ML13323A395
| ML13323A395 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 04/29/1980 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Papay L SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML13323A394 | List: |
| References | |
| NUDOCS 8007020158 | |
| Download: ML13323A395 (2) | |
See also: IR 05000361/1980006
Text
1V5Z7C
o
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIA BOULEVARD
SUITE 202, WALNUT CREEK PLAZA
WALNUT CREEK, CALIFORNIA 94596
APR 2S 1980
Docket Nos. 50-361
50-362
Southern California Edison Company
P. 0. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention:
Dr. L. T. Papay
Vice President, Advanced Engineering
Gentlemen:
Subject:
NRC Inspection at San Onofre Units 2 and 3
This refers to the inspections conducted by Mr. R. J. Pate of this
office during the period March 3-17 and 21-28, of activities authorized
by NRC Construction Permit Nos. CPPR-97 and 98, and to the discussions of
his findings held with Mr. D. E. Nunn and other members of your staff on
March 7, 21, and 27, 1980.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, inter
views with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix A
and Notice of Deviation, enclosed herewith as Appendix B. These items
of noncompliance have been categorized into a level as described in our
correspondence to all NRC licensees dated December 31, 1974.
This notice is sent to you pursuant to the provisions of Section 2.201,
of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office, within
thirty (30) days of your receipt of this notice, a written statement or
explanation in reply including (1) corrective steps which have been
taken by you and the results achieved; (2) corrective steps which will
be taken to avoid further violations; and (3) the date when full compliance
will be achieved.
APR
31O8
Dr. L. T. Papay
-
2
In accordance with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room. If this report contains any information that you believe
to be proprietary, it is necessary that you submit a written application
to this office, within 30 days of the date of this letter, requesting
that such information be withheld from public disclosure. The application
must include a full statement of the reasons why it is claimed that the
information is proprietary. The application should be prepared so that
any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will also
be placed in the Public Document Room. If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
G. S. Sp ncer, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
B. Notice of Deviation
C. IE Inspection Report
Nos. 50-361/80-06
50-362/80-04
cc w/o enclosure C:
R. Dretch, Vice President
Nuclear Engineering & Operations SCE