Ro:On 890619,safety Injection Pump Recirculation Valves B & C Discovered Locked Full Open at Approx 99% Power.Power Reduction Commenced to Comply W/Tech Spec.Testing & Throttling of Safety Injection Pumps B & C Accomplished
ML17251A548
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/20/1989
From: Spector S
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8906280101
Download: ML17251A548 (6)


Text

REGUL~RY INFORMATION DISTRISUTISYSTEM (RIDE)

ACCESSION NBR:8906280101 DOC.DATE: 89/06/20 NOTARIZED: NO DOCKET FACIL:50-244 'Rooert Emmet Ginna Nuclear Plant, Unit 1, Rocheste" G 05000244 AUTH.NAM AUTHOR AFFILZATZON SPECTOR,S.M. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION Document Conr,rol Branch (Document Control Desk)

SUBJECT-: RO:on 890619,B & C sa etv injection pump recirculation valves discovered locked full open at approx 99% power.

DISTRlBUTZON CODE: E22D COPIES RECEIVED:LTR t ENCL t SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER)-, Incident Rpt, etc.

fi NOTES:License Exp date 'n accordance ~rith 10CFR2,2.109(9/19/72). 05000244 I5 RECIPIENT COPIES RECIPIENT COPIES ZD CODE/NAME LTTR ENCL ZD CODE/NAME LTTR ENCL

.PD1-3 LA 1 1 PD1-3 PD 1 JOHNSON,A .1 1 INTERNAL: ACRS MZCHELSON 1 1 ACRS MOELLER 2 ACRS WYLIE 1 1 AEOD/DOA 1 AEOD/DSP/TPAB 1 AEOD/ROAB/DSP 2 DEDRO 1 1 ZRM/DCTS/DAB 1 NRR/DEST/ADE 8H 1 1 NRR/DEST/ADS 7E 0 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 NRR/DEST/ICSB 7 1 NRR/DEST/MEB 9H 1 NRR/DEST/MTB 9H 1 NRR/DEST/PSB 8D 1 NRR/DEST/RSB 8E 1 1 NRR/DEST/SGB 8D 1 NRR/DLPQ/HFB 10 NRR/DOEA/EAB NUDOCS-ABS RAC ll 1 1

1 NRR/DLPQ/PEB NR REP RPB BEG F~~r 10

'0 02 1

2 1

RES/DSIR/EZB 1 1 RES/DSR/PRAB 1 RGNl "ILE 01 1 1 R

EXTERNAL: EG&G WZLLIAMSFS 4 4 FORD BLDG HOY,A L ST LOBBY HARD 1 1 LPDR I NRC PDR 1 1 NSZC MS YS G NSIC MURPHY,G.A 1 D h

NOZE K) ALL 'KIDS" RZCIPIENIS:

PLEASE HELP US 'IO REDUCE RESTE.'DNI'ACr 'IHE DOCUMERI'ONIROL DESK, RXN Pl-37 (EXT. 20079) To EIJKQRTE VXK NAME PRES DIPHGBVPIGN LISTS FOR DOCQQZZS KXJ DOHFT NEEDt TOTAL NUMBER OF COPIES REQUZR=D: LTTR 43 NCL 42

'l<tF II ( ~

ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TE'+ Obf iici conc "~ < 5 "G.2 700 June 20, 1989 U.S. Nuclear'egulatory Commission Document Control Desk Washington, DC 20555

Subject:

Follow-up Summary of Close-out of June 19, 1989 Unusual Event R.E. Ginna Nuclear Power Plant Docket No. 50-244 In accordance with NUREG 0654, FEMA-Rep-l, Rev. 1 reporting requirements which requires a written summary of "close-out. or class reduction conditions", the attached close-. out summary for the June 19, 1989 Unusual Event is hereby submitted.

C This event has in no'ay affected the public's health and safety.

Very truly yours, Stanl y M. Spector Plant Manager Ginna Station xc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna USNRC Resident Inspector R. C. Mecredy D. W. Burke CyPgr20 aeoszsoioi ADOCV

~goooao4 0

PDR egu S

Attachment to Close-out of June 19 1989 Unusual Event On June 19, 1989 at approximately 1440 EDST with the reactor at approximately 99% power, it was discovered that the "B" and "C" safety injection pump recirculation valves- were locked full open rather than throttled to 50 gpm as required. The "B" and "C" safety injection pumps were immediately declared inoperable and a power reduction was commenced to comply with the plant Technical Specification.

At approximately 1515 EDST, the operations shift supervisor declared an Unusual Event in accordance with SC-100, "Ginna Station Event Evaluation and Classification>>, EAL: Loss of Engineered Safety Features; Exceeding a Limiting Condition for.

operations on a safety system requiring a plant shutdown. Tech Spec Section 3.3 Emergency Core Cooling System. All offsite notifications were made per SC-601, "Unusual Event Notifications".

At approximately 1615 EDST; subsequent to the satisfactory testing and throttling of the "B" and "C" safety injection pumps recirculation valves to 50 gpm, the "B" and "C" safety injection pumps were declared operable and the load reduction stopped..

With the "B" and "C" safety injection pumps declared operable and the load reduction stopped, the operations shift supervisor, with approval and concurrence from the Plant Manager Ginna Station, the Superintendent Ginna Production, the assistant operations supervisor, PORC and the duty engineer, declared the Unusual Event terminated't 1626 EDST, June 19, 1989 in accordance with SC-110, "Ginna Station Event Evaluation for Reducing the Classification".

All offsite notifications were made of the Unusual Event termina-tion and the plant was subsequently returned to approximately full power.