Preparation and Scheduling of Operator Licensing Examinations
ML17142A296
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 05/17/2017
From: Mark D. Sartain
Dominion Nuclear Connecticut, Dominion Resources Services, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
17-182
Download: ML17142A296 (6)


Text

Dominion Resources Services, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 U.S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 May 17, 2017 Serial No.:

17-182 NLOS/vlh Docket Nos.: 50-336/423 50-338/339 50-280/281 License Nos.: DPR-65 NPF-49 NPF-4/7 DPR-32/37 DOMINION NUCLEAR CONNECTICUT. INC. (DNC)

VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE

SUMMARY

2017-03 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRG Regulatory Issue Summary 2017-03, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).

No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. Frank Winks at (804) 273-4610.

Very truly yours, Mark D. Sartain Vice President - Nuclear Engineering & Fleet Support Dominion Resources Services, Inc. for Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company

Enclosures:

NRG Form 536 for Millstone, North Anna and Surry Power Stations cc:

U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Boulevard Suite 100 King of Prussia, Pennsylvania 19406-2713 U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257

Mr. Richard Guzman U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 Mr. James R. Hall U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Karen Cotton Gross U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station SN 17-182 Scheduling of Operator Licensing Examinations Page 2of2

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)

~****,,...

Estimated burden per response to comply with this voluntaiy information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

~<:l

>c, OPERA TOR LICENSING information collection Is used to plan budgets and resources for operator examinations.

Send Ii'/

~

comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5

~

0 F53), U.S. Nuclear Regulatoiy Commission, Washington, DC20555-0001, or by e-mail to

~

'IC EXAMINATION DATA

~

I lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatoiy Affairs,

~+..,

+o"'

NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Millstone Power Station Unit 2 1

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 NUMBER OF REACTOR 8

8 OPERATORS NUMBER OF SENIOR REACTOR 4

4 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 4

4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 9114120 9/12122 ALTERNATE DATE 9121120 9119122

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 18 CY 19 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF NIA NIA NIA NIA CANDIDATES NRG FORM 536 (05-2016)

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)

~***o,,(q Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

~;;:j

>o OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.

Send l}J

~

comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5

~

s F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to a:

EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

~+.

oj NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means

!)***""""~

used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the inform.ation collection.

FACILITY NRC REGION Millstone Power Station Unit 3 1

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 NUMBER OF REACTOR 8

8 OPERATORS NUMBER OF SENIOR REACTOR 4

4 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 4

4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 919119 9113121 ALTERNATE DATE 9/16119 9120121

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 18 CY 19 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF NIA NIA NIA NIA CANDIDATES NRC FORM 536 (05-2016)

'* I NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)

~CJ.,,,.RREol/C..,>.

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This o,.

OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.

Send

~

comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 0

F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to In c

EXAMINATION DATA

/;

lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

"+..,

+01 NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means

      • ~*

used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.

FACILITY NRC REGION North Anna Power Station Units 1 & 2 2

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 NUMBER OF REACTOR 8

8 OPERATORS NUMBER OF SENIOR REACTOR 3

3 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 2

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 618120 616122 ALTERNATE DATE 6115120 6113122

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 18 CY 19 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF NIA NIA NIA NIA CANDIDATES NRG FORM 536 (05-2016)
t.

i:

U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 FACILITY OPERA TOR LICENSING EXAMINATION DATA Surry Power Station Units 1 & 2 Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations.

Send comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.

NRC REGION 2

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 19 CY 20 CY 21 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 0

EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 19 CY 20 CY 21 NUMBER OF REACTOR 8

10 OPERATORS NUMBER OF SENIOR REACTOR 5

3 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES I

PRIMARY DATE 4122119 813120 ALTERNATE DATE 4129119 8110120 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES NRG FORM 536 (05-2016)

CY 18 MARCH SEPTEMBER NIA NIA CY 19 MARCH NIA CY 22 --

1 0

CY 22 10 3

2 811/22 818122 SEPTEMBER NIA