ML15174A311

From kanterella
Jump to navigation Jump to search
Requalification Program Inspection: Millstone Power Station, Unit 3
ML15174A311
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/23/2015
From: Diane Jackson
Operations Branch I
To: Heacock D
Dominion Resources
Shared Package
ML15139A241 List:
References
Download: ML15174A311 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 June 23, 2015 Mr. David Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - MILLSTONE POWER STATION, UNIT 3

Dear Mr. Heacock:

In a telephone conversation on June 17, 2015, Mr. D. Silk, Senior Operations Engineer, and Mr. J. Birch, Supervisor Nuclear Training, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at Millstone Unit 3.

The inspection is planned for the week of August 24, 2015, which coincides with the scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations, and operating test scheduled for the week of the inspection to the NRC by August 3, 2015.

Mr. J. Birch has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.

D. Heacock 2 The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S.

Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.

20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. D. Silk at (610) 337-5372.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-423 License No. NPF-49 cc: Distribution via ListServ

D. Heacock 2 The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S.

Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.

20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. D. Silk at (610) 337-5372.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-423 License No. NPF-49 cc: Distribution via ListServ Distribution w/encl:

D. Dorman, RA (R1ORAMAIL Resource) B. Haagensen, DRP, RI D. Lew, DRA R1ORAMAIL Resource) L. McKown, DRP, RI H. Nieh, DRP (R1DRPMAIL RESOURCE K. MorganButler, RI OEDO M. Scott, DRP (R1DRPMAIL RESOURCE RidsNrrPMMillstone Resource R. Lorson, DRS (R1DRSMAIL RESOURCE) RidsNrrDorlLpl1-1 Resource J. Trapp, DRS (R1DRSMAIL RESOURCE) ROPreports Resource R. McKinley, DRP D. Jackson, DRS S. Shaffer, DRP D. Silk, Examiner, DRS E. DiPaolo, DRP L. Vick, NRR/ADRO/DIRS/IOLB J. Ambrosini, DRP, SRI C. Bixler, DRS (OL Facility File)

ADAMS PKG: ML15139A241 ADAMS NO.: ML15174A311 DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Requal FY15-MS3 Aug\Millstone3-60dayletter.doc Non-Sensitive Publicly Available SUNSI Review OFFICE RI/DRS/OB RI/DRS/OB NAME DSilk DJackson DATE 06/23/2015 06/23/2015 5 OFFICIAL RECORD COPY