Provides Addl Info to 800512 Responses to IE Bulletin 80-04. Evaluation of Scoping Studies Will Be Completed by Approx 800523 W/Full Response to Item 1 Provided by 801001.Review of Westinghouse Input Re Item 2 to Be Completed by 800701
ML13316B729
Person / Time
Site: San Onofre 
Issue date: 05/19/1980
From: Ottoson H
SOUTHERN CALIFORNIA EDISON CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
IEB-80-04, IEB-80-4, TAC-44652, TAC-46652, NUDOCS 8005280574
Download: ML13316B729 (3)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8005280574 DOC.DATE: 80/05/19 NOTARIZED: NO DOCKET #

FACIL:50-206 San Onofre Nuclear Station, Unit 1, Southern Californ 05000206 AUTH,.NAME AUTHOR AFFILIATION OTTOSONH.L, Southern California Edison Co.

RECIP.NAME RECIPIENT AFFILIATION ENGELKENR,H.

Region 5, San Francisco, Office of the Director

SUBJECT:

Provides addl.info to 800512 responses to IE Bulletin 80-04, Evaluation of scoping studies.will be completed by approx 800523 w/full response to Item 1 provided by 801001,Review of Westinghouse input re Item 2 to be completed by 800701.,

DISTRIBUTION CODE: A0018 COPIES RECEIVED:LTR 1 ENCL

- SIZE:.2.)

TITLE: General Distribution for after Issuance of Operating L-ic NOTES:__eA ae.L44u (aiL4 s4 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION:

05 BC c 16 #2 7

7 INTERNAL; 01 102 NRC POR 1

12 I&E 2

15 CORE PERF BR 1

17 ENGR BR 1

18 REAC SFTY BR 1

19 PLANT SYS BR 1

20 EEB 21 EFLT TRT SYS 1

EPS-DOR 1

OELD 1

STS GROUP LEADR 1

rEXTERNAL: 03 LPDR 1

1 04 NSIC 1

23 ACRS.

16 1

TOTA 9 1980 TOTAL NUMBER OF COPIES REQUIRED:' LTTR -.r ENCL.

ff

Southern California Edison Company P 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 May 19, 1980 U. S. Nuclear Regulatory Commission Attention:

R. H. Engelken, Director Office of Inspection and Enforcement Region V Suite 202, Walnut Creek Plaza 1990 North California Boulevard Walnut Creek, California 94596 Gentlemen:

Subject:

Docket No. 50-206 IE Bulletin 80-04, Analysis of a PWR Main Steam Line Break With Continued Feedwater Addition San Onofre Nuclear Generating Station Unit 1 By letter dated May 12, 1980, we provided our responses to IE Bulletin 80-04. The purpose of this letter is to (1) provide further information relative to our response to Item 1 of the Bulletin, and (2) reschedule the submittal of our response to Item 2 of the Bulletin.

Our May 12, 1980 letter indicated that information relative to Item 1 of IE Bulletin 80-04, regarding containment pressure response following a Main Steam Line Break (MSLB) was being prepared in conjunction with the request received from the Office of Nuclear Reactor Regulation (NRR) by letter dated December 21, 1979, relative to the effect of Auxiliary Feedwater System (AFWS) automation on the MSLB accident. Our response referenced previous cor respondence with NRR on the subject dated January 16, 1980 and April 29, 1980.

In particular, our April 29, 1980 letter indicated that in order to provide results as early as possible in response to the NRC request of December 21, 1979, scoping studies of the MSLB accident regarding containment pressure response, were being performed and that it was expected that these scoping studies would be completed by May 16, 1980, while the date for submit ting the complete analytical results would remain as October 1, 1980, as indicated in our January 16, 1980 letter. By letter dated April 18, 1980, we indicated that prompt notification would be made to the NRC Office of Inspec tion and Enforcement, Region V, in accordance with the San Onofre Unit 1 Technical Specifications, if the results of the scoping studies indicate a need to provide remedial actions or corrective measures.

During a meeting held in Bethesda, Maryland on May 13, 1980 with members of the NRC staff, we indicated that additional scoping study cases were being evaluated and that these cases were to be completed by approxi mately May 23, 1980.

During the meeting, we committed to provide NRR with the results of the scoping studies, including the additional cases, when they are 8o528o7'

R. H. Engelken,Directo May 19, 1980 completed (i.e., approximately May 23, 1980).

It is our intention to also provide the results of the scoping studies to NRC Region V in partial response to Item 1 of the IE Bulletin 80-04.

A full response to Item 1 of the Bulletin will be provided by October 1, 1980, in conjunction with the submittal of the complete analytical results as indicated in our January 16, 1980 letter.

As indicated in our April 18, 1980 letter, a determination will be made concerning the reportability of the results of the scoping studies in accordance with the Technical Specifications. Our determination will accompany the submittal of the results of the scoping studies to the NRC Region V.

In response to Item 2 of IEBulletin 80-04, our May 12, 1980 letter indicated that a review of the core response due to a MSLB was being conducted and the results of that review would be provided by May 16, 1980. As part of this review, Westinghouse has provided input which is generic in nature.

Accordingly, additional time is required to review the applicability of the Westinghouse input relative to San Onofre Unit 1. It is expected that this additional review can be completed by July 1, 1980; therefore, our response to Item 2 of the Bulletin will be provided by that date.

If you have any questions or desire further information, please contact me.

Very ruly yours, H. 4L.

Ottoson Manager of Nuclear Operations D M. Crutchfield (NRR)

NRC Office of Inspection and Enforcement (Washington, D.C.)