Letter Sequence Draft Other |
---|
|
Results
Other: ML20055D883, ML20055E009, ML20057E559, ML20057E560, ML20087G852, ML20087H514, ML20184A247, ML20184A248, ML20240A318, ML20240A322, ML20254A128, ML20254A272, ML20268A322, ML20268B437, ML20268C197, ML20274A136, ML20279A331, ML20297A306, ML20300A556, ML20301A632, ML20302A234, ML20302A235, ML20303A011, ML20303A016, ML20307A010, ML20307A019, ML20321A279, ML20322A350, ML20323A018, ML20325A031, ML20328A162, ML20329A432, ML20329A442, ML20350B716, ML20350B723, ML20350B739, ML20350B785, ML21012A270, ML21025A073, ML21025A143, ML21025A403, ML21025A405, ML21025A414, ML21040A471, ML21040A483, ML21043A207, ML21050A084, ML21050A119, ML21050A227, ML21056A220... further results
|
MONTHYEARML20055E0202019-04-22022 April 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20260H1522019-10-14014 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20260H1512019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) Project stage: Draft Other ML20260H1502019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20055E0132019-10-15015 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20055E0172019-10-28028 October 2019 Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) Project stage: Draft Other ML20055E0152019-10-28028 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20055E0122019-10-28028 October 2019 NRC Comments on Draft Licensee-Developed Operating Test Project stage: Draft Other ML20055E0092020-01-15015 January 2020 Final Q/A Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML20055D8832020-01-15015 January 2020 Final Qa/Related Forms (Folder 1) Project stage: Other ML20260H1542020-01-24024 January 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20260H1532020-01-24024 January 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML21025A4142020-02-0707 February 2020 Original Questions for Modified Questions Project stage: Other ML21025A1432020-02-0707 February 2020 ES-401-6 (Folder 1) Project stage: Other ML21025A0732020-02-0707 February 2020 Final QA Related Forms (Folder 1) Project stage: Other ML20279A3312020-02-0707 February 2020 Handouts to Applicants (Folder 3) Project stage: Other ML20274A1362020-02-0707 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML20274A1052020-02-0707 February 2020 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20274A0922020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20274A0832020-02-0707 February 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20274A0662020-02-0707 February 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20057E5602020-02-0707 February 2020 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML20057E5592020-02-0707 February 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML21056A3062020-02-10010 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML21056A2852020-02-15015 February 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML21056A2842020-02-15015 February 2020 Final Qa/Related Forms (Folder 1) Project stage: Other ML21056A3072020-03-12012 March 2020 Handouts to Applicants (Folder 3) Project stage: Other ML20087H5142020-03-27027 March 2020 Ja Fitzpatrick Final Written Exam Questions and Answer Key Project stage: Other ML20087G8522020-03-27027 March 2020 Ja Fitzpatrick - Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML20267A1582020-06-0303 June 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20267A3922020-06-0909 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) Project stage: Other ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key Project stage: Draft Other ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) Project stage: Draft Other ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) Project stage: Draft Other ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20268B4372020-08-10010 August 2020 Handouts to Applicants (Folder 3) Project stage: Other ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) Project stage: Draft Other ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20240A3222020-08-27027 August 2020 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other 2020-03-12
[Table View] |
|
---|
Category:License-Operator
MONTHYEARML24281A1102024-10-0707 October 2024 Requalification Program Inspection ML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23298A1652023-10-26026 October 2023 Requalification Program Inspection ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22277A2522022-10-0404 October 2022 Requalification Program Inspection ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21172A2372021-06-21021 June 2021 Requalification Program Inspection ML21105A6502021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A0162020-09-18018 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20303A0322020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) ML20303A1442020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Exam (Written) ES-401-9 ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20105A1592020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323C9172019-11-18018 November 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19238A0262019-08-22022 August 2019 Operator Licensing Examination Approval ML19120A3112019-04-29029 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19064B3922019-03-0505 March 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18248A2662018-09-0404 September 2018 Operator Licensing Examination Approval ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18106A1602018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE IR 05000423/20173012018-02-0606 February 2018 Initial Operator Licensing Examination Report 05000423/2017301 ML18029A6512018-01-29029 January 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18074A3682017-12-0101 December 2017 Handouts to Applicants, Summary of References (Folder 3) ML18074A3562017-12-0101 December 2017 Final Qa/Related Forms (Folder 1) ML18074A3582017-12-0101 December 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17334A0662017-11-29029 November 2017 Operator Licensing Examination Approval ML18074A3662017-11-27027 November 2017 Final Outlines (Folder 3) ML18029A6622017-11-27027 November 2017 Final Operating Exam (Section a, B and C) (Folder 3) ML18029A6432017-11-27027 November 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML18074A3602017-10-30030 October 2017 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) 2024-10-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A1442020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Exam (Written) ES-401-9 ML20303A0322020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20303A0162020-09-18018 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323C9172019-11-18018 November 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19238A0262019-08-22022 August 2019 Operator Licensing Examination Approval ML18248A2662018-09-0404 September 2018 Operator Licensing Examination Approval ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18106A1602018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) IR 05000423/20173012018-02-0606 February 2018 Initial Operator Licensing Examination Report 05000423/2017301 ML18029A6512018-01-29029 January 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18074A3582017-12-0101 December 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML18074A3682017-12-0101 December 2017 Handouts to Applicants, Summary of References (Folder 3) ML18074A3562017-12-0101 December 2017 Final Qa/Related Forms (Folder 1) ML17334A0662017-11-29029 November 2017 Operator Licensing Examination Approval ML18029A6622017-11-27027 November 2017 Final Operating Exam (Section a, B and C) (Folder 3) ML18029A6432017-11-27027 November 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML18074A3662017-11-27027 November 2017 Final Outlines (Folder 3) ML18074A3602017-10-30030 October 2017 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML18074A3612017-10-15015 October 2017 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML18074A3642017-09-0707 September 2017 Draft Written Exam (Folder 2) ML18074A3652017-08-25025 August 2017 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML18074A3622017-06-27027 June 2017 Draft - Operating Outlines (Folder 2) ML18074A3632017-05-23023 May 2017 Draft - Written Outlines (Folder 2) ML17142A2962017-05-17017 May 2017 Preparation and Scheduling of Operator Licensing Examinations ML17103A0402017-04-12012 April 2017 Senior Reactor and Reactor Operator Initial License Examinations - Millstone Power Station, Unit 3 ML17087A0862017-03-23023 March 2017 Final Qa/Related Forms (Folder 1) ML17087A0882017-03-10010 March 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17087A0872017-03-10010 March 2017 Miscellaneous (Folder 1) 2023-02-09
[Table view] |
Text
ES-401, REV 11 T1G1 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G TOPIC:
RO SRO 007EA2.05 Reactor Trip - Stabilization - Recovery 3.4 3.9 Reactor trip first-out indication
/1 008AK2.02 Pressurizer Vapor Space Accident / 3 2.7 2.7 Sensors and detectors 009EG2.4.50 Small Break LOCA / 3 4.2 4.0 Ability to verify system alarm setpoints and operate controls identified in the alarm response manual.
015AK2.08 RCP Malfunctions / 4 2.6 2.6 CCWS 025AK1.01 Loss of RHR System / 4 3.9 4.3 Loss of RHRS during all modes of operation 026AA1.02 Loss of Component Cooling Water / 8 3.2 3.3 Loads on the CCWS in the control room 027AK2.03 Pressurizer Pressure Control System 2.6 2.8 Controllers and positioners Malfunction / 3 029EA2.01 ATWS / 1 4.4 4.7 Reactor nuclear instrumentation 038EG2.1.25 Steam Gen. Tube Rupture / 3 3.9 4.2 Ability to interpret reference materials such as graphs, monographs and tables which contain performance data.
040AK3.03 Steam Line Rupture - Excessive Heat 3.2 3.5 Steam line non-return valves Transfer / 4 054AK3.02 Loss of Main Feedwater / 4 3.4 3.7 Matching of feedwater and steam flows Page 1 of 2 11/15/2019 8:02 AM
ES-401, REV 11 T1G1 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G TOPIC:
RO SRO 055EK1.01 Station Blackout / 6 3.3 3.7 Effect of battery discharge rates on capacity 056AA1.29 Loss of Off-site Power / 6 2.7 2.7 CCW heat exchanger temperature control valves 057AK3.01 Loss of Vital AC Inst. Bus / 6 4.1 4.4 Actions contained in EOP for loss of vital ac electrical instrument bus 058AA1.01 Loss of DC Power / 6 3.4 3.5 Cross-tie of the affected dc bus with the alternate supply 062AA2.01 Loss of Nuclear Svc Water / 4 2.9 3.5 Location of a leak in the SWS 065AG2.4.1 Loss of Instrument Air / 8 4.6 4.8 Knowledge of EOP entry conditions and immediate action steps.
077AK1.03 Generator Voltage and Electric Grid 3.3 3.4 Under-excitation Disturbances / 6 Page 2 of 2 11/15/2019 8:02 AM
ES-401, REV 11 T1G2 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G TOPIC:
RO SRO 005AA2.02 Inoperable/Stuck Control Rod / 1 2.5 3 Difference between jog and run rod speeds effect on CRDM of stuck rod 028AK3.02 Pressurizer Level Malfunction / 2 2.9 3.2 Relationships between PZR pressure increase and Reactor makeup/letdown imbalance 036AK3.01 Fuel Handling Accident / 8 3.1 3.7 Different inputs that will cause a reactor building evacuation 037AG2.2.38 Steam Generator Tube Leak / 3 3.6 4.5 Knowledge of conditions and limitations in the facility license.
061AA1.01 ARM System Alarms / 7 3.6 3.6 Automatic actuation 067AA2.10 Plant Fire On-site / 8 2.9 3.6 Time limit of long-term-breathing air system for control room 068AK2.03 Control Room Evac. / 8 2.9 3.1 Controllers and positioners 076AA1.04 High Reactor Coolant Activity / 9 3.2 3.4 Failed fuel-monitoring equipment CE09EK1.1 Functional Recovery / None 3.4 3.7 Components, capacity, and function of emergency systems.
Page 1 of 1 11/15/2019 8:03 AM
ES-401, REV 11 T2G1 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G TOPIC:
RO SRO 003K4.07 Reactor Coolant Pump 3.2 3.4 Minimizing RCS leakage (mechanical seals) 004A2.09 Chemical and Volume Control 3.0 3.9 High primary and/or secondary activity 004A2.35 Chemical and Volume Control 3.3 3.8 Reactor trip 005K2.01 Residual Heat Removal 3.0 3.2 RHR pumps 005K6.03 Residual Heat Removal 2.5 2.6 RHR heat exchanger 006K2.04 Emergency Core Cooling 3.6 3.8 ESFAS-operated valves 007K5.02 Pressurizer Relief/Quench Tank 3.1 3.4 Method of forming a steam bubble in the PZR 008A1.02 Component Cooling Water 2.9 3.1 CCW temperature 008K4.02 Component Cooling Water 2.9 2.7 Operation of the surge tank, including the associated valves and controls 010K3.01 Pressurizer Pressure Control 3.8 3.9 RCS 010K6.01 Pressurizer Pressure Control 2.7 3.1 Pressure detection systems Page 1 of 3 11/15/2019 8:03 AM
ES-401, REV 11 T2G1 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G TOPIC:
RO SRO 012G2.2.25 Reactor Protection 3.2 4.2 Knowledge of the bases in Technical Specifications for limiting conditions for operations and safety limits.
