L-MT-13-053, 0000-0146-5423-SRLR, Rev. 1, Supplemental Reload Licensing Report for Monticello, Reload 26 Cycle 27 Extended Power Uprate (EPU)
| ML13191A569 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 01/31/2013 |
| From: | Global Nuclear Fuel |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| L-MT-13-053, TAC MD9990, TAC ME3145 0000-0146-5423-SRLR, Rev 1 | |
| Download: ML13191A569 (75) | |
Text
L-MT-13-053 ENCLOSURE 3 MONTICELLO NUCLEAR GENERATING PLANT CYCLE 27 SUPPLEMENTAL RELOAD LICENSING REPORT 74 pages follow
GNFý Global Nuclear Fuel A Joint Venture of GE, Toshiba, & Hitachi 0000-0146-5423-SRLR Revision 1 Class I January 2013 Supplemental Reload Licensing Report for Monticello Reload 26 Cycle 27 Extended Power Uprate (EPU)
Copyright 2013 Global Nuclear Fuel-Americas, LLC All Rights Reserved
Monticello 0000-0146-5423-SRLR Reload 26 Revision 1 Important Notice Regarding Contents of This Report Please Read Carefully This report was prepared by Global Nuclear Fuel - Americas, LLC (GNF-A) solely for use by Northern States Power Company (NSP) ("Recipient") in support of the operating license for Monticello (the "Nuclear Plant"). The information contained in this report (the "Information") is believed by GNF-A to be an accurate and true representation of the facts known by, obtained by or provided to GNF-A at the time this report was prepared.
The only undertakings of GNF-A respecting the Information are contained in the contract between Recipient and GNF-A for nuclear fuel and related services for the Nuclear Plant (the "Fuel Contract") and nothing contained in this document shall be construed as amending or modifying the Fuel Contract. The use of the Information for any purpose other than that for which it was intended under the Fuel Contract, is not authorized by GNF-A. In the event of any such unauthorized use, GNF-A neither (a) makes any representation or warranty (either expressed or implied) as to the completeness, accuracy or usefulness of the Information or that such unauthorized use may not infringe privately owned rights, nor (b) assumes any responsibility for liability or damage of any kind which may result from such use of such information.
This report supports the licensing work done for the Nuclear Plant EPU license.
Page 2
Monticello 0000-0146-5423-SRLR Reload 26 Revision I Acknowledgement The engineering and reload licensing analyses, which form the technical basis of this Supplemental Reload Licensing Report, were performed by GNF-A/GEH Nuclear Analysis personnel.
The Supplemental Reload Licensing Report was prepared by L. Gaul. This document revision has been verified by Rich McCord.
Page 3
Monticello 0000-0146-5423-SRLR Reload 26 Revision 1 Table of Contents
- 1. Plant Unique Items 5
- 2.
Reload Fuel Bundles 6
- 3.
Reference Core Loading Pattern 6
- 4.
Calculated Core Effective Multiplication and Control System Worth 7
- 5.
Standby Liquid Control System Shutdown Capability 7
- 6.
Reload Unique Anticipated Operational Occurrences (AOO) Analysis Initial Condition Parameters 7
- 7.
Selected Margin Improvement Options 8
- 8.
Operating Flexibility Options 9
- 9.
Core-wide AOO Analysis Results' 9
- 10. Rod Withdrawal Error AOO Summary 10
- 12. Overpressurization Analysis Summary 12
- 13. Fuel Loading Error Results 13
- 14. Control Rod Drop Analysis Results 13
- 15. Stability Analysis Results 13
- 16. Loss-of-Coolant Accident Results 17 Appendix A Analysis Conditions 57 Appendix B Thermal-Mechanical Compliance 58 Appendix C Decrease in Core Coolant Temperature Event 59 Appendix D Off-Rated Limits 60 Appendix E Mislocated Fuel Loading Error 64 Appendix F Turbine Trip with Bypass and Degraded Scram 65 Appendix G Monticello Non-Standard SRLR Items 66 Appendix H TRACG04 AOO Supplementary Information 68 Appendix I NEDC-33173P-A Supplementary Information 69 Appendix J List of Acronyms 71 Page 4
Monticello 0000-0146-5423-SRLR Reload 26 Revision I The basis for this report is General Electric Standard Application for Reactor Fuel, NEDE-240 11-P-A-19, May 2012; and the U.S. Supplement, NEDE-2401 1-P-A-19-US, May 2012.
A proprietary Fuel Bundle Information Report (FBIR) supplements this licensing report. The FBIR specifies the thermal-mechanical linear heat generation rate limits and also provides a description of the fuel bundles to be loaded. The document number for this report is 0000-0146-5423-FBIR.
- 1.
Plant Unique Items Appendix A: Analysis Conditions Appendix B: Thermal-Mechanical Compliance Appendix C: Decrease in Core Coolant Temperature Event Appendix D: Off-Rated Limits Appendix E: Mislocated Fuel Loading Error Appendix F: Turbine Trip with Bypass and Degraded Scram Appendix G: Monticello Non-Standard SRLR Items Appendix H: TRACG04 AOO Supplementary Information Appendix I: NEDC-33 173P-A Supplementary Information Appendix J: List of Acronyms Page 5
Monticello PI-lnnti9M 0000-0146-5423-SRLR Revision 1
- 2.
Reload Fuel Bundles FuelType Cycle Number Loaded Irradiated:
GE 14-P 1ODNAB392-16GZ-1OOT-145-T6-2931 (GE 14C) 24 9
GEI4-PIODNAB392-17GZ-1OOT-145-T6-2932 (GEI4C) 24 11 GEl 4-PIODNAB392-16GZ-1OOT-145-T6-2931 (GE14C) 25 40 GE I 4-PI ODNAB424-14GZ-I OOT-I 45-T6-3 100 (GE I 4C) 25 16 GE14-P1ODNAB375-16GZ-1OOT-145-T6-3101 (GEI4C) 25 52 GE 14-PI ODNAB392-16GZ-1OOT-145-T6-3102 (GE 14C) 25 40 GEI4-P1ODNAB391-12GZ-IOOT-145-T6-3103 (GE14C) 25 16 GE 14-PI ODNAB373-16GZ-1OOT-145-T6-3375 (GE 14C) 26 32 GEI4-P1ODNAB391-16GZ-1OOT-145-T6-3376 (GE14C) 26 40 GEI4-PIODNAB391 -15GZ-1 00T-145-T6-3377 (GE14C) 26 32 GE I4-P 1 ODNAB391-12GZ-1 00T-I 45-T6-3378 (GEl 4C) 26 44 New:
GE 14-P I ODNAB389-11 GZ-I OOT-1 45-T6-4178 (GE 1 4C) 27 24 GEI4-P1ODNAB386-16GZ-1OOT-145-T6-4177 (GEl4C) 27 24 GE 14-P 1ODNAB386-16GZ-1OOT-145-T6-4176 (GE 14C) 27 48 GE 14-P 1 ODNAB3 72-17GZ-I 00T-145-T6-4175 (GE 14C) 27 56 Total:
484
- 3.
Reference Core Loading Pattern Core Average Cycle Exposure Exposure 30776 MWd/MT 12595 MWd/MT Nominal previous end-of-cycle exposure:
(27919 MWd/ST)
(11426 MWd/ST)
Minimum previous end-of-cycle exposure (for cold 30326 MWd/MT 12145 MWd/MT shutdown considerations):
(27511 MWd!ST)
(11018 MWd/ST) 17040 MWd/MT 0 MWd/MT Assumed reload beginning-of-cycle exposure:
(15459 MWd/ST)
(0 MWd/ST)
Assumed reload end-of-cycle exposure (rated 30929 MWd/MT 13889 MWd/MT conditions):
(28059 MWd/ST)
(12600 MWd/ST)
Reference core loading pattern:
Figure 1 Page 6
Monticello Reload 26 0000-0146-5423-SRLR Revision I
- 4.
Calculated Core Effective Multiplication and Control System Worth Beginning of Cycle, keffective Uncontrolled (20'C) 1.110 Fully controlled (20 0C) 0.955 Strongest control rod out (most reactive condition, 20'C) 0.987 R, Maximum increase in strongest rod out reactivity during the cycle (Ak) 0.000 0 MWd/MT Cycle exposure at which R occurs (0 MWd/ST)
- 5.
Standby Liquid Control System Shutdown Capability Boron (ppm)
Shutdown Margin (Ak)
(at 20(C)
(at 1601C, Xenon Free)
Analytical Requirement Achieved 660
>_0.010 0.021
- 6.
Reload Unique Anticipated Operational Occurrences (AOO) Analysis Initial Condition Parameters' Operating domain: LCF (HBB)
Exposure range
Peaking Factors Fuel Bundle Bundle Initial Local Radial Axial R-Factor Power Flow Design (MWt)
(1000 lb/hr)
MCPR GE14C 1.0 1.44 1.32 0.975 5.966 83.8 1.58 Exposure range designation is defined in Table 7-1. Application condition number is defined in Section 11.
Page 7
Monticello PIn*
- lrA'*
0000-0146-5423-SRLR Revision I Operating domain: ICF (UB)
Exposure range
Peaking Factors Fuel Bundle Bundle Initial Design Local Radial Axial R-Factor Power Flow Design___
_(MWt)
(1000 lb/hr)
MCPR GE14C 1.0 1.41 1.25 0.974 5.839 111.2 1.87 Operating domain: LCF (UB)
Exposure range
Peaking Factors Fuel Bundle Bundle Initial Design Local Radial Axial R-Factor Power Flow Design____
(MWt)
(1000 lb/hr)
MCPR GEI4C 1.0 1.40 1.35 0.975 5.798 83.2 1.69
- 7.
Selected Margin Improvement Options 2 Recirculation pump trip:
No Rod withdrawal limiter:
No Thermal power monitor:
Yes Improved scram time:
Yes (Option B)
Measured scram time:
No Exposure dependent limits:
No Exposure points analyzed:
I Table 7-1 Cycle Exposure Range Designation Name Exposure Range 3 BOC to EOC BOC27 to EOC27 2 Refer to the GESTAR basis document identified at the beginning of this report for the margin improvement options currently supported therein.
3 End of Rated (EOR) is defined as the cycle exposure corresponding to all rods out, 100% power/100% flow, and normal feedwater temperature. For plants without mid-cycle OLMCPR points., EOR is not applicable.
Page 8
Monticello 0000-0146-5423-SRLR Reload 26 Revision I
- 8.
Operating Flexibility Options 4 The following information presents the operational domains and flexibility options which are supported by the reload licensing analysis.
Extended Operating Domain (EOD):
Yes EOD type: Maximum Extended Load Line Limit (MELLLA)
Minimum core flow at rated power:
99.0 %
Increased Core Flow:
Yes Flow point analyzed throughout cycle:
105.0 %
Feedwater Temperature Reduction:
No ARTS Program:
Yes Single Loop Operation:
Yes Equipment Out of Service:
Safety/relief valves Out of Service:
Yes (credit taken for 5 valves)
PROOS Yes
- 9.
Core-wide AOO Analysis Results 5,6 Methods used: GEXL-PLUS,. TRACG04 4 Refer to the GESTAR basis document identified at the beginning of this report for the operating flexibility options currently supported therein.
5 Exposure range designation is defined in Table 7-1. Application condition number is defined in Section 11.
6 The Q/A (% rated) output is not available from TRACG04, so the Simulated Thermal Power (STP) (% rated) is shown.
Page 9
Monticello 0000-0146-5423-SRLR Dx ;ýr; 1
ý V"
Operating domain: ICF (UB)
Exposure range
Uncorrected ACPR1ICPR Event Flux STP
(% rated) (% rated)
GE14C Fig.
FW Controller Failure 548.5 114.4 0.238 2
Turbine Trip with Bypass 621.3 110.3 0.291 3
Turbine Trip w/o Bypass 550.8 108.5 0.228 4
Load Rejection w/o Bypass 335.4 106.2 0.169 5
Inadvertent HPCI /L8 530.8 120.5 0.248 6
- 10. Rod Withdrawal Error AOO Summary The Rod Withdrawal Error (RWE) event was analyzed in the GE BWR Licensing Report Average Power Range Monitor, Rod Block Monitor and Technical Specification hnprovement (ARTS) Program for Monticello Nuclear Generating Plant, NEDC-30492-P, April 1984.
RWE Results:
RBM Setpoint (%)
ACPR 114.0 0.25 The more limiting of the cycle specific and the generic ACPR values are reported in the table above. The RWE OLMCPR is determined by adding the ACPR for the desired RBM setpoint from the table above to the SLMCPR in Section 11.
The ITSP and LTSP MCPR limits associated with the HTSP reported in the above table are bounded by the Kp limits for this cycle.
The ARTS RWE analysis validated that the following MCPR values provide the required margin for full withdrawal of any control rod during this cycle:
For Power < 90%: MCPR > 1.70 For Power > 90%: MCPR > 1.40 The RBM operability requirements have been evaluated and shown to be sufficient to ensure that the SLMCPR and cladding 1% plastic strain criteria will not be exceeded in the event of a RWE.
Page 10
Monticello 0000-0146-5423-SRLR PaAcn 1
ý Wa
1.15 Single Loop Operation (SLO) safety limit:
1.15 Stability MCPR Design Basis:
See Section 15 See Section 16 (Initial MCPR)
Non-pressurization Events:
Exposure range: BOC to EOC All Fuel Types Rod Withdrawal Error (114.0 % RBM Setpoint) 1.40 Loss of Feedwater Heating 1.34 Fuel Loading Error (Mislocated)
Not Limiting Fuel Loading Error (Misoriented) 1.37 Rated Equivalent SLO Pump Seizure '0 1.45 7 Exposure range designation is defined in Table 7-1.
8 For SLO., the MCPR operating limit is equal to the two loop value.
9 The safety limit values presented include a 0.03 adder in accordance with extended operating domain licensing commitments up to and including operation in the MELLLA+ operating domain.
10 The cycle-independent OLMCPR for the recirculation pump seizure event for GEI4C is 1.62 based on the cycle-specific SLO SLMCPR. When adjusted for the off-rated power/flow conditions of SLO, this limit corresponds to a rated OLMCPR of 1.45. This limit does not require an adjustment for the SLO SLMCPR.
Page 11
Monticello Reln P,
e I
.s 0000-0146-5423-SRLR Revikinn 1 Limiting Pressurization Events OLMCPR Summary Table: t Appi.
Cond.
Exposure Range Option A Option B GE14C GE14C I
Base Case BOC to EOC 1.74 1.62 Pressurization Events: 12 Operating domain: ICF (UB)
Exposure range
Option A Option B GE14C GE14C FW Controller Failure Not Limiting Not Limiting Turbine Trip with Bypass 1.62 1.62 Turbine Trip w/o Bypass Not Limiting Not Limiting Load Rejection w/o Bypass Not Limiting Not Limiting Inadvertent HPCI /L8 1.74 1.54
- 12. Overpressurization Analysis Summary 13 Event Psi Pdome Pv Plant (psig)
(psig)
(psig)
Response
MSIV Closure (Flux Scram) - ICF (HBB) 1321 1327 1351 Figure 7 MSIV Closure (Flux Scram) - LCF (HBB) 1306 1312 1333 Figure 8 1 Each application condition (Appl. Cond.) covers the entire range of licensed flow and feedwater temperature unless specified otherwise. The OLMCPR values presented apply to rated power operation based on the two loop operation safety limit MCPR.
12 Application condition numbers shown for each of the following pressurization events represent the application conditions for which this event contributed in the determination of the limiting OLMCPR value.
" Overpressure calculated at an initial dome pressure of 1010 psig.
Page 12
Monticello Reload 26 0000-0146-5423-SRLR Reviqinn 1
- 13. Fuel Loading Error Results Variable water gap misoriented bundle analysis: Yes 14 Misoriented Fuel Bundle ACPR GE 14-PI ODNAB373-16GZ-OOT-145-T6-3375 (GE 14C) 0.21 GE 14-PIODNAB391-16GZ-1OOT-145-T6-3376 (GEI4C) 0.15 GEI4-PIODNAB391-15GZ-IOOT-145-T6-3377 (GE14C) 0.07 GE14-PIODNAB391-12GZ-100T-145-T6-3378 (GE14C) 0.15 GEI4-P1ODNAB372-17GZ-1OOT-145-T6-4175 (GE14C) 0.21 GE 14-P 1ODNAB386-16GZ-I0OT-145-T6-4176 (GE 14C) 0.18 GE 14-P 1ODNAB386-16GZ-IOOT-145-T6-4177 (GE 14C) 0.22 GEI 4-PI ODNAB3 89-11 GZ-I OOT-I45-T6-4178 (GE 1 4C) 0.20
- 14. Control Rod Drop Analysis Results This is a banked position withdrawal sequence plant, therefore, the control rod drop accident analysis is not required. NRC approval is documented in NEDE-2401 I-P-A-US.
- 15. Stability Analysis Results 15.1 Stability Option III Solution Monticello has implemented BWROG Long Term Stability Solution Option III using the Oscillation Power Range Monitor (OPRM) as described in Reference I in Section 15.4. The plant specific Hot Channel Oscillation Magnitude (HCOM) (Reference 2 in Section 15.4) and other cycle specific stability parameters are used in the Cycle 27 Option III stability evaluation. Backup Stability Protection (BSP) regions are used by the plant in the event that the Option III OPRM system is declared inoperable.
The following Option III OPRM stability setpoint determination described in Section 15.2 and the implementation of the associated BSP Regions described in Section 15.3 provide the stability licensing bases for Monticello Cycle 27.
14 Includes a 0.02 penalty due to variable water gap R-factor uncertainty.
Page 13
Monticello 0000-0146-5423-SRLR Reload 26 Revision 1 15.2 Detect and Suppress Evaluation A reload Option III evaluation has been performed in accordance with the licensing methodology described in Reference 3 in Section 15.4. The stability based OLMCPR is determined for two conditions as a function of OPRM amplitude setpoint. The two conditions evaluated are: (1) a postulated oscillation at 45% rated core flow quasi steady-state operation (SS), and (2) a postulated oscillation following a two recirculation pump trip (2PT) from the limiting rated power operation state point.
The OPRM-setpoint-dependent OLMCPR(SS) and OLMCPR(2PT) values are calculated for Cycle 27 in accordance with the BWROG regional mode DIVOM guidelines described in Reference 4 in Section 15.4. The Cycle 27 Option III evaluation provides adequate protection against violation of the SLMCPR for the two postulated reactor instability events as long as the plant OLMCPR is equal to or greater than OLMCPR(SS) and OLMCPR(2PT) for the selected OPRM setpoint in Table 15.2-2.
The relationship between the OPRM Successive Confirmation Count Setpoint and the OPRM Amplitude Setpoint is provided in Table E-1 of Reference 3 in Section 15.4 and Table 15.2-1.
For intermediate OPRM Amplitude Setpoints, the corresponding OPRM Successive Confirmation Count Setpoints have been obtained by using linear interpolation.
The OPRM setpoints for TLO are conservative relative to SLO and are, therefore, bounding.
Page 14
Monticello VI*
A*
,-,14" 0000-0146-5423-SRLR P
A;;
1 Table 15.2-1 Relationship between OPRM Successive Confirmation Count Setpoint and OPRM Amplitude Setpoint Successive OPRM Confirmation Count Amplitude Setpoint Setpoint 6
>_1.04 8
>1.05 9
>Ž1.06 10
>-1.07 11
>1.08 12
>_1.09 13
>1.10 14
>1.11 15
>1.13 16
>1.14 17
>1.16 18
>_1.19 19
>Ž1.21 20
>_1.24 Page 15
Monticello Relnnd 26 0000-0146-5423-SRLR Rpviqinn 1 Table 15.2-2 OPRM Setpoint Versus OLMCPR OPRM Amplitude OLMCPR(SS)
OLMCPR(2PT)
Setpoint 1.05 1.28 1.14 1.06 1.30 1.16 1.07 1.33 1.18 1.08 1.35 1.21 1.09 1.38 1.23 1.10 1.40 1.25 1.11 1.43 1.28 1.12 1.46 1.30 1.13 1.49 1.33 1.14 1.52 1.35 OLMCPR Off-rated Rated Power Acceptance OLMCPR OLMCPR (see Criteria
@45% flow Section 11) 15.3 Backup Stability Protection The BSP region boundaries were calculated for Monticello Cycle 27 for normal feedwater temperature operation. The endpoints of the regions are defined in Table 15.3-1. The region boundaries, shown in Figure 9, are defined using the Generic Shape Function (GSF). See Reference 5 in Section 15.4.
Table 15.3-1 BSP Region Intercepts for Normal Feedwater Temperature Highest Region Boundary Power Flow Core DR Channel Intercept
(%)
(%)
DR Al 56.6 40.0
< 0.80
< 0.56 BI 42.6 33.7
< 0.80
< 0.56 A2 64.5 50.0
< 0.80
< 0.56 B2 28.6 31.2
< 0.80
< 0.56 Page 16
Monticello Reload 26 0000-0146-5423-SRLR Revision I 15.4 References
- 1. BWR Owners' Group Long-term Stability Solutions Licensing Methodology, NEDO-3 1960-A, November 1995 (including Supplement 1).
- 2. Reactor Long-Term Stability Solution Option III: Licensing Basis Hot Channel Oscillation Magnitude for Monticello Nuclear Generating Plant, GHNE-0000-0073-4167-R2,. December 2007.
- 3. Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications, Licensing Topical Report, NEDO-32465-A, August 1996.
- 4. Plant-Specific Regional Mode DIVOM Procedure Guideline, GE-NE-0000-0028-9714-RI, June 2005.
- 5. Backup Stability Protection (BSP) for Inoperable Option HII Solution, OG-02-0119-260, July 2002.
- 16. Loss-of-Coolant Accident Results 15 16.1 10CFR50.46 Licensing Results The ECCS-LOCA analysis is based on the SAFER/GESTR-LOCA methodology. The licensing results in the new cycle are summarized in the following table.
Table 16.1-1 Licensing Results Core-Wide Licensing Local Me-Wate Fuel Type Basis PCT Oxidation Reatio (OF)
Reaction
(°F)
(%)
(%)
GE14C 2140
<10.00
< 0.20 The SAFER/GESTR-LOCA analysis results are documented in Reference I for GE I4C in Section 16.4.
The RHR intertie open line analysis is documented in Reference 2 for GE14C in Section 16.4. Reference 1 for GEI4C extends the Reference 2 analysis to EPU. These analyses indicate that plant operation up to 376 MWt with the RHR intertie line open is acceptable from an ECCS performance standpoint, provided a MAPLHGR multiplier of 0.75 is implemented or that the peak bundle power does not exceed 3.9 MWt.
's Lattice numbers are defined in the Fuel Bundle Information Report Page 17
Monticello Rilnad ?6 0000-0146-5423-SRLR Rpvkinn 1 16.2 10CFR50.46 Error Evaluation The 10CFR50.46 errors applicable to the Licensing Basis PCT are shown in the following table.
Table 16.2-1 Impact on Licensing Basis Peak Cladding Temperature for GE14C IOCFR50.46 Error Notifications PCT Impact (OF) 2012-01 PRIME Code Implementation for Fuel Rod T/M
+45 Performance, Replacing GESTR Total PCT Adder (OF)
+45 After accounting for the error impact, the GE14C Licensing Basis PCT remains below the I0CFR50.46 limit of 22000F, the Local Oxidation remains below the 10CFR50.46 limit of 17%, and the Core-Wide Metal-Water Reaction remains below the 10CFR50.46 limit of 1%.
16.3 ECCS-LOCA Operating Limits The ECCS-LOCA composite MAPLHGR operating limits for all fuel bundles in this cycle are shown in the following tables.
Page 18
Monticello Relnwi 96t 0000-0146-5423-SRLR Revizinn 1 Table 16.3-1 MAPLHGR Limits Bundle Type: GEI4-PIODNAB392-16GZ-1OOT-145-T6-2931I (GE14C)
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 7357 7358 7359 7360 7361 7362 7363 0.00(0.00) 9.41 8.49 8.71 8.80 8.75 9.81 10.43 0.22(0.20) 9.33 8.53 8.74 8.83 8.79 9.75 10.41 1.10(1.00) 9.12 8.60 8.80 8.91 8.88 9.61 10.34 2.20(2.00) 9.06 8.70 8.88 9.01 8.99 9.58 10.34 3.31 (3.00) 9.08 8.80 8.97 9.12 9.11 9.61 10.37 4.41 (4.00) 9.11 8.90 9.06 9.23 9.24 9.65 10.41 5.51 (5.00) 9.15 9.00 9.14 9.31 9.36 9.70 10.46 6.61 (6.00) 9.19 9.10 9.21 9.40 9.48 9.74 10.50 7.72 (7.00) 9.23 9.19 9.30 9.50 9.59 9.78 10.53 8.82 (8.00) 9.25 9.28 9.39 9.64 9.73 9.81 10.55 9.92(9.00) 9.28 9.38 9.51 9.79 9.88 9.83 10.57 11.02 (10.00) 9.29 9.50 9.63 9.94 10.05 9.85 10.59 12.13 (11.00) 9.31 9.62 9.75 10.10 10.04 9.86 10.60 13.23 (12.00) 9.28 9.71 9.85 9.94 9.78 9.86 10.60 14.33 (13.00) 9.24 9.80 9.92 9.84 9.69 9.82 10.60 15.43 (14.00) 9.20 9.87 9.97 9.83 9.69 9.78 10.56 16.53 (15.00) 9.16 9.93 10.01 9.80 9.66 9.73 10.51 18.74 (17.00) 9.06 10.01 10.05 9.72 9.58 9.64 10.41 22.05 (20.00) 8.92 9.97 10.02 9.57 9.44 9.49 10.27 27.56 (25.00) 8.68 9.70 9.74 9.35 9.22 9.25 10.02 33.07 (30.00) 8.24 9.42 9.46 9.13 9.04 8.95 9.79 38.58 (35.00) 7.58 9.17 9.19 8.89 8.84 8.29 9.28 38.85 (35.24) 7.55 9.14 9.17 8.86 8.82 8.26 9.25 44.09 (40.00) 6.87 8.71 8.71 8.37 8.35 7.64 8.64 49.60 (45.00) 5.68 8.14 8.13 7.81 7.81 6.66 7.99 54.79 (49.71) 3.98 55.12 (50.00) 7.30 7.32 6.90 6.87 5.21 6.83 55.50 (50.35) 7.20 7.22 6.81 6.77 5.08 6.72 58.16 (52.77) 4.21 60.63 (55.00) 5.84 5.86 5.59 5.44 5.25 62.85 (57.01) 4.53 63.13 (57.27) 4.68 Page 19
Monticello Reload 26 0000-0146-5423-SRLR Revision 1 Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 7357 7358 7359 7360 7361 7362 7363 63.50 (57.61) 4.92 4.95 4.79 63.54 (57.65) 4.90 63.68 (57.77) 4.89 63.73 (57.82) 4.73 Page 20
Monticello Reload 26 0000-0146-5423-SRLR Revvkinn 1 Table 16.3-2 MAPLHGR Limits Bundle Type: GE 14-P 1ODNAB424-14GZ-1OOT-145-T6-3100 (GE 14C)
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 8482 8483 8484 8485 8486 8487 8488 0.00 (0.00) 9.41 7.87 7.91 7.89 7.80 9.81 10.49 0.22 (0.20) 9.33 7.93 7.97 7.96 7.87 9.76 10.46 1.10(1.00) 9.12 8.06 7.97 9.61 10.38 2.20(2.00) 9.06 8.11 8.16 8.18 8.10 9.58 10.36 3.31 (3.00) 9.07 8.23 9.61 10.38 4.41 (4.00) 9.10 8.38 8.43 8.36 9.65 10.41 5.51 (5.00) 9.13 8.42 8.50 8.57 8.50 9.69 10.44 6.61 (6.00) 9.17 8.53 8.61 8.70 8.64 9.73 10.47 7.72(7.00) 9.20 8.64 8.73 8.85 8.79 9.77 10.50 8.82 (8.00) 9.23 8.75 8.85 8.99 8.95 9.80 10.52 9.92 (9.00) 9.25 8.86 8.98 9.15 9.12 9.82 10.54 11.02 (10.00) 9.27 8.98 9.10 9.31 9.30 9.84 10.55 12.13 (11.00) 9.28 9.08 9.20 9.45 9.46 9.85 10.56 13.23 (12.00) 9.26 9.16 9.23 9.50 9.56 9.86 10.56 14.33 (13.00) 9.22 9.20 9.27 9.56 9.62 9.82 10.56 15.43 (14.00) 9.18 9.23 9.31 9.69 9.77 10.52 16.53 (15.00) 9.14 9.26 9.68 9.75 9.73 10.47 17.64 (16.00) 9.09 9.30 9.39 9.73 9.80 9.68 10.42 18.74 (17.00) 9.05 9.43 9.77 9.83 9.63 10.37 19.84 (18.00) 9.00 9.39 9.46 9.79 9.81 9.58 20.94 (19.00) 8.95 9.43 9.49 9.81 9.78 22.05 (20.00) 9.46 9.50 9.82 23.15 (21.00) 8.85 9.48 9.52 9.82 9.69 9.43 10.18 24.25 (22.00) 9.50 9.53 9.77 25.35 (23.00) 8.76 9.52 9.53 9.34 10.08 26.46 (24.00) 8.71 9.53 9.29 10.03 27.56 (25.00) 8.66 9.54 9.54 9.63 9.50 9.24 9.98 33.07 (30.00) 8.22 9.42 9.43 9.41 9.29 8.94 9.75 38.58 (35.00) 7.56 9.01 9.02 9.23 9.12 8.28 9.24 38.85 (35.24) 7.53 8.99 9.00 9.20 9.09 8.25 9.20 44.09 (40.00) 6.84 8.56 8.57 8.76 8.63 7.63 8.59 49.60 (45.00) 5.65 7.80 7.82 8.26 8.13 6.64 7.94 Page 21
Monticello 0000-0146-5423-SRLR 1
I 1
I v
U a.,U VI3IUII Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 8482 8483 8484 8485 8486 8487 8488 54.68 (49.61) 3.98 55.12 (50.00) 6.66 6.68 7.23 7.26 5.19 6.77 55.50 (50.35) 6.54 6.56 7.12 7.16 5.06 6.66 58.10 (52.71) 4.21 60.63 (55.00) 4.93 4.95 5.63 5.76 5.16 60.90 (55.25) 4.85 60.96 (55.30) 4.85 62.63 (56.82) 4.51 62.80 (56.97) 4.93 63.16 (57.30) 4.95 Page 22
Monticello D0,-~A ')A 0000-0146-5423-SRLR D
1 I
ýý a V.
