THE APPLICANT MAY OBTAiN THE BENEFITS OF THE AC OF OCTOBER 2I 1976 90 STAT 2743 43 0 S C t/6I, AND FURTHER CERTIYY THAT HE RIGHT OF WAY HERE'N DESCRIBED IS DESiRED FOR SOOKV ELECTRIC TRANSMISSION LINE RIGHT OF WAY.

4 E MC QUEEN SALT RIVER PROJECT ARIZONA WATER ANO POWER PHOENIX PALO VERDE TO KYRENE PROJECT DATE P4UL D RICE SECRETARY R/W 500KV TRANSMISSION LINE AND ACCE SS ROAD SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT MIKE BURNS CHK DESiGNED OFT.

DRAWN TINA GODFREY CHK PROJECT MANAGER DATE AR l9r RECOMM ND SCALE NO N E APPROVED ATTACHMENT 4 675-459. I 7