Dominion Resources Services, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 U.S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 May 17, 2017 Serial No.:
17-182 NLOS/vlh Docket Nos.: 50-336/423 50-338/339 50-280/281 License Nos.: DPR-65 NPF-49 NPF-4/7 DPR-32/37 DOMINION NUCLEAR CONNECTICUT. INC. (DNC)
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE
SUMMARY
2017-03 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRG Regulatory Issue Summary 2017-03, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).
No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. Frank Winks at (804) 273-4610.
Very truly yours, Mark D. Sartain Vice President - Nuclear Engineering & Fleet Support Dominion Resources Services, Inc. for Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company
Enclosures:
NRG Form 536 for Millstone, North Anna and Surry Power Stations cc:
U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Boulevard Suite 100 King of Prussia, Pennsylvania 19406-2713 U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257
Mr. Richard Guzman U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 Mr. James R. Hall U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Karen Cotton Gross U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station SN 17-182 Scheduling of Operator Licensing Examinations Page 2of2
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)
~****,,...
Estimated burden per response to comply with this voluntaiy information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
~<:l
>c, OPERA TOR LICENSING information collection Is used to plan budgets and resources for operator examinations.
Send Ii'/
~
comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5
~
0 F53), U.S. Nuclear Regulatoiy Commission, Washington, DC20555-0001, or by e-mail to
~
'IC EXAMINATION DATA
~
I lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatoiy Affairs,
~+..,
+o"'
NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Millstone Power Station Unit 2 1
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 0
1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 NUMBER OF REACTOR 8
8 OPERATORS NUMBER OF SENIOR REACTOR 4
4 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 4
4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 9114120 9/12122 ALTERNATE DATE 9121120 9119122
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 18 CY 19 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF NIA NIA NIA NIA CANDIDATES NRG FORM 536 (05-2016)
NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)
~***o,,(q Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
~;;:j
>o OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.
Send l}J
~
comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5
~
s F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to a:
EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,
~+.
oj NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means
- !)***""""~
used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the inform.ation collection.
FACILITY NRC REGION Millstone Power Station Unit 3 1
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 NUMBER OF REACTOR 8
8 OPERATORS NUMBER OF SENIOR REACTOR 4
4 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 4
4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 919119 9113121 ALTERNATE DATE 9/16119 9120121
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 18 CY 19 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF NIA NIA NIA NIA CANDIDATES NRC FORM 536 (05-2016)
'* I NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)
~CJ.,,,.RREol/C..,>.
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This o,.
OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.
Send
~
comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 0
F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to In c
EXAMINATION DATA
/;
lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,
"+..,
+01 NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means
- ~*
used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.
FACILITY NRC REGION North Anna Power Station Units 1 & 2 2
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 0
1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 NUMBER OF REACTOR 8
8 OPERATORS NUMBER OF SENIOR REACTOR 3
3 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 2
2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 618120 616122 ALTERNATE DATE 6115120 6113122
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 18 CY 19 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF NIA NIA NIA NIA CANDIDATES NRG FORM 536 (05-2016)
- t.
i:
U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 FACILITY OPERA TOR LICENSING EXAMINATION DATA Surry Power Station Units 1 & 2 Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations.
Send comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.
NRC REGION 2
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 19 CY 20 CY 21 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 0
EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 19 CY 20 CY 21 NUMBER OF REACTOR 8
10 OPERATORS NUMBER OF SENIOR REACTOR 5
3 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2
2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES I
PRIMARY DATE 4122119 813120 ALTERNATE DATE 4129119 8110120 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES NRG FORM 536 (05-2016)
CY 18 MARCH SEPTEMBER NIA NIA CY 19 MARCH NIA CY 22 --
1 0
CY 22 10 3
2 811/22 818122 SEPTEMBER NIA