Table 16.3-3 MAPLHGR Limits Bundle Type: GE14-PIODNAB375-16GZ-I00T-145-T6-3 101 (GE14C)
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 8482 8489 8490 8491 8492 8493 8494 0.00 (0.00) 9.41 8.40 8.40 8.45 8.35 9.81 10.35 0.22(0.20) 9.33 8.43 8.45 8.50 8.40 9.76 10.33 1.10( 1.00) 9.12 8.48 8.53 8.59 8.49 9.61 10.26 2.20(2.00) 9.06 8.60 8.62 9.58 10.26 3.31 (3.00) 9.07 8.82 8.74 9.61 10.29 4.41 (4.00) 9.10 8.72 8.88 8.87 9.65 10.33 5.51 (5.00) 9.13 8.75 8.78 8.95 9.01 9.69 10.38 6.61 (6.00) 9.17 8.82 8.86 9.04 9.12 9.73 10.42 7.72(7.00) 9.20 8.89 8.95 9.16 9.24 9.77 10.45 8.82 (8.00) 9.23 8.97 9.05 9.30 9.38 9.80 10.48 9.92(9.00) 9.25 9.07 9.17 9.44 9.53 9.82 10.50 11.02 (10.00) 9.27 9.18 9.29 9.59 9.68 9.84 10.51 12.13 (11.00) 9.28 9.29 9.41 9.74 9.68 9.85 10.52 13.23 (12.00) 9.26 9.37 9.49 9.62 9.45 9.86 10.52 14.33 (13.00) 9.22 9.45 9.56 9.54 9.40 9.82 10.52 15.43 (14.00) 9.18 9.52 9.62 9.55 9.41 9.77 10.47 16.53 (15.00) 9.14 9.58 9.67 9.39 9.73 10.43 17.64 (16.00) 9.09 9.63 9.71 9.50 9.36 9.68 10.38 18.74 (17.00) 9.05 9.67 9.74 9.47 9.33 9.63 10.33 19.84 (18.00) 9.00 9.70 9.76 9.43 9.30 9.58 20.94 (19.00) 8.95 9.66 9.73 9.39 10.23 22.05 (20.00) 9.62 9.68 23.15 (21.00) 8.85 9.57 9.63 9.43 10.13 24.25 (22.00) 9.53 9.26 9.13 25.35 (23.00) 8.76 9.48 9.21 9.34 10.03 26.46 (24.00) 8.71 9.17 9.05 9.29 27.56 (25.00) 8.66 9.38 9.42 9.13 9.01 9.24 9.93 33.07 (30.00) 8.22 9.13 9.16 8.95 8.84 8.94 9.70 38.58 (35.00) 7.56 8.91 8.94 8.73 8.60 8.28 9.17 38.85 (35.24) 7.53 8.89 8.91 8.70 8.58 8.25 9.14 44.09 (40.00) 6.84 8.40 8.40 8.21 8.13 7.63 8.52 49.60 (45.00) 5.65 7.86 7.86 7.71 7.57 6.64 7.85 Page 23
Monticello 0000-0146-5423-SRLR D
1 Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 8482 8489 8490 8491 8492 8493 8494 54.68 (49.61) 3.98 55.12 (50.00) 6.96 6.90 6.70 6.58 5.19 6.68 55.50 (50.35) 6.84 6.79 6.60 6.47 5.06 6.56 58.10 (52.71) 4.21 60.63 (55.00) 5.28 5.31 5.24 5.02 5.04 61.88 (56.14) 4.64 61.93 (56.19) 4.86 62.00 (56.24) 4.87 62.29 (56.51) 4.49 62.53 (56.72) 4.67 Page 24
Monticello Reload 26 0000-0146-5423-SRLR Revision I Table 16.3-4 MAPLHGR Limits Bundle Type: GE 14-P 1ODNAB392-16GZ-IOOT-145-T6-3102 (GE 14C)
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWdJMT (GWd/ST) 8482 8495 8496 8497 8498 8499 8500 0.00 (0.00) 9.41 8.50 8.71 8.79 8.75 9.81 10.43 0.22(0.20) 9.33 8.54 8.74 8.83 8.79 9.76 10.40 1.10(1.00) 9.12 8.61 8.80 8.91 9.61 10.33 2.20 (2.00) 9.06 8.71 8.88 9.00 8.98 9.58 10.33 3.31 (3.00) 9.07 9.10 9.10 9.61 10.36 4.41 (4.00) 9.10 8.90 9.05 9.21 9.21 9.65 10.40 5.51 (5.00) 9.13 9.01 9.12 9.28 9.33 9.69 10.44 6.61 (6.00) 9.17 9.10 9.19 9.36 9.44 9.73 10.48 7.72(7.00) 9.20 9.18 9.27 9.47 9.55 9.77 10.51 8.82 (8.00) 9.23 9.27 9.36 9.59 9.68 9.80 10.54 9.92 (9.00) 9.25 9.37 9.47 9.74 9.83 9.82 10.55 11.02 (10.00) 9.27 9.49 9.58 9.89 9.99 9.84 10.57 12.13 (11.00) 9.28 9.61 9.70 10.03 9.95 9.85 10.58 13.23 (12.00) 9.26 9.70 9.79 9.87 9.70 9.86 10.58 14.33 (13.00) 9.22 9.78 9.86 9.78 9.63 9.82 10.58 15.43 (14.00) 9.18 9.85 9.91 9.78 9.64 9.77 10.53 16.53 (15.00) 9.14 9.91 9.95 9.76 9.62 9.73 10.49 17.64 (16.00) 9.09 9.96 9.98 9.73 9.59 9.68 10.44 18.74 (17.00) 9.05 9.99 10.00 9.70 9.56 9.63 10.39 19.84 (18.00) 9.00 10.01 10.02 9.66 9.52 9.58 20.94 (19.00) 8.95 10.01 10.03 9.61 9.48 22.05 (20.00) 9.96 10.00 23.15 (21.00) 8.85 9.91 9.43 10.19 24.25 (22.00) 9.48 9.34 25.35 (23.00) 8.76 9.34 10.09 26.46 (24.00) 8.71 9.79 9.26 9.29 10.05 27.56 (25.00) 8.66 9.70 9.73 9.35 9.22 9.24 10.00 33.07 (30.00) 8.22 9.43 9.46 9.15 9.03 8.94 9.77 38.58 (35.00) 7.56 9.17 9.19 8.95 8.82 8.28 9.25 38.85 (35.24) 7.53 9.14 9.17 8.93 8.80 8.25 9.22 44.09 (40.00) 6.84 8.71 8.71 8.45 8.33 7.63 8.60 49.60 (45.00) 5.65 8.13 8.12 7.89 7.85 6.64 7.96 Page 25
Monticello Rplnad 'M 0000-0146-5423-SRLR Revioion 1 Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 8482 8495 8496 8497 8498 8499 8500 54.68 (49.61) 3.98 55.12 (50.00) 7.27 7.28 7.01 6.84 5.19 6.79 55.50 (50.35) 7.16 7.18 6.92 6.74 5.06 6.68 58.10 (52.71) 4.21 60.63 (55.00) 5.79 5.81 5.64 5.39 5.19 62.69 (56.87) 4.52 63.00 (57.16) 4.67 63.41 (57.53) 4.90 63.50 (57.61) 4.89 4.77.
63.52 (57.62) 4.89 63.66 (57.75) 4.72 Page 26
Monticello Reload 26 0000-0146-5423-SRLR Revision I Table 16.3-5 MAPLHGR Limits Bundle Type: GE 14-P 1ODNAB391-12GZ-1OOT-145-T6-3 103 (GE 14C)
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 8482 8501 8502 8503 8504 8505 8506 0.00(0.00) 9.41 8.90 8.90 9.03 8.96 9.81 10.15 0.22(0.20) 9.33 8.92 8.92 9.06 8.99 9.76 10.12 1.10(1.00) 9.12 8.97 8.97 9.11 9.08 9.61 10.02 2.20 (2.00) 9.06 9.03 9.03 9.19 9.20 9.58 10.02 3.31 (3.00) 9.07 9.09 9.27 9.32 9.61 10.05 4.41 (4.00) 9.10 9.16 9.17 9.42 9.65 10.10 5.51 (5.00) 9.13 9.23 9.24 9.44 9.52 9.69 10.15 6.61 (6.00) 9.17 9.30 9.30 9.50 9.58 9.73 10.19 7.72(7.00) 9.20 9.37 9.35 9.57 9.66 9.77 10.23 8.82 (8.00) 9.23 9.42 9.43 9.68 9.76 9.80 10.25 9.92 (9.00) 9.25 9.49 9.52 9.79 9.89 9.82 10.27 11.02 (10.00) 9.27 9.56 9.62 10.02 9.84 10.29 12.13 (11.00) 9.28 9.65 9.72 10.05 9.92 9.85 10.30 13.23 (12.00) 9.26 9.73 9.81 9.85 9.69 9.86 10.30 14.33 (13.00) 9.22 9.87 9.78 9.63 9.82 10.29 15.43 (14.00) 9.18 9.85 9.91 9.78 9.64 9.77 10.24 16.53 (15.00) 9.14 9.91 9.95 9.77 9.63 9.73 10.19 17.64 (16.00) 9.09 9.95 9.98 9.74 9.60 9.68 10.14 18.74 (17.00) 9.05 9.98 10.00 9.70 9.57 9.63 10.10 19.84 (18.00) 9.00 10.00 10.01 9.66 9.52 9.58 20.94 (19.00) 8.95 10.01 10.02 9.62 22.05 (20.00) 9.96 10.01 23.15 (21.00) 8.85 9.91 9.39 9.43 9.89 24.25 (22.00) 9.48 9.84 25.35 (23.00) 8.76 9.44 9.30 9.34 26.46 (24.00) 8.71 9.75 9.79 9.39 9.29 9.75 27.56 (25.00) 8.66 9.70 9.74 9.35 9.22 9.24 9.70 33.07 (30.00) 8.22 9.47 9.16 9.03 8.94 9.46 38.58 (35.00) 7.56 9.17 9.19 8.95 8.83 8.28 8.87 38.85 (35.24) 7.53 9.15 9.17 8.93 8.80 8.25 8.84 44.09 (40.00) 6.84 8.72 8.71 8.45 8.33 7.63 8.22 49.60 (45.00) 5.65 8.14 8.13 7.89 7.85 6.64 7.44 Page 27
Monticello 0000-0146-5423-SRLR D
- ;r I
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 8482 8501 8502 8503 8504 8505 8506 54.68 (49.61) 3.98 55.12 (50.00) 7.28 7.29 7.02 6.84 5.19 6.26 55.50 (50.35) 7.18 7.19 6.92 6.74 5.06 6.13 58.10 (52.71) 4.21 60.63 (55.00) 5.81 5.82 5.64 5.39 4.47 60.86 (55.21) 4.40 62.99 (57.14) 4.67 63.50 (57.61) 4.90 4.91 4.77 63.60 (57.70) 4.87 63.61 (57.71) 4.87 63.64 (57.73) 4.73 Page 28
Monticello VI*I
- Alf, 0000-0146-5423-SRLR D
1 Q
ýv a M" Table 16.3-6 MAPLHGR Limits Bundle Type: GE 14-P 1 ODNAB373-16GZ-IOOT-145-T6-3375 (GE 14C)
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 9552 9553 9554 9555 9556 9557 9558 0.00(0.00) 9.41 8.36 8.36 8.41 8.31 9.81 10.36 0.22 (0.20) 9.33 8.39 8.41 8.47 8.37 9.76 10.33 1.10( 1.00) 9.12 8.44 8.49 8.55 8.46 9.61 10.26 2.20 (2.00) 9.05 8.59 8.67 8.58 9.58 10.25 3.31 (3.00) 9.06 8.79 8.71 9.60 10.29 4.41 (4.00) 9.09 8.89 8.84 9.64 10.33 5.51 (5.00) 9.13 8.71 8.79 8.98 9.69 10.38 6.61 (6.00) 9.17 8.78 8.86 9.04 9.12 9.73 10.42 7.72(7.00) 9.20 8.85 8.93 9.13 9.21 9.77 10.45 8.82 ( 8.00) 9.23 8.93 9.02 9.24 9.32 9.80 10.48 9.92(9.00) 9.25 9.03 9.12 9.37 9.46 9.82 10.50 11.02 (10.00) 9.27 9.14 9.23 9.52 9.61 9.84 10.51 12.13 (11.00) 9.28 9.25 9.35 9.66 9.75 9.85 10.52 13.23 (12.00) 9.25 9.33 9.42 9.75 9.86 9.85 10.52 14.33 (13.00) 9.22 9.41 9.49 9.83 9.81 10.52 15.43 (14.00) 9.17 9.48 9.55 9.90 9.91 9.77 10.47 16.53 (15.00) 9.13 9.54 9.60 9.95 9.93 9.72 10.43 17.64 (16.00) 9.08 9.60 9.64 10.00 9.91 9.68 10.38 18.74 (17.00) 9.04 9.64 9.68 10.03 9.88 9.63 10.33 19.84 (18.00) 8.99 9.68 9.71 9.99 9.85 9.58 20.94 (19.00) 8.94 9.64 9.71 9.95 9.80 22.05 (20.00) 9.60 9.66 23.15 (21.00) 8.85 9.56 9.61 9.43 10.13 24.25 (22.00) 9.51 9.56 9.80 9.66 10.08 25.35 (23.00) 8.75 9.46 9.33 26.46 (24.00) 8.70 9.71 9.57 9.28 9.98 27.56 (25.00) 8.65 9.36 9.40 9.67 9.53 9.23 9.93 33.07 (30.00) 8.21 9.12 9.15 9.41 9.34 8.93 9.70 38.58 (35.00) 7.55 8.90 8.92 9.09 9.05 8.27 9.17 38.85 (35.24) 7.51 8.87 8.90 9.07 9.03 8.24 9.13 44.09 (40.00) 6.82 8.38 8.38 8.62 8.59 7.62 8.52 49.60 (45.00) 5.63 7.85 7.84 8.03 7.99 6.63 7.85 Page 29
Monticello RplnqCd ?A 0000-0146-5423-SRLR RE-vikinn 1 Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 9552 9553 9554 9555 9556 9557 9558 54.64 (49.57) 3.98 55.12 (50.00) 6.94 6.89 7.13 7.14 5.17 6.67 55.50 (50.35) 6.82 6.77 7.03 7.03 5.04 6.56 58.07 (52.68) 4.20 60.63 (55.00) 5.22 5.25 5.62 5.62 5.03 61.77 (56.04) 4.86 61.83 (56.09) 4.86 62.29 (56.51) 4.49 63.07 (57.22) 4.85 63.11 (57.25) 4.84 Page 30
Monticello Rfe.lnd 2tq 0000-0146-5423-SRLR Revkinn 1 Table 16.3-7 MAPLHGR Limits Bundle Type: GE 14-PI ODNAB391-1 6GZ-1OOT-145-T6-3376 (GE 14C)
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 9552 9559 9560 9561 9562 9557 9563 0.00(0.00) 9.41 8.51 8.74 8.74 8.65 9.81 10.40 0.22 (0.20) 9.33 8.55 8.77 8.77 8.69 9.76 10.37 1.10(1.00) 9.12 8.62 8.85 8.77 9.61 10.30 2.20(2.00) 9.05 8.70 8.90 8.96 8.88 9.58 10.29 3.31 (3.00) 9.06 8.78 8.97 9.07 9.01 9.60 10.33 4.41 (4.00) 9.09 8.87 9.05 9.16 9.14 9.64 10.37 5.51 (5.00) 9.13 8.96 9.12 9.25 9.27 9.69 10.41 6.61 (6.00) 9.17 9.05 9.20 9.35 9.42 9.73 10.45 7.72 (7.00) 9.20 9.14 9.29 9.45 9.55 9.77 10.49 8.82 ( 8.00) 9.23 9.24 9.56 9.66 9.80 10.51 9.92(9.00) 9.25 9.33 9.46 9.66 9.76 9.82 10.53 11.02 (10.00) 9.27 9.41 9.53 9.75 9.86 9.84 10.55 12.13 (11.00) 9.28 9.51 9.61 9.97 9.85 10.55 13.23 (12.00) 9.25 9.68 9.97 10.09 9.85 10.56 14.33 (13.00) 9.22 9.65 9.74 10.06 10.13 9.81 10.56 15.43 (14.00) 9.17 9.80 10.13 10.09 9.77 10.51 16.53 (15.00) 9.13 9.80 9.86 10.20 10.13 9.72 10.46 17.64 (16.00) 9.08 9.87 9.91 10.17 10.12 9.68 10.42 18.74 (17.00) 9.04 9.93 9.95 10.09 10.07 9.63 10.37 19.84 (18.00) 8.99 9.97 9.98 9.58 20.94 (19.00) 8.94 10.00 10.00 9.98 9.95 22.05 (20.00) 9.97 9.97 23.15 (21.00) 8.85 9.93 9.92 9.43 10.17 24.25 (22.00) 9.88 9.80 9.76 25.35 (23.00) 8.75 9.74 9.33 10.07 26.46 (24.00) 8.70 9.77 9.68 9.64 9.28 10.02 27.56 (25.00) 8.65 9.72 9.72 9.62 9.59 9.23 9.97 33.07 (30.00) 8.21 9.48 9.48 9.36 9.32 8.93 9.74 38.58 (35.00) 7.55 9.22 9.22 9.16 9.12 8.27 9.22 38.85 (35.24) 7.51 9.19 9.20 9.14 9.10 8.24 9.19 44.09 (40.00) 6.82 8.78 8.79 8.75 8.70 7.62 8.57 49.60 (45.00) 5.63 8.19 8.20 8.27 8.22 6.63 7.92 Page 31
Monticello O
I, A1 ) A*,4O 0000-0146-5423-SRLR D
1 l\\a.,
-U IV aI %UI 1
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 9552 9559 9560 9561 9562 9557 9563 54.64 (49.57) 3.98 55.12 (50.00) 7.26 7.27 7.39 7.40 5.17 6.75 55.50 (50.35) 7.16 7.17 7.29 7.30 5.04 6.63 58.07 (52.68) 4.20 60.63 (55.00) 5.77 5.80 5.96 5.96 5.13 62.54 (56.74) 4.51 63.36 (57.48) 4.89 63.50 (57.61) 4.88 5.06 5.06 63.51 (57.62) 4.88 64.05 (58.11) 4.89 64.10 (58.15) 4.87 Page 32
Monticello Reload 26 0000-0 146-5423-SRLR Revision 1 Table 16.3-8 MAPLHGR Limits Bundle Type: GE14-PiODNAB391-15GZ-I00T-145-T6-3377 (GE14C)
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd[MT (GWd/ST) 9552 9564 9565 9566 9567 9557 9568 0.00 (0.00) 9.41 8.52 8.53 8.48 8.39 9.81 10.33 0.22(0.20) 9.33 8.56 8.57 8.53 8.44 9.76 10.31 1.10( 1.00) 9.12 8.64 8.64 8.62 8.53 9.61 10.23 2.20 (2.00) 9.05 8.74 8.74 8.75 8.66 9.58 10.22 3.31 (3.00) 9.06 8.89 8.81 9.60 10.26 4.41 (4.00) 9.09 8.91 8.92 9.00 8.96 9.64 10.30 5.51(5.00) 9.13 9.00 9.01 9.11 9.12 9.69 10.34 6.61 (6.00) 9.17 9.09 9.10 9.23 9.29 9.73 10.38 7.72 (7.00) 9.20 9.19 9.20 9.35 9.44 9.77 10.42 8.82 (8.00) 9.23 9.28 9.29 9.47 9.57 9.80 10.45 9.92 (9.00) 9.25 9.38 9.39 9.58 9.68 9.82 10.47 11.02 (10.00) 9.27 9.46 9.47 9.70 9.80 9.84 10.48 12.13 (11.00) 9.28 9.56 9.57 9.83 9.94 9.85 10.49 13.23 (12.00) 9.25 9.63 9.65 9.96 10.08 9.85 10.49 14.33 (13.00) 9.22 9.70 9.72 10.06 10.11 9.81 10.49 15.43 (14.00) 9.17 9.79 10.15 10.11 9.77 10.44 16.53 (15.00) 9.13 9.85 9.87 10.22 10.15 9.72 10.40 17.64 (16.00) 9.08 9.91 9.93 10.17 10.14 9.68 10.35 18.74 (17.00) 9.04 9.96 9.97 10.10 10.08 9.63 10.30 19.84(18.00) 8.99 10.00 10.00 10.04 9.58 20.94 (19.00) 8.94 10.02 10.02 22.05 (20.00) 9.98 9.98 23.15 (21.00) 8.85 9.93 9.86 9.83 9.43 10.10 24.25 (22.00) 9.77 25.35 (23.00) 8.75 9.82 9.74 9.33 10.00 26.46 (24.00) 8.70 9.77 9.65 9.28 9.95 27.56 (25.00) 8.65 9.72 9.72 9.63 9.59 9.23 9.90 33.07 (30.00) 8.21 9.48 9.48 9.37 9.33 8.93 9.67 38.58 (35.00) 7.55 9.22 9.22 9.17 9.12 8.27 9.13 38.85 (35.24) 7.51 9.19 9.20 9.15 9.10 8.24 9.10 44.09 (40.00) 6.82 8.78 8.78 8.75 8.70 7.62 8.48 49.60 (45.00) 5.63 8.19 8.20 8.26 8.16 6.63 7.80 Page 33
Monticello D
I,,IA 1)-J 0000-0146-5423-SRLR D *L; e;*.
I Ial 4'-
.Na..
V
.3 I
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 9552 9564 9565 9566 9567 9557 9568 54.64 (49.57) 3.98 55.12 (50.00) 7.26 7.26 7.38 7.38 5.17 6.62 55.50 (50.35) 7.15 7.16 7.28 7.28 5.04 6.51 58.07 (52.68) 4.20 60.63 (55.00) 5.77 5.78 5.94 5.94 4.97 62.11 (56.35) 4.48 63.41 (57.53) 4.88 63.42 (57.53) 4.88 63.50 (57.61) 5.04 5.04 63.99 (58.05) 4.89 64.04 (58.09) 4.87 Page 34
Monticello 0000-0146-5423-SRLR D,
1 I
vIIau Il, ai*"i.
I Table 16.3-9 MAPLHGR Limits Bundle Type: GE 14-PI ODNAB391-1 2GZ-1OOT-145-T6-3378 (GE 14C)
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 9552 9569 9570 9571 9572 9557 9573 0.00(0.00) 9.41 8.94 8.95 8.98 8.90 9.81 10.12 0.22 (0.20) 9.33 8.97 8.98 9.01 8.93 9.76 10.09 1.10( 1.00) 9.12 9.04 9.08 9.00 9.61 9.99 2.20(2.00) 9.05 9.09 9.10 9.18 9.11 9.58 9.99 3.31 (3.00) 9.06 9.16 9.28 9.22 9.60 10.02 4.41 (4.00) 9.09 9.22 9.23 9.38 9.34 9.64 10.07 5.51 (5.00) 9.13 9.28 9.30 9.46 9.47 9.69 10.12 6.61 (6.00) 9.17 9.35 9.37 9.55 9.60 9.73 10.16 7.72 (7.00) 9.20 9.42 9.44 9.63 9.70 9.77 10.20 8.82(8.00) 9.23 9.50 9.51 9.73 9.79 9.80 10.23 9.92(9.00) 9.25 9.57 9.59 9.82 9.82 10.25 11.02 (10.00) 9.27 9.64 9.65 9.89 10.00 9.84 10.27 12.13 (11.00) 9.28 9.70 9.72 9.98 10.09 9.85 10.27 13.23 (12.00) 9.25 9.76 9.78 10.08 10.20 9.85 10.28 14.33 (13.00) 9.22 9.80 9.82 10.14 10.17 9.81 10.26 15.43 (14.00) 9.17 9.87 10.19 10.13 9.77 10.22 16.53 (15.00) 9.13 9.89 9.91 10.23 10.15 9.72 10.17 17.64 (16.00) 9.08 9.93 9.95 10.26 10.13 9.68 10.12 18.74 (17.00) 9.04 9.96 9.97 10.25 10.10 9.63 10.07 19.84(18.00) 8.99 9.98 9.99 10.21 10.05 9.58 20.94 (19.00) 8.94 10.00 10.00 10.16 10.01 9.97 22.05 (20.00) 9.98 9.98 23.15 (21.00) 8.85 9.93 9.91 9.43 9.87 24.25 (22.00) 10.02 25.35 (23.00) 8.75 9.82 9.33 9.77 26.46 (24.00) 8.70 9.77 9.77 9.92 9.28 9.72 27.56 (25.00) 8.65 9.72 9.72 9.73 9.23 9.67 33.07 (30.00) 8.21 9.48 9.48 9.65 9.53 8.93 9.43 38.58 (35.00) 7.55 9.21 9.22 9.38 9.37 8.27 8.83 38.85 (35.24) 7.51 9.19 9.20 9.37 9.35 8.24 8.80 44.09 (40.00) 6.82 8.79 8.80 8.98 8.94 7.62 8.18 49.60 (45.00) 5.63 8.21 8.21 8.42 8.41 6.63 7.39 Page 35
Monticello 0000-0146-5423-SRLR 0
1 Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 9552 9569 9570 9571 9572 9557 9573 54.64 (49.57) 3.98 55.12 (50.00) 7.28 7.29 7.39 7.40 5.17 6.21 55.50 (50.35) 7.18 7.18 7.29 7.30 5.04 6.08 58.07 (52.68) 4.20 60.63 (55.00) 5.81 5.82 5.97 5.97 60.70 (55.06) 4.38 63.50 (57.61) 4.90 4.91 5.06 5.06 63.64 (57.74) 4.85 63.66 (57.75) 4.86 64.05 (58.10) 4.89 64.09 (58.14) 4.88 Page 36
Monticello Rtln~nd ?6 0000-0146-5423-SRLR Rpvikinn 1 Table 16.3-10 MAPLHGR Limits Bundle Type: GE 14-PI ODNAB392-17GZ-100T-145-T6-2932 (GE 14C)
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 7357 7364 7365 7366 7367 7368 7369 0.00 (0.00) 9.41 8.36 8.56 8.61 8.52 9.81 10.52 0.22(0.20) 9.33 8.41 8.61 8.66 8.57 9.75 10.50 1.10(1.00) 9.12 8.50 8.69 8.76 8.70 9.61 10.43 2.20 (2.00) 9.06 8.62 8.80 8.90 8.88 9.58 10.43 3.31 (3.00) 9.08 8.75 8.92 9.05 9.07 9.61 10.46 4.41 (4.00) 9.11 8.88 9.04 9.20 9.25 9.65 10.51 5.51 (5.00) 9.15 9.01 9.16 9.35 9.43 9.70 10.55 6.61 (6.00) 9.19 9.14 9.27 9.48 9.57 9.74 10.58 7.72 (7.00) 9.23 9.28 9.38 9.64 9.74 9.78 10.61 8.82 (8.00) 9.25 9.40 9.51 9.81 9.92 9.81 10.64 9.92(9.00) 9.28 9.52 9.65 9.98 10.09 9.83 10.66 11.02 (10.00) 9.29 9.65 9.78 10.13 10.18 9.85 10.67 12.13 (11.00) 9.31 9.77 9.90 10.26 10.23 9.86 10.68 13.23 (12.00) 9.28 9.85 9.98 10.35 10.28 9.86 10.68 14.33 (13.00) 9.24 9.92 10.02 10.34 10.26 9.82 10.68 15.43 (14.00) 9.20 9.97 10.05 10.26 10.20 9.78 10.64 16.53 (15.00) 9.16 10.01 10.06 10.23 10.18 9.73 10.60 18.74 (17.00) 9.06 10.05 10.06 10.11 10.06 9.64 10.50 22.05 (20.00) 8.92 10.05 10.05 9.94 9.90 9.49 10.36 27.56 (25.00) 8.68 10.04 10.04 9.65 9.62 9.25 10.12 33.07 (30.00) 8.24 9.76 9.84 9.39 9.36 8.95 9.89 38.58 (35.00) 7.58 9.46 9.48 9.14 9.13 8.29 9.40 38.85 (35.24) 7.55 9.43 9.46 9.12 9.10 8.26 9.37 44.09 (40.00) 6.87 8.93 8.94 8.59 8.58 7.64 8.75 49.60 (45.00) 5.68 8.38 8.39 8.03 8.02 6.66 8.11 54.79 (49.71) 3.98 55.12 (50.00) 7.30 7.32 7.14 7.13 5.21 7.00 55.50 (50.35) 7.19 7.22 7.05 7.04 5.08 6.89 58.16 (52.77) 4.21 60.63 (55.00) 5.83 5.86 5.86 5.85 5.47 63.40 (57.52) 4.57 63.50 (57.61) 4.91 4.95 5.14 5.13 Page 37
Monticello 0000-0146-5423-SRLR D
1 ew1uu -a u IvIUI Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 7357 7364 7365 7366 7367 7368 7369 63.57 (57.67) 4.89 63.70 (57.79) 4.88 64.44 (58.46) 4.90 64.48 (58.50) 4.89 Page 38
Monticello 0000-0146-5423-SRLR D
I 1
- .IUU AU 1'~V3III Table 16.3-11 MAPLHGR Limits Bundle Type: GE14-P1ODNAB372-17GZ-10OT-145-T6-4175 (GEI4C)
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT(GWd/ST) 10785 10786 10787 10788 10789 10790 10791 0.00 (0.00) 9.41 8.34 8.67 8.69 8.64 9.81 10.39 0.22(0.20) 9.33 8.38 8.70 8.75 8.70 9.76 10.37 1.10 (1.00) 9.12 8.45 8.76 8.86 8.79 9.61 10.30 2.20(2.00) 9.05 8.54 8.85 8.98 8.90 9.58 10.31 3.31 (3.00) 9.06 8.65 8.95 9.08 9.01 9.60 10.34 4.41 (4.00) 9.09 8.76 9.19 9.12 9.64 5.51 (5.00) 9.13 8.87 9.17 9.31 9.24 9.69 10.43 6.61 (6.00) 9.17 8.99 9.27 9.43 9.37 9.73 10.47 7.72(7.00) 9.20 9.12 9.38 9.56 9.51 9.77 10.51 8.82 (8.00) 9.23 9.25 9.49 9.69 9.65 9.80 10.53 9.92(9.00) 9.25 9.39 9.61 9.83 9.80 9.82 10.55 11.02 (10.00) 9.27 9.51 9.73 9.97 9.96 9.84 10.57 12.13 (11.00) 9.28 9.63 9.85 10.10 10.13 9.85 10.58 13.23 (12.00) 9.25 9.70 9.95 10.18 10.21 9.85 10.58 14.33 (13.00) 9.22 9.75 10.00 10.20 10.09 9.81 10.58 15.43 (14.00) 9.17 9.81 10.02 10.11 9.93 9.77 10.54 16.53 (15.00) 9.13 9.88 10.03 10.05 9.89 9.72 10.49 17.64 (16.00) 9.08 9.83 9.94 10.00 9.85 9.68 10.44 18.74 (17.00) 9.04 9.78 9.84 9.95 9.63 10.39 19.84 (18.00) 8.99 9.74 9.77 9.58 20.94 (19.00) 8.94 9.71 9.71 9.85 9.71 10.29 22.05 (20.00) 9.66 23.15 (21.00) 8.85 9.61 9.76 9.62 9.43 10.19 25.35 (23.00) 8.75 9.50 9.67 9.53 9.33 10.09 26.46 (24.00) 8.70 9.49 9.28 10.05 27.56 (25.00) 8.65 9.42 9.41 9.58 9.45 9.23 10.00 33.07 (30.00) 8.21 9.20 9.19 9.39 9.26 8.93 9.77 38.58 (35.00) 7.55 9.03 9.01 9.18 9.12 8.27 9.25 38.85 (35.24) 7.51 9.01 8.99 9.15 9.10 8.24 9.22 44.09 (40.00) 6.82 8.54 8.54 8.73 8.68 7.62 8.60 49.60 (45.00) 5.63 8.04 8.05 8.19 8.14 6.63 7.96 54.64 (49.57) 3.98 I.--
Page 39
Monticello Dlr 1r -4 0000-0146-5423-SRLR D
- 1 1
I%
I u
U
.o 1v 1;; UII 1
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT(GWd/ST) 10785 10786 10787 10788 10789 10790 10791 55.12 (50.00) 7.19 7.22 7.40 7.39 5.17 6.79 55.50 (50.35) 7.09 7.13 7.32 7.30 5.04 6.68 58.07 (52.68) 4.20 60.63 (55.00) 5.77 5.85 6.23 6.20 5.19 62.69 (56.87) 4.52 63.44 (57.55) 4.88 63.50 (57.61) 4.93 5.33 5.39 63.70 (57.79) 4.87 64.88 (58.86) 4.91 65.11 (59.07) 4.93 Page 40
Monticello D I A 14 0000-0146-5423-SRLR D
1 1 L.I ua
%VU
-lA.V,1IUIL 1
Table 16.3-12 MAPLHGR Limits Bundle Type: GE 1 4-PI ODNAB3 86-16GZ-I OOT-I 45-T6-4176 (GE 1 4C)
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT(GWd/ST) 10785 10792 10793 10794 10795 10790 10796 0.00(0.00) 9.41 8.48 8.82 8.88 8.83 9.81 10.5 1 0.22 (0.20) 9.33 8.52 8.85 8.91 8.89 9.76 10.49 1.10(1.00) 9.12 8.58 8.90 8.97 8.97 9.61 10.41 2.20(2.00) 9.05 8.96 9.06 9.07 9.58 10.41 3.31 (3.00) 9.06 9.03 9.14 9.18 9.60 10.43 4.41 (4.00) 9.09 8.82 9.11 9.23 9.29 9.64 10.47 5.51 (5.00) 9.13 8.90 9.32 9.41 9.69 10.51 6.61 (6.00) 9.17 8.98 9.24 9.40 9.51 9.73 10.54 7.72 (7.00) 9.20 9.06 9.31 9.49 9.60 9.77 10.57 8.82(8.00) 9.23 9.15 9.38 9.58 9.69 9.80 10.60 9.92 (9.00) 9.25 9.24 9.46 9.67 9.78 9.82 10.62 11.02 (10.00) 9.27 9.33 9.53 9.77 9.84 10.63 12.13 (11.00) 9.28 9.43 9.61 9.86 9.98 9.85 10.64 13.23 (12.00) 9.25 9.48 9.67 9.95 10.07 9.85 10.64 14.33 (13.00) 9.22 9.54 9.71 10.01 10.04 9.81 10.64 15.43 (14.00) 9.17 9.61 10.07 10.08 9.77 10.60 16.53 (15.00) 9.13 9.80 10.11 10.11 9.72 10.55 17.64 (16.00) 9.08 9.75 9.84 10.14 10.09 9.68 10.50 18.74 (17.00) 9.04 9.81 9.87 10.16 10.06 9.63 10.46 19.84 (18.00) 8.99 9.86 9.89 10.16 10.01 9.58 20.94 (19.00) 8.94 9.89 9.91 9.96 22.05 (20.00) 9.88 9.91 23.15 (21.00) 8.85 9.84 9.89 9.86 9.43 10.26 24.25 (22.00) 9.78 9.96 10.21 25.35 (23.00) 8.75 9.78 9.77 9.33 10.16 26.46 (24.00) 8.70 9.68 9.86 9.72 9.28 27.56 (25.00) 8.65 9.63 9.68 9.80 9.68 9.23 10.07 33.07 (30.00) 8.21 9.39 9.41 9.54 8.93 9.83 38.58 (35.00) 7.55 9.14 9.14 9.29 9.27 8.27 9.34 38.85 (35.24) 7.51 9.12 9.12 9.27 9.25 8.24 9.31 44.09 (40.00) 6.82 8.69 8.71 8.92 8.85 7.62 8.69 49.60 (45.00) 5.63 8.12 8.13 8.36 8.34 6.63 8.05 Page 41
Monticello Reload 26 0000-0146-5423-SRLR Revision 1 Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT (GWd/ST) 10785 10792 10793 10794 10795 10790 10796 54.64 (49.57) 3.98 55.12 (50.00) 7.22 7.28 7.68 7.54 5.17 6.91 55.50 (50.35) 7.11 7.17 7.58 7.45 5.04 6.80 58.07 (52.68) 4.20 60.63 (55.00) 5.62 5.70 6.26 6.36 5.36 62.89 (57.06) 4.89 63.11 (57.26) 4.55 63.16 (57.30) 4.89 63.50 (57.61) 5.33 5.51 64.67 (58.67) 4.95 65.28 (59.23) 4.98 Page 42
Monticello 0000-0146-5423-SRLR D,
1 1ý..matL
%I.V a UiI Table 16.3-13 MAPLHGR Limits Bundle Type: GE 14-PI 0DNAB386-16GZ-10T-145-T6-4177 (GE 14C)
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT(GWd/ST) 10785 10797 10798 10799 10800 10790 10801 0.00(0.00) 9.41 8.50 8.61 8.60 8.53 9.81 10.38 0.22(0.20) 9.33 8.54 8.64 8.67 8.57 9.76 10.36 I.10( 1.00) 9.12 8.60 8.70 8.76 8.66 9.61 10.28 2.20(2.00) 9.05 8.68 8.78 8.85 8.77 9.58 10.28 3.31 (3.00) 9.06 8.86 8.95 8.88 9.60 10.32 4.41 (4.00) 9.09 8.84 8.94 9.05 9.00 9.64 10.36 5.51 (5.00) 9.13 8.93 9.03 9.15 9.12 9.69 10.40 6.61 (6.00) 9.17 9.02 9.11 9.26 9.25 9.73 10.44 7.72 (7.00) 9.20 9.11 9.37 9.39 9.77 10.48 8.82 (8.00) 9.23 9.20 9.30 9.48 9.53 9.80 10.50 9.92 (9.00) 9.25 9.30 9.38 9.57 9.67 9.82 10.52 11.02 (10.00) 9.27 9.39 9.46 9.67 9.78 9.84 10.54 12.13 (11.00) 9.28 9.48 9.54 9.78 9.85 10.55 13.23 (12.00) 9.25 9.54 9.60 9.88 10.01 9.85 10.55 14.33 (13.00) 9.22 9.59 9.66 9.98 10.10 9.81 10.55 15.43 (14.00) 9.17 9.64 9.73 10.06 10.08 9.77 10.50 16.53 (15.00) 9.13 9.79 10.13 10.05 9.72 10.46 17.64 (16.00) 9.08 9.76 9.85 10.18 10.03 9.68 10.41 18.74(17.00) 9.04 9.82 9.89 10.14 9.98 9.63 10.36 19.84 (18.00) 8.99 9.86 9.92 10.09 9.94 9.58 20.94 (19.00) 8.94 9.89 9.93 22.05 (20.00) 9.88 9.90 23.15 (21.00) 8.85 9.84 9.94 9.79 9.43 10.16 24.25 (22.00) 9.79 25.35 (23.00) 8.75 9.74 9.84 9.70 9.33 10.06 26.46 (24.00) 8.70 9.80 9.66 9.28 10.01 27.56 (25.00) 8.65 9.64 9.63 9.62 9.23 9.96 33.07 (30.00) 8.21 9.40 9.39 9.53 9.42 8.93 9.73 38.58 (35.00) 7.55 9.14 9.14 9.29 9.26 8.27 9.21 38.85 (35.24) 7.51 9.12 9.12 9.27 9.24 8.24 9.18 44.09 (40.00) 6.82 8.69 8.70 8.91 8.84 7.62 8.56 49.60 (45.00) 5.63 8.12 8.12 8.34 8.29 6.63 7.91 Page 43
Monticello Rplnti
'r 0000-0146-5423-SRLR T?-~cn I
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT(GWd/ST) 10785 10797 10798 10799 10800 10790 10801 54.64 (49.57) 3.98 55.12 (50.00) 7.23 7.25 7.66 7.59 5.17 6.73 55.50 (50.35) 7.12 7.14 7.56 7.51 5.04 6.62 58.07 (52.68) 4.20 60.63 (55.00) 5.65 5.68 6.23 6.45 5.11 62.49 (56.69) 4.51 63.02 (57.17) 4.88 63.12 (57.26) 4.88 63.50 (57.61) 5.30 5.53 64.64 (58.64) 4.94 65.26 (59.20) 4.96 Page 44
Monticello 0000-0146-5423-SRLR D
1 Iý.mau AU a~,I~ f V.
Table 16.3-14 MAPLHGR Limits Bundle Type: GE 1 4-PI ODNAB3 89-11 GZ-I OOT-145-T6-4178 (GE 1 4C)
Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT(GWd/ST) 10785 10802 10803 10804 10805 10790 10806 0.00(0.00) 9.41 9.03 9.03 8.99 8.94 9.81 10.09 0.22 (0.20) 9.33 9.04 9.05 9.05 9.01 9.76 10.06 1.10(1.00) 9.12 9.09 9.10 9.16 9.11 9.61 9.96 2.20(2.00) 9.05 9.15 9.16 9.30 9.25 9.58 9.95 3.31 (3.00) 9.06 9.21 9.23 9.42 9.40 9.60 9.99 4.41 (4.00) 9.09 9.28 9.30 9.51 9.51 9.64 10.04 5.51 (5.00) 9.13 9.35 9.37 9.59 9.63 9.69 10.08 6.61 (6.00) 9.17 9.41 9.45 9.68 9.76 9.73 10.13 7.72 (7.00) 9.20 9.49 9.52 9.77 9.88 9.77 10.16 8.82 (8.00) 9.23 9.56 9.60 9.87 9.98 9.80 10.19 9.92 (9.00) 9.25 9.64 10.08 9.82 10.22 11.02 (10.00) 9.27 9.71 9.76 10.06 10.17 9.84 10.23 12.13 (11.00) 9.28 9.79 9.83 10.14 10.26 9.85 10.24 13.23 (12.00) 9.25 9.86 9.89 10.20 10.26 9.85 10.25 14.33 (13.00) 9.22 10.23 10.21 9.81 10.23 15.43 (14.00) 9.17 9.93 10.24 9,77 10.18 16.53 (15.00) 9.13 9.92 9.95 10.25 10.23 9.72 10.13 17.64 (16.00) 9.08 9.94 9.97 10.25 10.18 9.68 10.09 18.74 (17.00) 9.04 9.96 9.97 10.25 10.13 9.63 10.04 19.84 (18.00) 8.99 9.96 9.98 10.23 9.58 20.94 (19.00) 8.94 9.97 9.97 10.03 22.05 (20.00) 9.94 9.97 23.15 (21.00) 8.85 9.94 10.08 9.93 9.43 9.83 24.25 (22.00) 9.84 9.78 25.35 (23.00) 8.75 9.82 9.98 9.83 9.33 9.73 26.46 (24.00) 8.70 9.73 9.93 9.79 9.28 9.68 27.56 (25.00) 8.65 9.68 9.72 9.88 9.74 9.23 9.64 33.07 (30.00) 8.21 9.43 9.46 9.67 9.54 8.93 9.40 38.58 (35.00) 7.55 9.16 9.19 9.42 9.36 8.27 8.79 38.85 (35.24) 7.51 9.14 9.16 9.40 9.34 8.24 8.76 44.09 (40.00) 6.82 8.71 8.71 9.02 8.92 7.62 8.14 49.60 (45.00) 5.63 8.13 8.12 8.43 8.41 6.63 7.33 Page 45
Monticello 0000-0146-5423-SRLR Average Planar Exposure MAPLHGR Limit (kW/ft)
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
Lat.
GWd/MT(GWd/ST) 10785 10802 10803 10804 10805 10790 10806 54.64 (49.57) 3.98 55.12 (50.00) 7.36 7.32 7.77 7.62 5.17 6.13 55.50 (50.35) 7.25 7.21 7.67 7.54 5.04 6.00 58.07 (52.68) 4.20 60.50 (54.88) 4.37 60.63 (55.00) 5.84 5.84 6.42 6.46 63.50 (57.61) 4.91 4.92 5.49 5.58 63.61 (57.71) 4.88 63.63 (57.72) 4.88 65.22 (59.17) 4.94 65.83 (59.72) 4.86 The core monitoring system monitors LHGR limits and ECCS-LOCA MAPLHGR limits separately; therefore, the new ECCS-LOCA MAPLHGR limits shown in Reference I for GE14C in Section 16.4 are unaffected by changes to the LHGR curve, and application of the GE14L-B36-G7-IMLTR LHGR curve is acceptable from the ECCS-LOCA perspective.
The single loop operation multiplier on MAPLHGR and the ECCS-LOCA analytical initial MCPR values applicable to GE14C fuel type in the new cycle core are shown in the following table.
Table 16.3-15 Initial MCPR and Single Loop Operation Multiplier on MAPLHGR The GE14C SLO multiplier applies to the EPU operating domain.
Monticello has an ECCS-LOCA PLHGR of 11.62 kW/ft for GEI4C fuel type.
16.4 References The SAFER/GESTR-LOCA analysis base reports applicable to the new cycle core are listed below.
Page 46
Monticello 0000-0146-5423-SRLR Reload 26 Revision 1 References for GE14C
- 1. Project Task Report Nuclear Management Company, LLC (NMC) Monticello Nuclear Generating Plant Exctended Power Uprate Task T0407: ECCS-LOCA SAFER/GESTR, GE-NE-0000-0060-9286-TR-R2, Revision 2, October 2011.
- 2. Monticello Nuclear Plant GEl4 ECCS-LOCA Evaluation with the RHR Intertie Line Open, NSA 01-459, October 10, 2001.
Page 47
Monticello p~axnwi ')
0000-0146-5423-SRLR Revision I 5
6 9
9 6
5 11 9
10 10 9
11 9
9 7
8 10 14 13 13 14 10 8
7 9
9 9
9 15 15 20 18 18 18 18 20 15 15 2
9 6
9 14 20 18 19 18 12 12 18 19 18 20 14 11 9
6 7
10 13 20 10 18 15 12 17 17 12 15 18 10 20 13 10 7
9 9
11 13 7
18 19 14 17 7
15 15 7
17 14 19 18 7
13 11 9
9 9
9 14 20 18 15 14 17 15 17 8
8 17 15 17 14 15 18 20 14 9
9 7
15 20 10 19 14 10 13 17 10 12 12 10 17 13 10 14 19 10 20 15 7
8 15 18 18 14 17 13 7
13 17 7
7 17 13 7
13 17 14 18 18 15 8
5 6
11 9
10 3
20 18 19 18 15 12 17 7
15 17 17 10 13 17 17 12 12 17 19 13 19 13 12 17 17 12 13 17 17 10 15 17 17 7
15 12 19 18 20 18 10 14 11 9
5 6
6 5
9 11 14 10 18 20 18 19 12 15 7 17 17 15 10 17 17 13 12 17 17 12 13 19 13 19 17 12 12 17 17 13 10 17 17 15 7 17 12 15 18 19 18 20 3 10 9
11 6
5 8
15 18 18 14 17 13 7
13 17 7
7 17 7
15 9
9 20 14 11 9
5 10 20 13 10 9
19 18 7 13 11 14 15 18 20 14 10 14 19 10 20 13 17 14 18 18 17 10 12 12 10 9
9 15 17 8
8 17 17 7
15 15 7
15 12 17 17 12 13 17 15 17 15 7 13 17 14 18 13 10 14 19 10 19 18 12 12 18 19 18 20 14 11 9
6 9
1 15 15 20 18 18 18 18 20 15 15 9
9 9
9 7
8 10 14 13 13 14 10 8
7 9
9 11 9
10 10 9
11 5
6 9
9 16 5
17 14 18 18 15 8
14 19 10 20 15 7
15 18 20 14 9
9 18 7
13 11 9
9 20 13 10 7
1 3
5 7
9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 Fuel Type I=GE14-P I ODNAB392-16GZ-1 OT-I 45-T6-2931 (Cycle 25) 12=GE14-PIODNAB373-16GZ-1 COT-145-T6-3375 (Cycle 26) 2=GE14-PI0DNAB375-16GZ-1 O0T-145-T6-3101 (Cycle 25) 13=GEI 4-PIODNAB391-16GZ-1 COT-I 45-T6-3376 (Cycle 26) 3=GEI 4-P I 0DNAB391 -15GZ-ICOT-145-T6-3377 (Cycle 26) 14=GE I 4-PI 0DNAB391-15GZ-I COT-I 45-T6-3377 (Cycle 26) 5=GE 14-P I 0DNAB392-16GZ-I COT-I 45-T6-2931 (Cycle 24) 15=GE I 4-PI ODNAB391-12GZ-1 COT-I 45-T6-3378 (Cycle 26) 6=GEl 4-PiODNAB392-17GZ-OCT-145-T6-2932 (Cycle 24) 16=GE1 4-PI DNAB392-17GZ-I COT-I 45-T6-2932 (Cycle 24) 7=GE I 4-PI ODNAB392-16GZ-10 0T-1 45-T6-2931 (Cycle 25) 17=GEl 4-PI0DNAB372-17GZ-10OT-1 45-T6-4175 (Cycle 27) 8=GEI 4-PI ODNAB424-14GZ-I OT-I 45-T6-3 100 (Cycle 25) 18=GE I 4-PI DNAB386-16GZ-I COT-I 45-T6-4176 (Cycle 27) 9=GE14-PI ODNAB375-16GZ-1 OCT-145-T6-3101 (Cycle 25) 19=GE1 4-PI ODNAB386-16GZ-1 COT-145-T6-4177 (Cycle 27) 1 =GEl 4-PI ODNAB392-16GZ-1 COT-1 45-T6-3102 (Cycle 25) 20=GE14-PIODNAB389-1 1GZ-0O0T-145-T6-4178 (Cycle 27)
I l=GE14-PI 0DNAB391 - 12GZ-I COT-145-T6-3103 (Cycle 25)
Figure 1 Reference Core Loading Pattern Page 48
Monticello Reload 26 0000-0146-5423-SRLR Revision I pwVCp US3HPw-levýuOC-Safmcm l7 140 120 "D
so 40 20 ISO 120 j40 0
-40 s0 70 so J40 30 20 10 1200I
- i 0
6 1t Is 20 25 Tmw two 0
5 10 is Thm ("
20 25 4.0 3.5 3.0 2.5 2.0 1.5 to
-0.5
-0,5
-1.0
-1.5
-2.0 400 0
5 o 1 15OO 1 s Thm to")
Figure 2 Plant Response to FW Controller Failure (EOC ICF (UB))
Page 49
Monticello 0000-0146-5423-SRLR Reload 26 Revision I TT 12C
+ "
n O
- 1
-....l mm 13lM 712W 12 730 1120 1+a6 1236*1111 0
-30 1N o a~
usa 0
1 2
3 4
5 6
0 1
2 3
4 5
6 Thu. Onoi r~oe 40 4.0.
S~*j T "
DePPOr TOMPWW RgwMV 120 2.
2.51 0io
-0.5 0,0
-1.0
.40
-1.5 0
1 2
3 4
5 6
0 1
2 3
4 5
6 1 M4)
Vbm fee*)
Figure 3 Plant Response to Turbine Trip with Bypass (EOC ICF (UB))
Page 50
Monticello 0000-0146-5423-SRLR D,,,;; r 1
TTN3P U3NrWWWFOC4M2*-C.
140 1*0
'a "Is 40 20.
0 120.
70 50 j40 30 20 10 1200I=
1100 1000 "m
I=.
o 1
2 3
rwe m e) 4 5
6 UI 10
- ~---.--*
20 I.I II 0
410
-2.0.-
+
0 1
2 3
4 5
6 0
1 2
3 4
S Figure 4 Plant Response to Turbine Trip w/o Bypass (EOC ICF (UB))
6 Page 51
Monticello D I 1
"11 0000-0146-5423-SRLR D
1 UVuasa S!ýA'!U1 Lrw U3.NWW~lclEoc4hUCcm an 140 RV0 SV A
~F I-.- -&O t
m0 I a 1 s so 110 30 20 10 1300 12S0 1160 lows 0
No0 0
1 2
3 imm fee" 4
5 6
I S
0 1
÷+.
÷......
l-20
-2.0
-4+x_.*
+....
.÷......
+......
2 3
4 6
a 0
1 2
3 4
6 6
rm "so Tm" (o Figure 5 Plant Response to Load Rejection w/o Bypass
( EOC ICF (UB))
Page 52
Monticello Reload 26 0000-0146-5423-SRLR Revision 1 HPOLI U5..NPWlCF-WC~las-Cm" ON 2?
140 IS Sso 40 so 70 sO 540 MR 30 26 10 1306 1306 126 1200 "I
1050 6
0 5
V0 is 20 25 30 35 Thus o 5
10 15 20 25 30 35 Thm -"O tos us 1204ý N +
ro-w
-*-I aF R
MR ~hu gmP I40 30j 4.0 3.5 3.0 2.5 2.0 1.5 1.0
-1.5
.401 4 0 1 ---- -
++, I+&+÷o+j+*
6 4
+ ------
+e 4+ 0
-2.0
-r+
+°+*-+-+
+÷++
0 a
10 15 20 26 30 35 0
5 10 Is Figure 6 Plant Response to Inadvertent HPCI /L8 (EOC ICF (UB))
20 2s 30 35 "mh -G)
Page 53
Monticello 0000-0146-5423-SRLR V
-x;-cn 1 K v 1013" H3SNWIQCVP.EOC-fttcaft 420 I
240i loc 1400 1360 1360 1210Is 110 ime 0
1 2
3 4
5 6
7 8
Tlm Ooo 120 40 40 0
1 L o ~ r am *.m 40 4.0 3.5 3.0 301 2.5 2.0 1.
201 CO 1to]
-0.5
-1,0
-1.5 o
-2.0 2 e4 6
a 8
0 1
2 3
4 Figure 7 Plant Response to MSIV Closure (Flux Scram) - (EOC ICF (HBB))
Page 54
Monticello 1 q~,AI"A 0000-0146-5423-SRLR I&~ua y
~'15~
law
~NPWFLCJP!OC4bssCft*
aml 27 140 so 430 s0 70 so no 24 0 0
120 20 so 10 a
a I-a-M DNAV*
Powm lm
-1200
.11M 110*
1100
.1080 13W 1430 0
1 2
3 4
5 S
7 Thu 08 0
1 2
3 4
5 6
7 TIM 106 120 40 4.0 3.5 30 301 2.5 2.0 1S 20 10 II0.5 0.0
-0.5
-1.0
-1.5 0
-2.0 0
0 1
2 3
4 8
6 7
0 1
2 3
4 5
Figre Pa RM(
(Hme))
Figure 8 Plant Response to MISIV Closure (Flux Scram) - (EOC LCFT (HBB))
Page 55
Monticello Reload rl'?-
0000-0146-5423-SRLR Revikinn 1 110 100 90 80 70 60 50 S40 30 20 10 0 - Natuial UirclalohnLin&
I
&a txtend~d Operiting Dohmam
- I--
SP SdramRe~ion BoLndary-------
---+-- BSP ControlledEntry Wlegion Boundary i
i t
I I
II I
-I - -
n".....
P.
S i
i I
i i
I I
I I
I I
i I
-A V -
I---i-B2 --
~~~~~~~
~ ~ ~ ~
I 0 10 20 30 40 50 60 70 80 90 100 110 120 Core Flow(%)
Figure 9 BSP Region Boundaries Page 56
Monticello 0000-0146-5423-SRLR I?
r; n 1
ý W.
I aw.
Appendix A Analysis Conditions The reactor operating conditions used in the reload licensing analysis for this plant and cycle are presented in Table A-I. The pressure relief and safety valve configuration for this plant are presented in Table A-2. Additionally, the operating flexibility options listed in Section 8 are supported by the reload licensing analysis.
Table A-1 Reactor Operating Conditions Analysis Value ICF LCF' 6 Parameter NFWT NFWT Thermal power, MWt 2004.0 2004.0 Core flow, Mlb/hr 60.5 46.1 Reactor pressure (core mid-plane), psia 1041.0 1036.3 Inlet enthalpy, Btu/Ilb 524.8 517.1 Non-fuel power fraction17 NA NA Steam flow, Mlb/hr 8.39 8.39 Dome pressure, psig 1010.2 1009.8 Turbine pressure, psig 943.9 943.7 Table A-2 Pressure Relief and Safety Valve Configuration Valve Type Number of Lowest Setpoint Valves (psig)
Safety/Relief Valve 8
1170 (Relief Mode) 16 The low core flow analysis condition used a bounding core flow value.
17 The non-fuel power fraction is not available from TRACG04 Page 57
Monticello 0000-0146-5423-SRLR Reload 26 Revision I Appendix B Thermal-Mechanical Compliance A thermal-mechanical compliance check is performed to assure that the fuel will operate without violating the thermal-mechanical design limits. These limits are designed such that reactor operation within these limits provides assurance that the fuel will not exceed any thermal-mechanical design or licensing limits during all modes of operation. The fuel thermal-mechanical limits are met for the current cycle.
Page 58
Monticello 0000-0146-5423-SRLR Reload 26 Revision I Appendix C Decrease in Core Coolant Temperature Event The Loss-of-Feedwater Heating event was analyzed at 100% rated power using the BWR Simulator Code. The use of this code is consistent with the approved methodology. The transient plots, neutron flux and heat flux values normally reported in Section 9 are not an output of the BWR Simulator Code; therefore, those items are not included in this document. The OLMCPR result is shown in Section 11.
Page 59
Monticello Reload 26 0000-0146-5423-SRLR Revision 1 Appendix D Off-Rated Limits Off-Rated Power Dependent Limits ARTS power dependent thermal limits have been developed for operation with all Equipment In-Service and a Pressure Regulator Out-Of-Service (PROOS) in Reference D-1.
The MCPRp limits provided in Reference D-I are based on a SLMCPR of 1. 15.
MCPRp Limits for:
Base Case Limits for Power < 40. 0%
Flow > 50.0%
Flow <50.0%
Power (%)
Limit Power (%)
Limit MCPRp MCPRp 25.0 3.62 25.0 2.83 40.0 2.91 40.0 2.37 Limits for Power Ž 40.0%
Power (%)
Limit Kp 40.0 1.323 60.0 1.150 90.0 1.056 100.0 1.000 Page 60
Monticello R-Innimits 0000-0146-5423-SRLR Revisinn 1 MCPRp Limits for:
Pressure Regulator Out-of-Service Limits for Power < 40. 0%
Flow > 50.0%
Flow < 50.0%
Power (%)
Limit Power (%)
Limit MCPRp MCPRp 25.0 3.62 25.0 2.83 40.0 2.91 40.0 2.37 Limits for Power Ž40.0%
Power (%)
Limit Kp 40.0 1.550 60.0 1.460 85.0 1.240 85.0 1.072 90.0 1.056 100.0 1.000 LHGRFACp/MAPFACp Limits for:
Base Case Limits for Power < 40. 0%
Flow > 50.0%
Flow _< 50.0%/
._ Power (%)
Limit Power (%)
Limit 25.0 0.496 25.0 0.522 S40.0 0.519 40.0 0.638
--Limits~for Powver > 40. 0%
Power (%)
Limit 40.0 0.687 100.0 1.000 LHGRFACp/MAPFACp Limits for:
Pressure Regulator Out-of-Service Limits for Power < 40. 0%
Flow > 50.0%
Flow < 50.0%
Power (o)
Limit Power (%)
Limit 25.0 0.496 25.0 0.522 40.0 0.519 40.0 0.638
-Limits for Power >ý 40.0%
_Power Limit 40.0 0.645 85.0 0.825 85.0 0.894 100.0 1.000 Page 61
Monticello D 1 4 'A 0000-0146-5423-SRLR D -cncnn 1
Off-Rated Flow Dependent Limits The flow dependent ARTS MCPR limits are documented in Reference D-1. The flow dependent LHGRFAC/MAPFAC limits are documented in Reference D-2. The off-rated flow dependent limits provided in References D-I and D-2 have been validated for this cycle.
The MCPRf limits provided in Reference D-1 are based on a SLMCPR of 1.15.
MCPRf Limits for:
Base Case Limits for a Maximum Runout Flow of 107.0%
Li fs or x
um Flo of
- 10.
0%..
Flow (%)
Limit MCPRf 30.0 1.64 94.4 1.23 107.0 1.23 MCPRf Limits for:
Pressure Regulator Out-of-Service Limits for a Maximum Runout Flow of107.0%
Flow (%)
Limit MCPRf 30.0 1.64 94.4 1.23 107.0 1.23 LHGRFACf Limits for:
Base Case Limits for a Maximum Runout Flow of 107.0%
Flow (%)
Limit 30.0 0.660 80.0 1.000 107.0 1.000 LHGRFACf Limits for:
Pressure Regulator Out-of-Service Limits for a Maximum Runout Flow of 107.0%
Flow (%)
Limit 30.0 0.660 80.0 1.000 107.0 1.000 Page 62
Monticello 0000-0 146-5423-SRLR Revikinn 1 Reload 26 MAPFACf Limits for:
Base Case Limits for a Maximum Runout Flow of 107. 0%
Flow (%)
I Limit 30.01 0.660 80.0 1.000 107.0 1.000 MAPFACf Limits for:
Pressure Regulator Out-of-Service Limits for a Maximum Runout Flow of 107.0%
Flow (%)
Limit 30.0 0.660 80.0 1.000 107.0 1.000 References D-1 Monticello Nuclear Generating Plant Offrated Limits and Pressure Regulator Downscale Failure Analysis at MELLLA +, 0000-0131-4356-RI, Revision 1, January 2012.
D-2 Monticello Nuclear Generating Plant 0ffi'ated Limits and Pressure Regulator Downscale Failure Analysis at EPU, 0000-0108-2960-RO, Revision 0, November 2009.
Page 63
Monticello 0000-01 46-5423-SRLR Reload 26 Revision I Appendix E Mislocated Fuel Loading Error The Monticello Nuclear Generating Plant Cycle 27 Mislocated Fuel Loading Error analysis was evaluated. The event is non-limiting for fuel types through GE14 if the following condition is satisfied:
OLMCPRpi,,, Icie >- 1.28 x (SLMCPRpia,,/CIVIC / 1.07)
This criterion has been demonstrated to be generically applicable to GEl4 reloads.
The minimum OLMCPR calculated for Monticello Cycle 27 is 1.62 (shown in Section II for GE14 fuel from BOC27 to EOC27) while the plant/cycle specific SLMCPR is 1.15. Using 1.15 in the equation yields 1.38 on the right side.
Using these values the above equation would yield 1.62 > 1.38.
Therefore, the Mislocated Fuel Loading Error is non-limiting for Monticello Cycle 27.
Page 64
Monticello 0000-0146-5423-SRLR Reload 26 Revision I Appendix F Turbine Trip with Bypass and Degraded Scram The Turbine Trip with Bypass (TTWBP) event was analyzed with the postulated Option A degraded scram and an OLMCPR value was determined. No Option B analysis was performed for the TTWBP.
The Option A calculated OLMCPR for the TTWBP is used for Option B and this value sets the OLMCPR limit for Option B because it is higher than the most limiting OLMCPR calculated for a pressurization event. Therefore, if the cycle average scram time does not satisfy the criterion provided in Reference F-I and Monticello Nuclear Generating Plant decides to interpolate between Option A and Option B scram times, this can be accomplished by using the procedure provided in Reference F-I with the following modification to Equation 4 of Reference F-1:
The modified equation to establish the new operating limit for pressurization events is given below:
OLMCPRN*,, = MAXr OLMCPROp,,,o B + *rave -1 B AOLMCPR, OLMCPRrIrp TA -
r)
(4) where: Tave and TB are defined in Equations I and 3 of Reference F-I, respectively; TA =
the technical specification limit on core average scram time to the 20 percent insertion position OLMCPR Option B =
the most limiting OLMCPR calculated for a pressurization event actually analyzed for Option B AOLMCPR=
the difference between OLMCPR Option A and OLMCPR Option B For Monticello Cycle 27, the OLMCPRs for the HPCIL8 event are 1.74 for Option A and 1.54 for Option B. Therefore, the AOLMCPR for the HPCIL8 event is 0.20. The OLMCPR for the TTWBP event is 1.62.
This approach is cycle independent with the TTWBP analyzed in this manner as long as the cycle specific OLMCPR Option B and AOLMCPR values are used in the calculation.
References F-1.
Monticello Option B Licensing Basis, LRC03.040, March 24, 2003 from L. R. Conner to Rick Rohrer.
Page 65
Monticello DI 1 I,**A0*
0000-0146-5423-SRLR D-,;Ae-1 I -
Appendix G Monticello Non-Standard SRLR Items This appendix contains Monticello non-standard SRLR items that are being provided at the request of Xcel Energy.
Additional Section 9 Information For the inadvertent HPCI event, the level 8 trip was modeled as the OPL-3 setpoint value. The turbine trip signal is initiated manually after the narrow-range water level has reached equilibrium. This was done since confirmation could not be obtained that a level 8 event would not occur during this event.
Additional Section 11 Information The following table summarizes the cycle rated power and flow MCPR values for the events reported in this SRLR. If the event's Option A or Option B limit are merged together in a single column, then the event cannot be interpolated based on scram times. For a description of how to implement Option B scram times see Appendix F.
Cycle MCPR values Exposure range: BOC27 to EOC27 Option A Option B GE14C GE14C FW Controller Failure Not Limiting Not Limiting Load Reject w/o Bypass Not Limiting Not Limiting Turbine Trip w/o Bypass Not Limiting Not Limiting Inadvertent HPCI /L8 Turbine Trip 1.74 1.54 Loss of Feedwater Heating 1.34 Fuel Loading Error (misoriented) 1.37 Fuel Loading Error (mislocated)
Determined to be non-limiting SLO Pump Seizure 1.45 Turbine Trip with Bypass 1.62 Control Rod Withdrawal Error (RBM setpoint at 114%)
1.40 Load Rejection with Bypass' 8 Determined to be non-limiting LOCA Analysis Limit MCPR 1.35 18 This event corresponds to "Single Turbine Control Valve Slow Closure (GESIL 502)". Since Cycle 22 results for this event were far from limiting and no significant changes have occurred that would significantly increase this event's results for this cycle, this event was determined to be non-limiting.
Page 66
Monticello 0000-0146-5423-SRLR Reload 26 Revision I Additional Section 12 Information The Dome Pressure Safety Limit, provided via the OPL-3, of 1332.0 psig is satisfied.
Additional Section 16 Information These analyses indicate that plant operation up to 376 MWt with the RHR intertie line open is acceptable from an ECCS performance standpoint, provided a MAPLHGR multiplier of 0.75 is implemented or that the peak bundle power does not exceed 3.9 MWt.
The power and flow dependent LHGRFAC multipliers are sufficient to provide adequate protection for the off-rated conditions from an ECCS-LOCA analysis perspective and there is no need for additional MAPFAC multipliers for the ECCS-LOCA evaluation.
No single-loop operation multiplier on PLHGR is required.
Maximum Subcritical Banked Withdrawal Position (MSBWP)
The Maximum Subcritical Banked Withdrawal Position analysis confirmed that the reference core loading pattern satisfied cold shutdown margin requirements including bank position 04.
Page 67
Monticello 0000-0146-5423-SRLR Reload 26 Revision I Appendix H TRACG04 AOO Supplementary Information Reference H-I provides the results of the evaluations supporting the application of TRACG04 for AOO analyses for Monticello. Section 11 of this report presents the MCPR limits based on the TRACG04 methodology of Reference H-2.
The safety evaluation report for licensing topical report NEDE-32906P (Reference H-2) concluded that the application of TRACG04 methods to AOO and overpressure transient analyses were acceptable subject to certain limitations and conditions.
Several of these conditions request that additional, application-specific information be provided. The information provided below responds to these requests for the identified items.
Limitation/Condition 23 (Transient LHGR Limitation 3)
The Transient LHGR Limitation 3 specified in Reference H-2 requires that in order to account for the impact of void history bias, plant-specific EPU and MELLLA+ applications using either TRACG04 or ODYN will demonstrate an equivalent to 10 percent margin to the fuel centerline melt and the 1 percent cladding circumferential plastic strain acceptance criteria due to pellet-cladding mechanical interaction for all of the limiting AOO transient events, including equipment out-of-service. Limiting transients in this case, refers to transients where the void reactivity coefficient plays a significant role (such as pressurization events).
The analyses for Monticello Cycle 27 met the conditions of the Void Reactivity Coefficient Correction Model Condition.(Limitation 21 of Reference H-2) and the Void Reactivity Coefficient Correction Model Basis Condition (Limitation 22 of Reference H-2); and therefore per Limitation 23 of Reference H-2, the pressurization transient events are not required to demonstrate 10 percent margin to the fuel centerline melt and the 1 percent cladding circumferential plastic strain acceptance criteria.
References for Appendix H H-I. Monticello TRACG hnplementation for Reload Licensing Transient Analysis, 0000-0082-0062-R1, Revision 1, May 2010.
H-2. Final Safet Evaluation of GE Hitachi Nuclear Energy Americas, LLC Licensing Topical Report NEDE-32906P, Supplement 3-A, "Migration to TRACGO4/PANACI1 firom TRACGO2/PANACI Ofor TRACGAOO and ATWS Overpressure Transients ", Revision 1, April 2010.
Page 68
Monticello 0000-0146-5423-SRLR Reload 26 Revision I Appendix I NEDC-33173P-A Supplementary Information The safety evaluation for licensing topical report NEDC-33173P-A (Reference I-1) concluded that the application of GEH/GNF methods to expanded operating domains was acceptable subject to certain limitations and conditions.
Several of these conditions request that additional, application-specific information be provided. The information provided below responds to these requests for the identified items.
Limitation/Condition 6 (R-factor)
The plant specific R-factor calculation at a bundle level was performed consistent with lattice axial void conditions expected for the hot channel operating state applicable to this cycle of operation.
For Monticello Cycle 27 at the EPU licensed power level, a 60% void profile was used for the calculation of bundle R-factors.
Limitation/Condition 10 (Transient LHGR 2)
The Transient LHGR 2 limitation specified in Reference I-1 requires each EPU and MELLLA+ fuel reload to document the calculation results of the analyses demonstrating compliance to transient T-M acceptance criteria. Table I-1 summarizes the percent margin to the Thermal Overpower and Mechanical Overpower limits.
Table I-1 Margin to the Thermal Overpower and Mechanical Overpower Limits Criteria GE14C Thermal Overpower 7.85%
Mechanical Overpower 7.91%
Limitation/Condition 11 (Transient LHGR 3)
The Transient LHGR 3 limitation specified in Reference 1-1 requires that in order to account for the impact of the void history bias, plant-specific EPU and MELLLA+ applications using either TRACG04 or ODYN will demonstrate an equivalent to 10 percent margin to the fuel centerline melt and the I percent cladding circumferential plastic strain acceptance criteria due to pellet-cladding mechanical interaction for all of the limiting AOO transient events, including equipment out-of-service. Limiting transients in this case, refers to transients where the void reactivity coefficient plays a significant role (such as pressurization events).
Page 69
Monticello 0000-0146-5423-SRLR Reload 26 Revision I However, as stated in Appendix H the void history bias was incorporated into the transient model within the TRACG04 code, and therefore the 10 percent margin to the fuel centerline melt and the 1 percent cladding circumferential plastic strain acceptance criteria is no longer required.
Limitation/Condition 14 (Part 21 Evaluation of GESTR-M Fuel Temperature Calculation)
GE14 LHGR limits applied to Monticello Cycle 27 EPU License incorporate a 350 psi penalty on fuel rod critical pressure in the fuel rod internal pressure design ratio. These limits comply with the NRC's conclusions regarding this subject (Reference 1-2).
Limitation/Condition 17 (Steady State 5 Percent Bypass Voiding)
The bypass voiding condition was evaluated for the licensed core loading and confirmed that the bypass void fraction remained below 5 percent at all LPRM levels when operating at steady-state conditions within the licensed upper boundary. For a power/flow condition that conservatively bounded the licensed power/flow upper boundary, the bypass void fraction at the D level LPRM location was calculated to be 0.0%.
Limitation/Condition 19 (Void-Quality Correlation 1)
The OLMCPR limitation requiring an additional 0.01 adder on the OLMCPR does not apply to EPU or MELLLA+ licensing calculations when TRACG04 methods are used (Reference 1-3). Therefore, the OLMCPR adder is not applied to Monticello Cycle 27.
References for Appendix I I-1. Applicability of GE Methods to Expanded Operating Domains, NEDC-33173P-A, Revision 4, November 2012.
1-2. Applicability of GE Methods to Expanded Operating Domains, NEDC-33173P-A, Revision 1, September 2010.
1-3. Final Safety Evaluation of GE Hitachi Nuclear Energy Americas, LLC Licensing Topical Report NEDE-32906P, Supplement 3-A, "Migration to TRACGO4/PANAC1]from TRACGO2/PANACIO for TRACG AO0 and A TWS Overpressure Transients ", Revision 1, April 2010.
Page 70
Monticello D*I.,,
A*1 0000-0146-5423-SRLR D
I I';ua v U
'I~V a U11 Appendix J List of Acronyms Acronym Description ACPR Delta Critical Power Ratio Ak Delta k-effective 2RPT (2PT)
Two Recirculation Pump Trip ADS Automatic Depressurization System ADSOOS Automatic Depressurization System Out of Service AOO Anticipated Operational Occurrence APRM Average Power Range Monitor ARTS APRM, Rod Block and Technical Specification Improvement Program BOC Beginning of Cycle BSP Backup Stability Protection BWROG Boiling Water Reactor Owners Group COLR Core Operating Limits Report CPR Critical Power Ratio DIRPT Delta MCPR over Initial MCPR for a two-Recirculation Pump Trip DIVOM Delta CPR over Initial MCPR vs. Oscillation Magnitude DR Decay Ratio DS/RV Dual Mode Safety/Relief Valve ECCS Emergency Core Cooling System ELLLA Extended Load Line Limit Analysis EOC End of Cycle (including all planned cycle extensions)
EOR End of Rated (All Rods Out 100%Power / 100%Flow / NFWT)
EPU Extended Power Uprate ER Exclusion Region FFWTR Final Feedwater Temperature Reduction FMCPR Final MCPR FOM Figure of Merit FWCF Feedwater Controller Failure FWHOOS Feedwater Heaters Out of Service FWTR Feedwater Temperature Reduction GESTAR General Electric Standard Application for Reactor Fuel GETAB General Electric Thermal Analysis Basis GSF Generic Shape Function HAL Haling Bum HBB Hard Bottom Bum HBOM Hot Bundle Oscillation Magnitude HCOM Hot Channel Oscillation Magnitude HFCL High Flow Control Line HPCI High Pressure Coolant Injection HTSP High Trip Set Point ICA Interim Corrective Action Page 71
Monticello Rplnid ?6 0000-0146-5423-SRLR Rpvi-ion 1
Acronym Description ICF Increased Core Flow IMCPR Initial MCPR ITSP Intermediate Trip Set Point IVM Initial Validation Matrix Kf Off-rated flow dependent OLMCPR multiplier Kp Off-rated power dependent OLMCPR multiplier L8 Turbine Trip on high water level (Level 8)
LCF Low Core Flow LHGR Linear Heat Generation Rate LHGRFACf Off-rated flow dependent LHGR multiplier LHGRFACp Off-rated power dependent LHGR multiplier LOCA Loss of Coolant Accident LPRM Local Power Range Monitor LRHBP Load Rejection with Half Bypass LRNBP Load Rejection without Bypass LTR Licensing Topical Report LTSP Low Trip Set Point MAPFACf Off-rated flow dependent MAPLHGR multiplier MAPFACp Off-rated power dependent MAPLHGR multiplier MAPLHGR Maximum Average Planar Linear Heat Generation Rate MCPR Minimum Critical Power Ratio MCPRf Off-rated flow dependent OLMCPR MCPRp Off-rated power dependent OLMCPR MELLLA Maximum Extended Load Line Limit Analysis MELLLA+
MELLLA Plus MOC Middle of Cycle MRB Maximal Region Boundaries MSF Modified Shape Function MSIV Main Steam Isolation Valve MS1VOOS Main Steam Isolation Valve Out of Service MSR Moisture Separator Reheater MSROOS Moisture Separator Reheater Out of Service MTU Metric Ton Uranium MWd Megawatt day MWd/ST Megawatt days per Standard Ton MWd/MT Megawatt days per Metric Ton MWt Megawatt Thermal N/A Not Applicable NBP No Bypass NCL Natural Circulation Line NFWT Normal Feedwater Temperature NOM Nominal Bum NTR Normal Trip Reference OLMCPR Operating Limit MCPR OOS Out of Service Page 72
Monticello 0000-0146-5423-SRLR D
1 l
.IU v au
- j. I*.K,,V IaIUI t
i Acronym Description OPRM Oscillation Power Range Monitor Pbypass Reactor power level below which the TSV position and the TCV fast closure scrams are bypassed Pdome Peak Dome Pressure Psi Peak Steam Line Pressure Pv Peak Vessel Pressure PCT Peak Clad Temperature PHE Peak Hot Excess PLHGR Peak Linear Heat Generation Rate PLU Power Load Unbalance PLUOOS Power Load Unbalance Out of Service PRFDS Pressure Regulator Failure Downscale PROOS Pressure Regulator Out of Service Q/A Heat Flux RBM Rod Block Monitor RC Reference Cycle RCF Rated Core Flow RFWT Reduced Feedwater Temperature RPS Reactor Protection System RPT Recirculation Pump Trip RPTOOS Recirculation Pump Trip Out of Service RV Relief Valve RVM Reload Validation Matrix
-RWE Rod Withdrawal Error
-SC Standard Cycle SL Safety Limit SLMCPR Safety Limit Minimum Critical Power Ratio SLO Single Loop Operation
_SRLR Supplemental Reload Licensing Report S/RV (SRV)
Safety/Relief Valve SRVOOS Safety/Relief Valve(s) Out of Service SS Steady State SSV Spring Safety Valve STU Short Tons (or Standard Tons) of Uranium TBV Turbine Bypass Valve TBVOOS Turbine Bypass Valves Out of Service TCV Turbine Control Valve TCVOOS Turbine Control Valve Out of Service TCVSC Turbine Control Valve Slow Closure TLO Two Loop Operation TRF Trip Reference Function TSIP Technical Specifications Improvement Program TSV Turbine Stop Valve TSVOOS Turbine Stop Valve Out of Service TT Turbine Trip Page 73
Monticello D* Il,*
If, 0000-0146-5423-SRLR D
,i; 1
Acronym Description TTHBP Turbine Trip with Half Bypass TTNBP Turbine Trip without Bypass UB Under Bum Page 74