ML19120A311

From kanterella
Jump to navigation Jump to search
March 6, 2019, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public)
ML19120A311
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/29/2019
From: Diane Jackson
Operations Branch I
To: Walsh C
Dominion Energy Nuclear Connecticut
Bixler C
References
Download: ML19120A311 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 April 29, 2019 Ms. Cristalle M. Walsh Training Manager Dominion Energy Nuclear Connecticut, Inc.

Millstone Power Station 314 Rope Ferry Road Waterford, CT 06385

SUBJECT:

MARCH 6, 2019, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR MILLSTONE POWER STATION, UNIT 2 (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD FROM PUBLIC)

Dear Ms. Walsh:

On March 6, 2019, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) section of the written operator licensing examination to ten employees at your facility and all passed. A passing grade is 80 percent or better. Enclosed with this letter are copies of both forms of the examination, including answer keys, the grading results for your facility, and copies of the individual answer sheets for each of your employees.

Please forward the results to the individuals along with the copies of their respective answer sheets.

If you have any questions concerning this examination, please contact Mr. Eric Cushing at 301-415-1064 and/or Eric.Cushing@nrc.gov.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-336 Enclosures (Non-Public):

1. Examination Forms A and B with answers
2. Examination Results Summary for Millstone Unit 3
3. Individual Answer Sheets
4. Post-Examination Comments and Responses cc w/o enclosures: Distribution via ListServ

C. Walsh

SUBJECT:

MARCH 6, 2019, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR MILLSTONE POWER STATION, UNIT 2 (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD FROM PUBLIC)

C. WALSH MARCH 6, 2019 GENERIC FUNDAMENTALS RESULTS LETTER DATED APRIL 29, 2019.

DOCUMENT NAME:

G:\DRS\Operations Branch\GFE\2019\03-06 MS 2 GFE ResultsLtr.docx ADAMS Package No. ML19100A129 ADAMS No. ML19120A311 OFFICE RI/DRS/OB:OLA RI/DRS/OB:BC NAME CBixler DEJackson DATE 04/22/19 04/29/19 OFFICIAL RECORD COPY