Special Rept:On 970407,inoperable Fire Suppression Sprinkler Sys Hourly Tour Was Suspended Prematurely.Caused by Personnel Error.Action Rept Initiated & Fire Watch Personnel Were Advised That Operations Approval Is Required
ML17264A894
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/07/1997
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9705150244
Download: ML17264A894 (4)


Text

CATEGORY REGBLRTi'NFORMATION DISTRIBUTIO ISTEM (RIDE)

ACCESSION NBR:9705150244 DOC.DATE: 97/05/07 NOTARIZED:

NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION

~ MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSING,G.

SUBJECT:

Special rept:on 970407,inoperable fire suppression sprinkler sys hourly tour was suspended prematurely. Caused by personnel error. Action rept initiated

& fire watch personnel were advised that operations approval, is reauired.

DISTRIBUTION CODE:

IE22D COPIES RECEIVED:LTR I

ENCL Q SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER),-incident >pt, etc.

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 E

INTERNAL:

RECIPIENT ID CODE/NAME PD1-1 PD IL CENTE B

NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN1 FILE 01 COPIES LTTR ENCL 2

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME VISSINGFG.

AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/H1CB NRR/DRC i/vQMB NRR/DSSA/SPLB RES/DET/EIB COPIES LTTR ENCL EXTERNAL: L ST LOBBY WARD NOAC POORE,W.

NRC PDR 1

1 1

1 LITCO BRYCE,J H

NOAC QUEENERFDS NUDOCS FULL TXT C

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROI DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL

4ND ROCHESTER GAS ANDEIECIRICCOREORARON

~ RREASTAIIENUE ROCHESTER, N Y Idd~dP OMI AREA CODE2165d6 2200 ROBERT C. PAECREDY Vice Prcsideni Nvc,'cor Occrorioos May 7, 1997 U.S. Nuclear Regulatory Commission Document Control Desk Attn:

Guy S. Vissing Project Directorate I-1 Washington, D.C. 20555

Subject:

Thirty (30) Day Special Report Inoperable Fire Suppression Sprinkler System Hourly Tour Suspended Prematurely R.E. Ginna Nuclear Power Plant Docket No. >0-244

Dear Mr. Vissing:

The Service Building fire suppression sprinkler system was removed from service, thus requiring an hourly fire watch tour.

The required hourly fire watch tour was prematurely suspended, prior to the system being declared operable.

In accordance with the Ginna Station Technical Requirements Manual (TRM), Section TR 3.7.2, Required Action C.1, which requires a Special Report outlining the cause of the system inoperability and plans for restoring the system to operable status, this thirty (30) day Special Report is being submitted.

On April 7, 1997, at approximately 1600 EDST, the suppression system which protects the Service Building was removed from service and declared inoperable.

The system was declared inoperable to complete the removal of several system sprinkler heads which were not required.

Compensatory actions, consisting of an hourly fire watch tour, were taken upon the start of the maintenance activities as required per TR 3.7.2 Required Action B.

Maintenance activities were completed at 1730 EDST on April 7, 1997, and the system was vented and filled (after the main isolation valve for this suppression system was returned to the fullopen position).

Fire watch activities were prematurely suspended at 1730 EDST, since the fire watch personnel assumed all activities were completed.

However, Operations did not administratively declare the system operable until 2100 EDST on April 7.

Atapproximately 0700 EDST on April8, it was discovered that there had been a lapse in hourly fire watch coverage from 1730 EDST to 2100 EDST on April7. ACTIONReport 97-0564 was initiated and fire watch personnel were advised that Operations approval is required to ~

discontinue compensatory measures.

This event was subsequently reviewed with all fire watch personnel to preclude recurrence.

/

llllllllfllllllllfllllfill ffflIfffffff 9705150244 970507 PDR ADOCK 05000244 S

PDR

1

Page 2 Upon further investigation, it was determined (through the use of Security card access data) that Security force personnel (who are also fire watch trained) provided equivalent hourly tour

, coverage.

Security personnel gained access to both elevations of the Service Building during this lapse in hourly tour coverage to provide an equivalent compensatory measure.

It should also be noted that during this lapse in fire watch coverage, the suppression system was capable

- of performing its intended function.

After all maintenance activities were completed, the main isolation valve was restored to the full open position to verify that the piping changes were acceptable.

Very truly yours,

'obert C. Mecredy xc:

Mr. Guy S. Vissing (Mail Stop 14B2)

PWR Project Directorate I-1 Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector