Advises of Five Remaining nonsafety-grade Components in Auxiliary Feedwaer Initiation & Flow Indication Circuits. Exceptions to NUREG-0737 Item II.E.1.2 long-term Requirements & Schedule for Upgrading safety-grade Listed
ML13317A700
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 10/16/1981
From: Baskin K
Southern California Edison Co
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TAC-44652, TASK-2.E.1.2, TASK-TM NUDOCS 8110200721
Download: ML13317A700 (2)


Text

Southern California Edison Company P. 0.

BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 K. P. BASKIN TELEPHONE MANAGEROF NUCLEAR ENGINEERING, October 16, 1981 213) 572-1401 SAFETY, AND LICENSING Director, Office of Nuclear Reactor Regulation Attention: D. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Gentlemen:

Subject:

Docket No. 50-206 NUREG-0737 Action Plan Item II.E.1.2 Auxiliary Feedwater System Automatic Initiation and Flow Indication San Onofre Nuclear Generating Station Unit 1

Reference:

1. Letter, K. P. Baskin (SCE) to D. M. Crutchfield (NRC),

Automatic Initiation of Auxiliary Feedwater System, April 29, 1980 On September 29, 1981, Mr. Stanley Nowicki of your staff requested that we provide a written commitment to meet the long term requirements of NUREG-0737 Item II.E.1.2; specifically, safety-grade auxiliary feedwater automatic initiation and flow indication system. By Reference 1, we provided a commitment to install safety-grade automatic auxiliary feedwater initiation and flow indication systems during an outage on or after January 1, 1981 (NUREG-0737 revised this date to July 1, 1981) to the extent possible within the constraints of safety-grade equipment availability. In fact, such systems were installed prior to the unit being returned tp power.from the last refueling/maintanence outage on June 15, 1981.

As of October 1, 1981, there remain five (5) non-safety-grade components in the auxiliary feedwater initiation and flow indication circuits. Exceptions to NUREG-0737 II.E.1.2 long term requirements, and our schedule for upgrading to safety-grade are listed below:

1. One (1) HFA and two (2) HGA commercial grade relays were installed in 480 V switchgear 1 and 3. These relays will be replaced with safety-grade components by the end of the planned steam generator inspection outage scheduled for 6 effective full power months from n

June 15, 1981.

8 10200721 8110-16 PDR ADOCK 05000206

Mr. D. M. Crutchfield

-2

2. One (1) commercial grade ammeter and one (1) commercial grade transducer were installed in cabinet C71 and 480 V switchgear 1, respectively. Safety-grade components were ordered and took approximately 8 months for delivery from date of purchase. Upon arrival, the transducer was found to be damaged.

The transducer will have to be reordered with an estimated delivery time of 8 months. The safety-grade components will be installed at the first outage of sufficient duration following receipt at the plant.

If you have any questions, please let me know.

Very truly yours,