013K2.01 Engineered Safety Features Actuation 3.6 3.8 ESFAS/safeguards equipment control 022A1.04 Containment Cooling 3.2 3.3 Cooling water flow 026A4.05 Containment Spray 3.5 3.5 Containment spray reset switches 039K1.02 Main and Reheat Steam 3.3 3.3 Atmospheric relief dump valves 059A3.07 Main Feedwater 3.4 3.5 ICS 061K6.02 Auxiliary/Emergency Feedwater 2.6 2.7 Pumps 062A2.08 AC Electrical Distribution 2.7 3.0 Consequences of exceeding voltage limitations 063A3.01 DC Electrical Distribution 2.7 3.1 Meters, annunciators, dials, recorders and indicating lights 063G2.4.41 DC Electrical Distribution 2.9 4.6 Knowledge of the emergency action level thresholds and classifications.
064K3.03 Emergency Diesel Generator 3.6 3.9 ED/G (manual loads)
Page 2 of 3 11/15/2019 8:03 AM
ES-401, REV 11 T2G1 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G TOPIC:
RO SRO 073A1.01 Process Radiation Monitoring 3.2 3.5 Radiation levels 073K5.02 Process Radiation Monitoring 2.5 3.1 Radiation intensity changes with source distance 076A3.02 Service Water 3.7 3.7 Emergency heat loads 076K4.03 Service Water 2.9 3.4 Automatic opening features associated with SWS isolation valves to CCW heat exchanges 078K1.05 Instrument Air 3.4 3.5 MSIV air 103G2.2.36 Containment 3.1 4.2 Ability to analyze the effect of maintenance activities, such as degraded power sources, on the status of limiting conditions of operations Page 3 of 3 11/15/2019 8:03 AM
ES-401, REV 11 T2G2 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G TOPIC:
RO SRO 015K5.10 Nuclear Instrumentation 2.8 3.0 Ex-core detector operation 017A3.01 In-core Temperature Monitor 3.6 3.8 Indications of normal, natural and interrupted circulation of RCS 027G2.4.46 Containment Iodine Removal 4.2 4.2 Ability to verify that the alarms are consistent with the plant conditions.
028A2.01 Hydrogen Recombiner and Purge 3.4 3.6 Hydrogen recombiner power setting, determined by Control using plant data book 034K1.02 Fuel Handling Equipment 2.5 3.2 RHRS 041K6.03 Steam Dump/Turbine Bypass Control 2.7 2.9 Controller and positioners, including ICS, S/G, CRDS 055K3.01 Condenser Air Removal 2.5 2.7 Main condenser 071K4.04 Waste Gas Disposal 2.9 3.4 Isolation of waste gas release tanks 072A1.01 Area Radiation Monitoring 3.4 3.6 Radiation levels 075K2.03 Circulating Water 2.6 2.7 Emergency/essential SWS pumps Page 1 of 1 11/15/2019 8:04 AM
ES-401, REV 11 T3 PWR EXAMINATION OUTLINE FORM ES-401-3 KA NAME / SAFETY FUNCTION: IR K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G TOPIC:
RO SRO G2.1.4 Conduct of operations 3.3 3.8 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, "no-solo" operation, maintenance of active license statur, 10CFR55 etc.
G2.1.5 Conduct of operations 2.9 3.9 Ability to locate and use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.
G2.2.37 Equipment Control 3.6 4.6 Ability to determine operability and/or availability of safety related equipment G2.2.40 Equipment Control 3.4 4.7 Ability to apply technical specifications for a system.
G2.2.6 Equipment Control 3.0 3.6 Knowledge of the process for making changes to procedures G2.3.12 Radiation Control 3.2 3.7 Knowledge of radiological safety principles pertaining to licensed operator duties G2.3.15 Radiation Control 2.9 3.1 Knowledge of radiation monitoring systems G2.4.19 Emergency Procedures/Plans 3.4 4.1 Knowledge of EOP layout, symbols and icons.
G2.4.3 Emergency Procedures/Plans 3.7 3.9 Ability to identify post-accident instrumentation.
G2.4.50 Emergency Procedures/Plans 4.2 4.0 Ability to verify system alarm setpoints and operate controls identified in the alarm response manual.
Page 1 of 1 11/15/2019 8:05 AM
ES-401, REV 11 SRO T1G1 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G TOPIC:
RO SRO 008AA2.16 Pressurizer Vapor Space Accident / 3 3.8 4.1 RCS in-core thermocouple indicators; use of plant com-puter for interpretation 015AA2.02 RCP Malfunctions / 4 2.8 3 Abnormalities in RCP air vent flow paths and/or oil cooling system 040AG2.4.18 Steam Line Rupture - Excessive Heat 3.3 4.0 Knowledge of the specific bases for EOPs.
Transfer / 4 054AA2.06 Loss of Main Feedwater / 4 4 4.3 AFW adjustments needed to maintain proper T-ave. and S/G level 057AG2.1.25 Loss of Vital AC Inst. Bus / 6 3.9 4.2 Ability to interpret reference materials, such as graphs, Curves, tables, etc.
077AG2.4.3 Generator Voltage and Electric Grid 3.7 3.9 Ability to identify post-accident instrumentation.
Disturbances / 6 Page 1 of 1 11/15/2019 8:15 AM
ES-401, REV 11 SRO T1G2 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G TOPIC:
RO SRO 024AG2.2.39 Emergency Boration / 1 3.9 4.5 Knowledge of less than one hour technical specification action statements for systems.
037AG2.2.37 Steam Generator Tube Leak / 3 3.6 4.6 Ability to determine operability and/or availability of safety related equipment 069AA2.01 Loss of CTMT Integrity / 5 3.7 4.3 Loss of containment integrity CA11AA2.1 RCS Overcooling - PTS / 4 2.9 3.3 Facility conditions and selection of appropriate procedures during abnormal and emergency operations.
Page 1 of 1 11/15/2019 8:15 AM
ES-401, REV 11 SRO T2G1 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G TOPIC:
RO SRO 003A2.03 Reactor Coolant Pump 2.7 3.1 Problems associated with RCP motors, including faulty motors and current, winding and bearing temperature problems 008G2.4.46 Component Cooling Water 4.2 4.2 Ability to verify that the alarms are consistent with the plant conditions.
010G2.2.22 Pressurizer Pressure Control 4.0 4.7 Knowledge of limiting conditions for operations and Safety limits.
013A2.03 Engineered Safety Features Actuation 4.4 4.7 Rapid depressurization 022A2.02 Containment Cooling 2.3 2.6 Fan motor vibration Page 1 of 1 11/15/2019 8:17 AM
ES-401, REV 11 SRO T2G2 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G TOPIC:
RO SRO 016A2.02 Non-nuclear Instrumentation 2.9 3.2 Loss of power supply 027G2.4.45 Containment Iodine Removal 4.1 4.3 Ability to prioritize and interpret the significance of each annunciator or alarm.
072A2.03 Area Radiation Monitoring 2.7 2.9 Blown power-supply fuses Page 1 of 1 11/15/2019 8:18 AM
ES-401, REV 11 SRO T3 PWR EXAMINATION OUTLINE FORM ES-401-3 KA NAME / SAFETY FUNCTION: IR K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G TOPIC:
RO SRO G2.1.30 Conduct of operations 4.4 4.0 Ability to locate and operate components, including local controls.
G2.2.14 Equipment Control 3.9 4.3 Knowledge of the process for controlling equipment configuration or status G2.2.35 Equipment Control 3.6 4.5 Ability to determine Technical Specification Mode of Operation G2.3.14 Radiation Control 3.4 3.8 Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities G2.3.4 Radiation Control 3.2 3.7 Knowledge of radiation exposure limits under normal and emergency conditions G2.4.41 Emergency Procedures/Plans 2.9 4.6 Knowledge of the emergency action level thresholds And classifications.
G2.4.11 Emergency Procedures/Plans 4.0 4.2 Knowledge of abnormal condition procedures.
Page 1 of 1 11/15/2019 8:20 AM