Dominion Nuclear Connecticut, Inc.

Rope Ferry Rd., Waterford, CT 06585 Mailing Address: P.O. Box 128 Waterford, CT 06385 dam.com EXAMINATION SECURITY AND INTEGRITY CONSIDERATIONS -WITHHOLD UNDER GUIDANCE OF NUREG-1021, ES201 JAN O3 2017 Donald E. Jackson, Chief Serial No. 16-490A Operations Branch - Division of Reactor Safety MPS Lie/JAR RO U.S. Nuclear Regulatory Commission Docket No. 50-336 2100 Renaissance Blvd., Suite 100 License No. DPR-65 King of Prussia, PA 19406-2713 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 2 REACTOR OPERATOR RETAKE LICENSE EXAMINATIONS - EXAMINATION OUTLINES In a letter dated December 14, 2016, 1 the U.S. Nuclear Regulatory Commission (NRC) requested Dominion Nuclear Connecticut, Inc. (DNC) submit examination materials (written examination outline, draft examination, and supporting reference materials, etc.)

on the dates agreed upon for administration of the examination during the week of February 27, 2017. Enclosure 1, Examination Outline, is being furnished in accordance with 10 CFR 55.40(b)(3) by an authorized representative of the facility. All materials are "complete and ready-to-use."

Consistent with guidance contained in NU REG - 1021 Examination Standard 201, Attachment 1, "Examination Security and Integrity Considerations, the outline contained in Enclosure 1 should be withheld from public disclosure until after the examination has been completed. No redacted versions are being supplied.

If you have any questions or require additional information, please contact Mr. Jeffry A.

Langan at (860) 444-5544.

Since_/YJ Joh.;,t.1oa~

Site Vice President - Millstone 1

Letter from Donald E. Jackson to Daniel G. Stoddard, "Reactor Operator Retake License Examination -

Millstone Power Station, Unit 2," dated December 14, 2016 NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS REACTOR OPERATOR EXAMINATION INFORMATION - WITHHOLD UNTIL AFTER THE EXAMINATION HAS BEEN COMPLETED PER GUIDANCE IN NUREG-1021, ES201

EXAMINATION SECURITY AND INTEGRITY CONSIDERATIONS - WITHHOLD UNDER GUIDANCE OF NUREG-1021, ES201 Serial No. 16-490A Reactor Operator Retake License Examinations Examination Outlines Page 2 of 2

Enclosure:

1 Commitments made in this letter: None cc: (w/o enclosure)

Daniel H. Dorman, Region I Administrator U.S. Nuclear Regulatory Commission Region 1 2100 Renaissance Blvd. Suite 100 King of Prussia, PA 19406-2713 Richard V. Guzman NRC Senior Project Manager U.S. Nuclear Regulatory Commission, Mail Stop 08 C2 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS REACTOR OPERATOR EXAMINATION INFORMATION - WITHHOLD UNTIL AFTER THE EXAMINATION HAS BEEN COMPLETED PER GUIDANCE IN NUREG-1021, ES201

Serial No. 16-490A EXAMINATION SECURITY AND INTEGRITY CONSIDERATIONS - WITHHOLD UNDER GUIDANCE OF NUREG-1021, ES201 Enclosure 1 REACTOR OPERATOR RETAKE LICENSE EXAMINATIONS MILLSTONE POWER STATION, UNIT 2 EXAMINATION OUTLINES MILLSTONE POWER STATION UNIT 2 DOMINION NUCLEAR CONNECTICUT, INC. (DNC)

NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS REACTOR OPERATOR EXAMINATION INFORMATION - WITHHOLD UNTIL AFTER THE EXAMINATION HAS BEEN COMPLETED PER GUIDANCE IN NUREG-1021, ES201

Dominion Nuclear Connecticut, Inc.

Rope Ferry Rd., Waterford, CT 0638'i Mailing Address: EO. Box 128 Waterford, CT 06385 dom.com EXAMINATION SECURITY AND INTEGRITY CONSIDERATIONS - WITHHOLD UNDER GUIDANCE OF NUREG-1021, ES-201 FEB 0 6 2017 Donald E. Jackson, Chief Serial No. 16-490C Operations Branch - Division of Reactor Safety MPS Lie/JAR RO U.S. Nuclear Regulatory Commission Docket No. 50-336 2100 Renaissance Blvd., Suite 100 License No. DPR-65 King of Prussia, PA 19406-2713 DOMINION NUCLEAR CONNECTICUT. INC.

MILLSTONE POWER STATION UNIT 2 REACTOR OPERATOR RETAKE LICENSE EXAMINATION: OPERATING TESTS AND SUPPORTING REFERENCE MATERIALS In a letter dated December 14, 2016, 1 and in advance of the examination scheduled for the week of February 27, 2017, the U.S. Nuclear Regulatory Commission (NRC) requested Dominion Nuclear Connecticut, Inc. (DNC) submit operating tests and supporting reference materials by the week of February 13, 2017 for the Reactor Operator Written Retake Examination - Millstone Power Station Unit 2 (MPS2).

Enclosure 1, "Reactor Operator Retake License Examination: Operating Tests and Supporting Reference Materials, is being furnished in accordance with 10 CFR 55.40(b)(3) by an authorized representative of the facility. All materials are "complete and ready-to-use."

Waivers will be requested, through the final applications, under separate cover. The waivers will be requested under section D.1.a of ES-204 and are for the written examination and simulator operating test. Both candidates successfully completed these portions of the initial licensing exam in September 2016. This is the first retake and it is within one year of the original examination.

Consistent with guidance contained in NUREG-1021 Examination Standard 201, Attachment 1, "Examination Security and Integrity Considerations, Enclosure 1 should be withheld from public disclosure until after the examination has been completed. No redacted versions are being supplied.

1 Letter from Donald E. Jackson to Daniel G. Stoddard, "Reactor Operator Retake License Examinations

- Millstone Power Station, Unit 2," dated December 14, 2016 NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS LICENSED OPERATOR EXAMINATION INFORMATION - WITHHOLD UNTIL AFTER THE EXAMINATION HAS BEEN COMPLETED PER GUIDANCE IN NUREG-1021, ES-201.

Serial No. 16-490C Reactor Operator Retake License Examinations Operating Tests and Supporting Reference Materials Page 2 of 2 If you have any questions or require additional information, please contact Mr. Jeffry A.

Langan at (860) 444-5544.

Sincerely,

/)~

JohlR. Daugherty Site Vice President - Millstone

Enclosure:

1 Commitments made in this letter: None cc: (w/o enclosure)

Daniel H. Dorman, Region I Administrator U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd. Suite 100 King of Prussia, PA 19406-2713 Richard V. Guzman NRC Senior Project Manager U. S. Nuclear Regulatory Commission, Mail Stop 08 C2 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS LICENSED OPERATOR EXAMINATION INFORMATION - WITHHOLD UNTIL AFTER THE EXAMINATION HAS BEEN COMPLETED PER GUIDANCE IN NUREG-1021, ES-201.

Serial No. 16-490C EXAMINATION SECURITY AND INTEGRITY CONSIDERATIONS - WITHHOLD UNDER GUIDANCE OF NUREG-1021, ES-201 ENCLOSURE 1 REACTOR OPERATOR RETAKE LICENSE EXAMINATION:

OPERATING TESTS AND SUPPORTING REFERENCE MATERIALS MILLSTONE POWER STATION UNIT 2 DOMINION NUCLEAR CONNECTICUT, INC. (DNC)

NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS LICENSED OPERATOR EXAMINATION INFORMATION - WITHHOLD UNTIL AFTER THE EXAMINATION HAS BEEN COMPLETED PER GUIDANCE IN NUREG-1021, ES-201.