ML18060A306

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - Acceptance Review Results for South Texas Project Relief Request to Extend the Timeframe for Volumetric Exams of B-A and B-D Reactor Vessel Welds (L-2018-LLR-0010)
ML18060A306
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 03/01/2018
From: Lisa Regner
Plant Licensing Branch IV
To: Sterling L
South Texas
References
L-2018-LLR-0010
Download: ML18060A306 (2)


Text

NRR-DMPSPEm Resource From: Regner, Lisa Sent: Thursday, March 01, 2018 1:34 PM To: Lance Sterling (lsterling@stpegs.com)

Cc: Regner, Lisa

Subject:

Acceptance Review Results: Relief Request (L-2018-LLR-0010)

By letter dated February 12, 2018, STPNOC submitted a relief request for South Texas Project, Units 1 and 2.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request to apply the WCAP-16168 methodology to volumetric exams of B-A and B-D reactor vessel welds. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 100 hours4.167 days <br />0.595 weeks <br />0.137 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any question, please contact me, Lisa Regner, at Lisa.Regner@nrc.gov or 301-415-1906.

Lisa M. Regner Senior Project Manager Branch 4, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Lisa.Regner@NRC.gov 301-415-1906 OWFN 9D14 1

Hearing Identifier: NRR_DMPS Email Number: 221 Mail Envelope Properties (SN6PR09MB2720249A640733BAA73725C6E5C60)

Subject:

Acceptance Review Results: Relief Request (L-2018-LLR-0010)

Sent Date: 3/1/2018 1:34:05 PM Received Date: 3/1/2018 1:34:05 PM From: Regner, Lisa Created By: Lisa.Regner@nrc.gov Recipients:

"Regner, Lisa" <Lisa.Regner@nrc.gov>

Tracking Status: None "Lance Sterling (lsterling@stpegs.com)" <lsterling@stpegs.com>

Tracking Status: None Post Office: SN6PR09MB2720.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2905 3/1/2018 1:34:05 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: