NRC Comments on Draft Licensee-Developed Operating Test (Folder 2)
ML17087A088
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/10/2017
From: David Silk
Operations Branch I
To:
Dominion Nuclear Connecticut
Shared Package
ML16337A097 List:
References
U01968
Download: ML17087A088 (1)


Text

Millstone Unit 2 JPM Comments The licensee submitted several spare JPMs to expedite the review and approval process if some JPMs were deemed to be unacceptable.

The chief examiner replaced the original A 1.1 JPM (max RCS venting time) with the spare A 1.3 (Evaluate an RCP seal failure) because the replacement JPM had more discriminatory value.

The chief examiner replaced the original S-7 sim JPM (respond to SG level safety channel failure low) with the spare S-9 (mitigating a reactor regulating system failed T-cold input) because the replacement JPM had more discriminatory value.

During the validation immediately prior to the exam administration, several editorial and clarifying changes were made to enhance the quality of the JPMs.