LER 90-006-01:on 900605,containment Isolation Valves Exceeded Stroke Time Limit,Per Tech Spec 3.6.3.1.Caused by Deficient Surveillance Program.Surveillance Procedures Revised to Include Stroke Time requirements.W/910214 Ltr
ML17286B265
Person / Time
Site: Beaver Valley
Issue date: 02/14/1991
From: Noonan T
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-90-006, LER-90-6, ND3MNO:4003, NUDOCS 9102190130
Download: ML17286B265 (8)


Text

ACCELERATED D TRIBUTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9012190130 DOC. DATE: 90/11/30 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System BAKER,J.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Nov 1990 for WPPSS Unit 2.

W/901215 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs ENCL 2 SIZE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 ENG,P.L. 1 "1 INTERNAL: ACRS 10 10 , AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 IRM TECH ADV 2 2 QJM JRQ- B1 0 1 1 NRR/DOEA/OEAB 1 1 EG FILE 01 1 1 RGN5 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bcvc96'8 ~ 3000George Wasbbsgton Way ~ RIcbland, Washington 99352-0968 ~ (509)372-5000 Docket No. 50-397 December 5, 1990 GO2-90-200 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT NOVEMBER 1990 Transmitted herewith is the Monthly Operating Report for the month of November 1990 as required by our Technical Specifications 6.9.1.6.

Very truly yours, J.W. Baker WNP-2 Plant Manager 927M) 'MD JWB:LBH:bap Enclosure cc: Mr. J.B. Martin, NRC Region V Mr. C.J. Bosted, NRC Resident Inspector (901A)

Ms. Dottie Sherman, ANI, Farmington CT Mr. J.T. Wheelock, INPO Mr. W.H. Lovelace, NRC, Washington DC

  • 9012190i30 90il30

>>PDR ADOCK 05000397

~R PDR

~ ~

P K

I Ny

OPERATING DATA REPORT WNP-2 Ol-Dec-90

1. DOCKET 50-397
2. REPORTING PERIOD: Nov-90 OUTAGE + ON-LINE HOURS 720
3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1095
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

None.

10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
11. REASONS FOR RESTRICTIONS, IF ANY: None ~

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 720 8016 52280.2
13. HOURS REACTOR CRITICAL 532.6 5231.7 38307.0
14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
15. HRS GENERATOR ON LINE 511. 9 5090.9 36938.5
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 1531376 15886559 104230999
18. GROSS ELECTRICAL ENERGY (MWH) 512450 5286050 34690000
19. NET ELECTRICAL ENERGY (MWH) 489999 5056537 33342680
20. UNIT SERVICE FACTOR 7 1 ~ l~o 63 '~o 70 7+o
21. UNIT AVAILABILITYFACTOR 71 l~o 63.54 71.44
22. UNIT CAPACITY FACTOR (MDC NET) 62. 2% 57.64 58.2%
23. UNIT CAPACITY FACTOR (DER NET) 61. 9~o 55 '~o 58 2~o
24. UNIT FORCED OUTAGE RATE 28. 9~o 6. O~o 8. 3~o
25. FORCED OUTAGE HOURS 208. 1 325.4 3321.5 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS 'TYPE I DATE I DURATION)

~

u e 6 tr n 41391 for 51da s.

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

t 0

I V

l~

NO. 50"397 UNIT NAME WNP-2 LNIT SllUTDONNS /

11'OCKET REDUCTIONS DATE COMPLETED BY 12/5/90 LB Hutchison c

REPCAT PERIOD Nov. 1990 TELEPllONE (509) 377-2486 ,

mcnth, year RM 'DDAf llPE WKJRB REAsGP MEM~Mco tElllZI 5t =! ClIO 0 HKVE REC HRENC 9007 11/2/90 F 208.1 A SF PIPEXXA Plant was shutdown after. confirmation by NDE '

testing of a crack in a 3/4" drairi line off HPCS injection header,. The crack was repaire and NDE testing was performed on 104 welds on similar, drains in the ECCS system prior to returning plant tosservice.

%HAP 11/28/90 F Power, was reduced due to feedwater. level control difficulties caused by valve linkage problems.

MNP-2 incurred one forced outage and oneppower, reduction in November, as described above.

SUNlARY T'YPE SYSTEM & COMPONENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched 0-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Ref ueling . H-Other 3-Auto Scram Preparation of D-Regulatory Res triction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-Oia.)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

WNP"2 DATE 11/1/90 COMPLETED BY LBlHutchison TELEPHONE (509) 377"2486 f 10NTH November, 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MwE-Net) (MwE-Net) 1080 17. 1077

2. 869 18. 1078
3. 19. 1079
20. 1083
5. 21. 1075
22. 1044
7. 23. 1016
8. 24. 997
9. 25. 1070"'085
10. 26.

84 27m 1033 559 28. 806 12.

955 865

13. 29 861 '0.

911 14.

826

15. 31.

1032 16.

INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporti ng month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100 line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

f+ e

~ ~