Other: ML20142A520, ML20148M389, ML20227A385, NL-20-039, (04/29/2020) E-mail from R. Gaston to R. Guzman, Exemption Request from Requirements of 10 CFR Part 73, Appendix B, Section VI, Subsection C.3.(l)(1), NL-20-0620, SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation
|
MONTHYEARML19269E9782019-09-26026 September 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec Project stage: Request NOC-AE-190036, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Essential Cooling Water (Ecw) System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1)2019-09-26026 September 2019 Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Essential Cooling Water (Ecw) System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1) Project stage: Request ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) Project stage: Draft Other ML19312A0962019-11-13013 November 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Alternative to ASME Requirements for Repair of Essential Cooling Water Class 3 Buried Piping Project stage: Acceptance Review ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping Project stage: Acceptance Review ML20036F5862020-02-0404 February 2020 Request for Additional Information - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L-2019-LLR-0096)Redacted Project stage: RAI ML20069L4992020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping Project stage: Request NOC-AE-20003716, Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping2020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping Project stage: Request NL-20-039, (04/29/2020) E-mail from R. Gaston to R. Guzman, Exemption Request from Requirements of 10 CFR Part 73, Appendix B, Section VI, Subsection C.3.(l)(1)2020-04-29029 April 2020 (04/29/2020) E-mail from R. Gaston to R. Guzman, Exemption Request from Requirements of 10 CFR Part 73, Appendix B, Section VI, Subsection C.3.(l)(1) Project stage: Other ML20128J8432020-05-15015 May 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20142A5202020-05-21021 May 2020 Exemption Request Due to COVID-19 Pandemic Project stage: Other NL-20-0620, SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation2020-05-22022 May 2020 SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation Project stage: Other NL-20-0640, Response to Request for Additional Information for Exemption Request2020-05-27027 May 2020 Response to Request for Additional Information for Exemption Request Project stage: Response to RAI ML20148M3892020-05-27027 May 2020 Exemption from Annual force-on-force (Fof) Exercise Project stage: Other ULNRC-06587, Supplement to Security Training Exemption Request Due to COVID-192020-06-17017 June 2020 Supplement to Security Training Exemption Request Due to COVID-19 Project stage: Supplement NOC-AE-20003749, Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24)2020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Response to RAI ML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 Project stage: Approval ML20197A2612020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Response to RAI NOC-AE-20003755, Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24)2020-07-30030 July 2020 Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Supplement ML20212L5682020-07-30030 July 2020 Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Supplement ML20232D1442020-08-26026 August 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20227A3852020-09-0303 September 2020 Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping Project stage: Other 2020-05-15
[Table View] |
Text
From:
Galvin, Dennis Sent:
Monday, December 9, 2019 5:20 PM To:
Nic Boehmisch (nboehmisch@stpegs.com)
Cc:
Drew Richards (amrichards@stpegs.com); Dixon-Herrity, Jennifer
Subject:
South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID: L 2019-LLR-0096)
Mr. Boehmisch By letter dated September 26, 2019 (Agencywide Documents Access and Management System Accession No. ML19274C393), as supplemented by letter dated November 26, 2019 (ADAMS Accession No. ML19331A202), STP Nuclear Operating Company (STPNOC, the licensee) submitted a proposed alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) at South Texas Project (STP) Units 1 and 2. The proposed alternative to ASME Code,Section XI, IWA-4000, applies a carbon fiber reinforced polymer (CFRP) system for the internal repair of buried Essential Cooling Water (ECW) piping.
The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC or the Commission) staffs acceptance review of this proposed relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review, as compared to the detailed technical review, there may be instances in which issues that impact the staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the staffs detailed technical review by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 950 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.61475e-4 months <br /> to complete. The NRC staff expects to complete this review by August 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
Please contact me with any questions.
Respectfully, Dennis Galvin Project Manager U.S Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Operating Reactor Licensing Licensing Project Branch 4 301-415-6256 Docket No. 50-498 and 50-499
Hearing Identifier:
NRR_DRMA Email Number:
337 Mail Envelope Properties (CH2PR09MB39570E497B115CD7D67025AAFB580)
Subject:
South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID: L 2019-LLR-0096)
Sent Date:
12/9/2019 5:20:19 PM Received Date:
12/9/2019 5:20:00 PM From:
Galvin, Dennis Created By:
Dennis.Galvin@nrc.gov Recipients:
"Drew Richards (amrichards@stpegs.com)" <amrichards@stpegs.com>
Tracking Status: None "Dixon-Herrity, Jennifer" <Jennifer.Dixon-Herrity@nrc.gov>
Tracking Status: None "Nic Boehmisch (nboehmisch@stpegs.com)" <nboehmisch@stpegs.com>
Tracking Status: None Post Office:
CH2PR09MB3957.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3661 12/9/2019 5:20:00 PM Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date: