ACCELERATED DISTRIBUTION DEMONSTR TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9008300144 DOC.DATE: 90/08/23 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas

& Electric ICorp.

RECIP.NAME RECIPIENT AFFILIATION MARTIN,T.T.

Region 1 (Post 820201) l

SUBJECT:

Special rept:on 900717,fire suppression sys inoperable for

" more than 7 days w/redundant component.

i DISTRIBUTION CODE:

IE22D COPIES RECEIVED LTR ENCL ~

SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

DOCKET 05000244 05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL'CNW AEOD/DSP/TPAB NRR/DET/ECMB,9H NRR/DLPQ/LHFB11 NRR/DOEA/OEAB11 NRR/DST/SELB 8D AS.

PLB8D1 02 RGN1 FILE 01 EXTERNAL EGGG BRYCE g J

~ H LPDR NSIC MAYS,G NUDOCS FULL TXT COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD1-3 PD A"OD/DOA AEOD/ROAB/DSP NRR/DET/EMEB9H3 NRR/DLPQ/LPEB10 NRR/DREP/PRPB11 NRR/DST/SICB 7E NRR/DST/SRXB 8E RES/DSIR/EIB I

L ST LOBBY WARD NRC PDR NSIC MURPHYgG A COPIES LTTR ENCL 1

1 1

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE lVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOi~l Pl-37 (EXT. 20079) TO ELIMINATEYOUR'Atv!EFROM DISTRIBUTION LISTS FOR DOCUb IENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 32 ENCL

ROCHESTER GAS AND ELECTRIC CORPORATION

~ 89 EAST AVENUE, vow g ~ ( Qht ~ ~

Pl

')>>

vol%

ROCHESTER, N.Y. 14649-0001

'ugust 23, 1990 TCLKPHONE AREA coDL 710 546.2700 Mr. Thomas T. Martin Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

Subject:

Thirty (30)

Day Special Report Fire Suppression System With An Inoperable Redundant Component R.E.

Ginna Nuclear Power Plant Docket Number 50-244

Dear Mr. Martin:

In accordance with R.E.

Ginna Nuclear Power Plant Technical Specifications 3.14.2.1a, this Thirty Day Special Report regarding an inoperable redundant fire system component (diesel fire pump) in excess of the seven day Limiting Condition for Operation (LCO) is hereby submitted.

On

Tuesday, July 17,
1990, procedure EM-38, "Diesel Fire Pump Battery Charging and Surveillance",

a weekly maintenance inspection activity implemented pending a

defective battery charger replacement, revealed that the specific gravity of one of the "B" bank batteries was below acceptance limits.

Operations was notified and procedure A-52.4.1, "Control of Limiting Conditions for Operations of Fire Suppression and Detection Equipment" was initiated at 0910 starting the seven day LCO.

Replacement batteries for the diesel fire pump had been ordered previously and were received during the seven day LCO period.

Two of the batteries failed receipt inspection and were returned to the vendor for exchange.

Replacement of the defective "B" batteries was delayed pending receipt of batteries for both banks to permit a single battery changeout and a single operability test after the battery exchange.

900S300i44 900823 F'DP PDOC[

O~i00024.4 8

PDC PW~t 1(q)I<0

Page 2

Docket No. 50-244 August 23,'990 At 0910 Tuesday, July 24, 1990, the seven day LCO ended.

This required starting of the motor driven fire pump and running it continuously until the diesel fire pump was determined operable and returned to service.

The diesel fire pump batteries were replaced and the unit tested in accordance with procedure PT-13.3, "Fire Pump Operation and System Alignment".

The diesel fire pump was determined operable at 1313 on July 24, 1990.

Very truly yours, Robert C.

Me redy Vice-President Ginna Nuclear Production xc:

U.S. Nuclear Regulatory Commission Document Control Desk (Original)